Opportunities Preloader

Please Wait.....

Report

Worldwide Data Center Construction Market - Investment Prospects in 9 Regions and 51 Countries

Market Report I 2023-05-17 I 304 Pages I Arizton Advisory & Intelligence

The global data center construction market is expected to grow at a CAGR of 6.50% from 2022 to 2028.

KEY HIGHLIGHTS

- In 2022, the global data center construction market witnessed investments of over USD 50 billion owing to investments from colocation operators, such as Equinix, Digital Realty, Vantage Data Centers, STACK Infrastructure, Iron Mountain, QTS Realty Trust, NTT Global Data Centers, DataBank, and ST Telemedia Global Data Centres.
- Hyperscalers, such as Meta (Facebook), Microsoft, Amazon Web Services (AWS), and Google, also aid the market with investments. These companies expand their global presence, focusing on emerging locations across Europe and APAC.
- Aside from AWS, Google, and Microsoft, cloud operators include Alibaba Cloud, Tencent Cloud, Oracle, IBM Cloud, and OVHcloud. They are involved in the development of several cloud regions globally, which will increase data center investments.
- In 2022, the data center construction market witnessed supply chain-related challenges to support infrastructure providers. This recovered to an extent in the latter half of 2022. However, prices of raw materials have since risen, leading to higher costs for data center investors.

MARKET TRENDS & DRIVERS

- The adoption of advanced UPS batteries, such as lithium-ion, nickel-zinc, and Prussian blue sodium-ion batteries; software-defined data centers (SDDC); and artificial intelligence (AI) in power monitoring and microgrid adoption in data centers are some innovations.
- Operators assign certain liquid-cooled racks/spaces in data centers for HPC, while other spaces are cooled using traditional air-cooling methods. The liquid-cooling method enables operators to minimize their operating expenditure (OPEX) even though it may take a higher CAPEX to set up.
- Several countries are working toward the increased adoption of Big data and IoT. For instance, digital infrastructure and Big data are major pillars of Oman's digital future under the Oman 2040 Vision. The finance & banking, oil & gas, and transportation sectors use Big data and digitalization infrastructure to support Oman's government vision.
- Some recent innovations include adopting eco diesel, and natural gas generators, using hydrogen-based fuel cells, replacing diesel fuel with hydrotreated vegetable oil (HVO), and others.

SEGMENTATION ANALYSIS

The report includes the investment in the following areas:

Segmentation by Facility Type
- Hyperscale Data Centers
- Colocation Data Centers
- Enterprise Data Centers

Segmentation by Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction

Segmentation by Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgears
- PDUs
- Other Electrical Infrastructure

Segmentation by Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure

Segmentation by Cooling Systems
- CRAC & CRAH Units
- Chiller Units
- Cooling Towers, Condensers, & Dry Coolers
- Economizers & Evaporative Coolers
- Other Cooling Units

Segmentation by Cooling Technique
- Air-based Cooling
- Liquid-based Cooling

Segmentation by General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Building & Engineering Design
- Fire Detection & Suppression
- Physical Security
- DCIM

Segmentation by Tier Standards
- Tier I & Tier II
- Tier III
- Tier IV

VENDOR ANALYSIS

Support Infrastructure Vendors

1. ABB
2. Caterpillar
3. Cummins
4. Delta Electronics
5. Eaton
6. Legrand
7. Rolls-Royce
8. Schneider Electric
9. STULZ
10. Vertiv
11. 3M
12. Airedale
13. Alfa Laval
14. Asetek
15. Assa Abloy
16. Bloom Energy
17. Carrier
18. Condair
19. Cormant
20. Cyber Power Systems
21. Daikin Applied
22. Data Aire
23. Enlogic
24. FNT Software
25. Generac Power Systems
26. Green Revolution Cooling (GRC)
27. HITEC Power Protection
28. Honeywell
29. Johnson Controls
30. KOHLER
31. KyotoCooling
32. Mitsubishi Electric
33. Munters
34. Natron Energy
35. NetZoom
36. Nlyte Software
37. Panduit
38. Piller Power Systems
39. Rittal
40. Siemens
41. Trane
42. Tripp Lite
43. Yanmar (HIMOINSA)
44. ZincFive

Data Center Contractors

1. AECOM
2. Arup
3. Corgan
4. DPR Construction
5. Fortis Construction
6. Holder Construction
7. Jacobs
8. Mercury
9. Red Engineering
10. Rogers-O'Brien Construction
11. Syska Hennessy Group
12. Turner Construction
13. Turner & Townsend
14. AlfaTech
15. Atkins
16. Aurecon
17. Basler & Hofmann
18. BlueScope Construction
19. Brasfield & Gorrie
20. CallisonRTKL
21. Cap Ingelec
22. Clark Construction Group
23. Climatec
24. Clune Construction
25. COWI
26. DC PRO Engineering
27. Dornan
28. Edarat Group
29. EMCOR Group
30. EYP MCF
31. Gensler
32. Fluor Corporation
33. Gilbane Building Company
34. HDR
35. HITT Contracting
36. Hoffman Construction
37. ISG
38. JE Dunn Construction
39. Kirby Group Engineering
40. kW Engineering
41. kW Mission Critical Engineering
42. Laing O'Rourke
43. Linesight
44. M+W Group (Exyte)
45. McLaren Construction Group
46. Morrison Hershfield
47. Mortenson
48. PM Group
49. Quark
50. Rosendin
51. Royal HaskoningDHV
52. Salute Mission Critical
53. Sheehan Nagle Hartray Architects
54. Skanska
55. Southland Industries
56. Sturgeon Electric Company
57. Structure Tone
58. Sweco
59. The Mulhern Group
60. The Walsh Group
61. The Weitz Company
62. TRINITY Group Construction

Data Center Operators

1. 21Vianet Group (VNET)
2. Amazon Web Services (AWS)
3. Apple
4. China Telecom
5. Colt Data Centre Services (Colt DCS)
6. Compass Datacenters
7. CyrusOne
8. Digital Realty
9. EdgeConneX (EQT Infrastructure)
10. Equinix
11. GDS Services
12. Global Switch
13. Google
14. Iron Mountain
15. Meta (Facebook)
16. Microsoft
17. NTT Global Data Centers
18. QTS Realty Trust
19. STACK Infrastructure
20. ST Telemedia Global Data Centres
21. Vantage Data Centers
22. 3data
23. Africa Data Centres
24. AirTrunk
25. Aligned
26. American Tower
27. AQ Compute
28. Aruba
29. AtlasEdge
30. atNorth
31. AT TOKYO
32. BDx (Big Data Exchange)
33. Bulk Infrastructure
34. Bridge Data Centres
35. CDC Data Centres
36. Chayora
37. China Mobile
38. Chindata
39. CloudHQ
40. Cologix
41. COPT Data Center Solutions
42. CtrlS Datacenters
43. Cyxtera Technologies
44. Data4
45. DataBank
46. DC BLOX
47. Element Critical
48. ePLDT
49. eStruxture Data Centers
50. fifteenfortyseven Critical Systems Realty (1547
51. Flexential
52. Green Mountain
53. H5 Data Centers
54. HostDime
55. KDDI (Telehouse)
56. Keppel Data Centres
57. LG Uplus
58. maincubes one
59. MainOne (Equinix)
60. Milicom (Tigo)
61. NEXTDC
62. ODATA
63. Orange Business Services
64. Prime Data Centers
65. Princeton Digital Group (PDG)
66. Proximity Data Centres
67. Raxio Group
68. Rostelecom Data Centers
69. Sabey Data Centers
70. Scala Data Centers
71. Sify Technologies
72. Skybox Datacenters
73. Stream Data Centers
74. SUNeVision (iAdvantage)
75. Switch
76. T5 Data Centers
77. Tenglong Holdings Group
78. Teraco (Digital Realty)
79. TierPoint
80. Turkcell
81. Urbacon Data Centre Solutions
82. Wingu
83. Yondr
84. Yotta Infrastructure (Hiranandani Group)

New Entrants

1. AdaniConneX
2. AUBix
3. Cloudoon
4. ClusterPower
5. Corscale Data Centers
6. Damac Data Centres (EDGNEX)
7. Data Center First
8. DHAmericas
9. Edge Centres
10. Evolution Data Centres
11. Global Technical Realty
12. Hickory
13. iMCritical
14. Infinity
15. Kasi Cloud
16. MettaDC
17. Open Access Data Centres (OADC)
18. PowerHouse Data Centers
19. Pure Data Centres Group
20. Quantum Loophole
21. Quantum Switch Tamasuk (QST)
22. Stratus DC Management
23. YCO Cloud
24. YTL Data Center
25. ZeroPoint DC

GEOGRAPHICAL ANALYSIS

Americas Region

- The data center construction market in the Americas is developed, with an increasing presence of local and global data center operators, especially in the US, Canada, Brazil, Mexico, Chile, and Colombia. In 2022, Argentina and Peru were some other emerging markets.

Latin America

- Brazil is the leading data center industry in Latin America, with more than 45% of investments in the region due to the growth in internet penetration and adoption of cloud-based services by businesses in the country.

European Region

- Europe's data center construction market is one of the major and has several global and local data center operators. The Global Data Protection Regulation (GDPR), which came into effect in May 2018, positively impacted the data center industry in Europe, driving customers to shift data to cloud-based services for data localization.

Middle East & Africa (MEA) Region

- The growth in internet penetration, social media usage, and smart city initiatives drive the Middle East & Africa data center market. Telecommunication providers, enterprises, governments, cloud, and colocation service providers are major investors in developing facilities.

APAC Region

- APAC is one of the most dynamic global data center markets, with increased investments from colocation providers and hyperscale operators. The growth in the number of internet users, increased use of social media, elevated smartphone penetration, increased adoption of cloud services, and the need for enterprises to migrate from server room environments to data centers are the major drivers of the data center market APAC.

Segmentation by Geography

- North America
o The U.S.
o Canada
- Latin America
o Brazil
o Mexico
o Chile
o Colombia
o Rest of Latin America
- Western Europe
o The U.K.
o Germany
o France
o Netherlands
o Ireland
o Italy
o Spain
o Switzerland
o Belgium
o Portugal
o Other Western European Countries
- Nordics
o Denmark
o Sweden
o Norway
o Finland & Iceland
- Central & Eastern Europe
o Russia
o Poland
o Austria
o Czech Republic
o Other CEE Countries
- Middle East
o UAE
o Saudi Arabia
o Israel
o Oman
o Kuwait
o Qatar
o Bahrain
o Jordan
o Other Middle East Countries
- Africa
o South Africa
o Kenya
o Nigeria
o Egypt
o Ethiopia
o Other African Countries
- APAC
o China
o Hong Kong
o Australia
o New Zealand
o India
o Japan
o South Korea
o Taiwan
o Rest of APAC
- Southeast Asia
o Singapore
o Indonesia
o Malaysia
o Thailand
o Philippines
o Vietnam
o Other Southeast Asia Countries

KEY QUESTIONS ANSWERED:

1. How big is the data center construction market?
2. What is the growth rate of the data center construction market?
3. What is the estimated market size in terms of area in the global data center construction market by 2028?
4. What are the key trends in the data center construction industry?
5. How many MW of power capacity is expected to reach the global data center construction market by 2028?

1. ABOUT ARIZTON
2. ABOUT OUR DATA CENTER CAPABILITIES
3. WHAT'S INCLUDED
4. SEGMENTS INCLUDED
5. RESEARCH METHODOLOGY
6. MARKET AT GLANCE
7. PREMIUM INSIGHTS

8. INVESTMENT OPPORTUNITIES

8.1. INVESTMENT: MARKET SIZE & FORECAST
8.2. AREA: MARKET SIZE & FORECAST
8.3. POWER CAPACITY: MARKET SIZE & FORECAST
9. MARKET DYNAMICS
9.1. MARKET OPPORTUNITIES & TRENDS
9.2. MARKET GROWTH ENABLERS
9.3. MARKET RESTRAINTS
10. SITE SELECTION CRITERIA
10.1. FACILITY TYPE SEGMENTATION
10.2. HYPERSCALE DATA CENTERS
10.3. COLOCATION DATA CENTERS
10.4. ENTERPRISE DATA CENTERS
11. INFRASTRUCTURE SEGMENTATION
11.1. ELECTRICAL INFRASTRUCTURE
11.2. MECHANICAL INFRASTRUCTURE
11.3. COOLING SYSTEMS
11.4. COOLING TECHNIQUES
11.5. GENERAL CONSTRUCTION
12. TIER STANDARDS SEGMENTATION
13. GEOGRAPHY SEGMENTATION
14. NORTH AMERICA
14.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
14.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
14.3. DATA CENTER CONSTRUCTION MARKET BY AREA
14.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
14.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
14.6. US
14.6.1. KEY INVESTORS & INVESTMENTS
14.6.2. MARKET BY INVESTMENT
14.6.3. KEY AREA OF DEVELOPMENT AND FTZS
14.6.4. MARKET BY AREA
14.6.5. POWER CAPACITY & RENEWABLE ENERGY ADOPTION
14.6.6. MARKET BY POWER CAPACITY
14.6.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
14.6.8. MARKET BY INFRASTRUCTURE
14.7. CANADA
14.7.1. KEY HIGHLIGHTS & INVESTMENTS
14.7.2. MARKET BY INVESTMENT
14.7.3. KEY HIGHLIGHTS & LAND PRICING
14.7.4. MARKET BY AREA
14.7.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
14.7.6. MARKET BY POWER CAPACITY
14.7.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
14.7.8. MARKET BY INFRASTRUCTURE
15. LATIN AMERICA
15.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
15.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
15.3. DATA CENTER CONSTRUCTION MARKET BY AREA
15.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
15.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
16. BRAZIL
16.1. KEY INVESTORS & INVESTMENTS
16.2. MARKET BY INVESTMENT
16.3. KEY SEZS, DEVELOPMENTS AND LAND PRICING
16.4. MARKET BY AREA
16.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
16.6. MARKET BY POWER CAPACITY
16.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
16.8. MARKET BY INFRASTRUCTURE
17. MEXICO
17.1. KEY HIGHLIGHTS & INVESTMENTS
17.2. MARKET BY INVESTMENT
17.3. KEY DEVELOPMENT AND LAND PRICING
17.4. MARKET BY AREA
17.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
17.6. MARKET BY POWER CAPACITY
17.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
17.8. MARKET BY INFRASTRUCTURE
18. CHILE
18.1. KEY INVESTORS & INVESTMENTS
18.2. MARKET BY INVESTMENT
18.3. KEY DEVELOPMENT AND KEY SEZS
18.4. MARKET BY AREA
18.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
18.6. MARKET BY POWER CAPACITY
18.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
18.8. MARKET BY INFRASTRUCTURE

19. COLOMBIA
19.1. KEY INVESTORS & INVESTMENTS
19.2. MARKET BY INVESTMENT
19.3. KEY SEZS AND INVESTMENT COST
19.4. MARKET BY AREA
19.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
19.6. MARKET BY POWER CAPACITY
19.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
19.8. MARKET BY INFRASTRUCTURE
20. REST OF LATIN AMERICA
20.1. KEY INVESTORS & INVESTMENTS
20.2. MARKET BY INVESTMENT
20.3. KEY SEZS, LAND ACQUISITION & DEVELOPMENT
20.4. MARKET BY AREA
20.5. POWER CAPACITY ADDITION & RENEWABLE ENERGY ADOPTION
20.6. MARKET BY POWER CAPACITY
20.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
20.8. MARKET BY INFRASTRUCTURE
21. WESTERN EUROPE
21.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
21.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
21.3. DATA CENTER CONSTRUCTION MARKET BY AREA
21.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
21.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
22. UK
22.1. KEY INVESTORS & INVESTMENTS
22.2. MARKET BY INVESTMENT
22.3. KEY DEVELOPMENT, SEZS AND INVESTMENT COST
22.4. MARKET BY AREA
22.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
22.6. MARKET BY POWER CAPACITY
22.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
22.8. MARKET BY INFRASTRUCTURE
23. GERMANY
23.1. KEY INVESTORS & INVESTMENTS
23.2. MARKET BY INVESTMENT
23.3. KEY DEVELOPMENT, SEZS AND INVESTMENT COST
23.4. MARKET BY AREA
23.5. RENEWABLE ENERGY ADOPTION
23.6. MARKET BY POWER CAPACITY
23.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
23.8. MARKET BY INFRASTRUCTURE

24. FRANCE
24.1. KEY INVESTORS & INVESTMENTS
24.2. MARKET BY INVESTMENT
24.3. KEY AREA, LAND PRICING & INVESTMENT COST
24.4. MARKET BY AREA
24.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
24.6. MARKET BY POWER CAPACITY
24.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
24.8. MARKET BY INFRASTRUCTURE
25. NETHERLANDS
25.1. KEY INVESTORS & INVESTMENTS
25.2. MARKET BY INVESTMENT
25.3. KEY AREA DEVELOPMENT & LAND PRICING
25.4. MARKET BY AREA
25.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
25.6. MARKET BY POWER CAPACITY
25.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
25.8. MARKET BY INFRASTRUCTURE
26. IRELAND
26.1. KEY INVESTORS & INVESTMENTS
26.2. MARKET BY INVESTMENT
26.3. KEY SEZS, INVESTMENT COST & DEVELOPMENT
26.4. MARKET BY AREA
26.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
26.6. MARKET BY POWER CAPACITY
26.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
26.8. MARKET BY INFRASTRUCTURE
27. ITALY
27.1. KEY INVESTORS & INVESTMENTS
27.2. MARKET BY INVESTMENT
27.3. KEY SEZS & AREA DEVELOPMENT
27.4. MARKET BY AREA
27.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
27.6. MARKET BY POWER CAPACITY
27.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
27.8. MARKET BY INFRASTRUCTURE

28. SPAIN
28.1. KEY INVESTORS & INVESTMENTS
28.2. MARKET BY INVESTMENT
28.3. KEY SEZS, LAND DEVELOPMENT & INVESTMENT COST
28.4. MARKET BY AREA
28.5. POWER ADDITION & RENEWABLE ENERGY ADOPTION
28.6. MARKET BY POWER CAPACITY
28.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
28.8. MARKET BY INFRASTRUCTURE
29. SWITZERLAND
29.1. KEY INVESTORS & INVESTMENTS
29.2. MARKET BY INVESTMENT
29.3. KEY AREA DEVELOPMENT AND INVESTMENT COST
29.4. MARKET BY AREA
29.5. POWER ADDITION & RENEWABLE ENERGY ADOPTION
29.6. MARKET BY POWER CAPACITY
29.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
29.8. MARKET BY INFRASTRUCTURE
30. BELGIUM
30.1. KEY INVESTORS & INVESTMENTS
30.2. MARKET BY INVESTMENT
30.3. KEY AREA DEVELOPMENT & LAND PRICING
30.4. MARKET BY AREA
30.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
30.6. MARKET BY POWER CAPACITY
30.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
30.8. MARKET BY INFRASTRUCTURE
31. PORTUGAL
31.1. KEY INVESTORS & INVESTMENTS
31.2. MARKET BY INVESTMENT
31.3. KEY SEZS & AREA DEVELOPMENT
31.4. MARKET BY AREA
31.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
31.6. MARKET BY POWER CAPACITY
31.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
31.8. MARKET BY INFRASTRUCTURE

32. OTHER WESTERN EUROPEAN COUNTRIES
32.1. KEY INVESTORS & INVESTMENTS
32.2. MARKET BY INVESTMENT
32.3. KEY AREA DEVELOPMENT
32.4. MARKET BY AREA
32.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
32.6. MARKET BY POWER CAPACITY
32.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
32.8. MARKET BY INFRASTRUCTURE
33. NORDICS
33.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
33.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
33.3. DATA CENTER CONSTRUCTION MARKET BY AREA
33.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
33.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
34. DENMARK
34.1. KEY HIGHLIGHTS & INVESTMENTS
34.2. MARKET BY INVESTMENT
34.3. KEY LAND DEVELOPMENT & LAND PRICING
34.4. MARKET BY AREA
34.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
34.6. MARKET BY POWER CAPACITY
34.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
34.8. MARKET BY INFRASTRUCTURE
35. SWEDEN
35.1. KEY INVESTORS & INVESTMENTS
35.2. MARKET BY INVESTMENT
35.3. KEY HIGHLIGHTS & INVESTMENT COST
35.4. MARKET BY AREA
35.5. PPA & RENEWABLE ENERGY ADOPTION
35.6. MARKET BY POWER CAPACITY
35.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
35.8. MARKET BY INFRASTRUCTURE
36. NORWAY
36.1. KEY HIGHLIGHTS & INVESTMENTS
36.2. MARKET BY INVESTMENT
36.3. KEY HIGHLIGHTS
36.4. MARKET BY AREA
36.5. RENEWABLE ENERGY ADOPTION
36.6. MARKET BY POWER CAPACITY
36.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
36.8. MARKET BY INFRASTRUCTURE

37. FINLAND & ICELAND
37.1. KEY INVESTORS & INVESTMENTS
37.2. MARKET BY INVESTMENT
37.3. KEY AREA & DEVELOPMENT
37.4. MARKET BY AREA
37.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
37.6. MARKET BY POWER CAPACITY
37.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
37.8. MARKET BY INFRASTRUCTURE
38. CENTRAL & EASTERN EUROPE
38.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
38.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
38.3. DATA CENTER CONSTRUCTION MARKET BY AREA
38.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
38.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
39. RUSSIA
39.1. KEY INVESTORS & INVESTMENTS
39.2. MARKET BY INVESTMENT
39.3. KEY SEZS & LAND DEVELOPMENT
39.4. MARKET BY AREA
39.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
39.6. MARKET BY POWER CAPACITY
39.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
39.8. MARKET BY INFRASTRUCTURE
40. POLAND
40.1. KEY INVESTORS & INVESTMENTS
40.2. MARKET BY INVESTMENT
40.3. KEY SEZS & LAND DEVELOPMENT
40.4. MARKET BY AREA
40.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
40.6. MARKET BY POWER CAPACITY
40.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
40.8. MARKET BY INFRASTRUCTURE
41. AUSTRIA
41.1. KEY INVESTORS & INVESTMENTS
41.2. MARKET BY INVESTMENT
41.3. KEY SEZS & LAND DEVELOPMENT
41.4. MARKET BY AREA
41.5. RENEWABLE ENERGY ADOPTION
41.6. MARKET BY POWER CAPACITY
41.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
41.8. MARKET BY INFRASTRUCTURE

42. CZECH REPUBLIC
42.1. KEY INVESTORS & INVESTMENTS
42.2. MARKET BY INVESTMENT
42.3. KEY SEZS, LAND ACQUISITION & LAND PRICING
42.4. MARKET BY AREA
42.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
42.6. MARKET BY POWER CAPACITY
42.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
42.8. MARKET BY INFRASTRUCTURE
43. OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
43.1. KEY INVESTORS & INVESTMENTS
43.2. MARKET BY INVESTMENT
43.3. KEY AREA DEVELOPMENT
43.4. MARKET BY AREA
43.5. RENEWABLE ENERGY ADOPTION
43.6. MARKET BY POWER CAPACITY
43.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
43.8. MARKET BY INFRASTRUCTURE
44. MIDDLE EAST
44.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
44.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
44.3. DATA CENTER CONSTRUCTION MARKET BY AREA
44.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
44.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
45. UAE
45.1. KEY INVESTORS & INVESTMENTS
45.2. MARKET BY INVESTMENT
45.3. KEY SEZS, HIGHLIGHTS & LAND PRICING
45.4. MARKET BY AREA
45.5. RENEWABLE ENERGY ADOPTION
45.6. MARKET BY POWER CAPACITY
45.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
45.8. MARKET BY INFRASTRUCTURE
46. SAUDI ARABIA
46.1. KEY INVESTORS & INVESTMENTS
46.2. MARKET BY INVESTMENT
46.3. KEY SEZS & HIGHLIGHTS
46.4. MARKET BY AREA
46.5. RENEWABLE ENERGY ADOPTION
46.6. MARKET BY POWER CAPACITY
46.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
46.8. MARKET BY INFRASTRUCTURE
47. ISRAEL
47.1. KEY INVESTORS & INVESTMENTS
47.2. MARKET BY INVESTMENT
47.3. KEY HIGHLIGHTS
47.4. MARKET BY AREA
47.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
47.6. MARKET BY POWER CAPACITY
47.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
47.8. MARKET BY INFRASTRUCTURE
48. OMAN
48.1. KEY INVESTORS & INVESTMENTS
48.2. MARKET BY INVESTMENT
48.3. KEY SEZS & AREA DEVELOPMENT
48.4. MARKET BY AREA
48.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
48.6. MARKET BY POWER CAPACITY
48.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
48.8. MARKET BY INFRASTRUCTURE
49. KUWAIT
49.1. KEY INVESTORS & INVESTMENTS
49.2. MARKET BY INVESTMENT
49.3. KEY SEZS, DEVELOPMENT & HIGHLIGHTS
49.4. MARKET BY AREA
49.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
49.6. MARKET BY POWER CAPACITY
49.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
49.8. MARKET BY INFRASTRUCTURE
50. QATAR
50.1. KEY INVESTORS & INVESTMENTS
50.2. MARKET BY INVESTMENT
50.3. KEY SEZS, DEVELOPMENT & LAND PRICING
50.4. MARKET BY AREA
50.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
50.6. MARKET BY POWER CAPACITY
50.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
50.8. MARKET BY INFRASTRUCTURE
51. BAHRAIN
51.1. KEY INVESTORS & INVESTMENTS
51.2. MARKET BY INVESTMENT
51.3. KEY SEZS & LAND DEVELOPMENT
51.4. MARKET BY AREA
51.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
51.6. MARKET BY POWER CAPACITY
51.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
51.8. MARKET BY INFRASTRUCTURE
52. JORDAN
52.1. KEY INVESTORS & INVESTMENTS
52.2. MARKET BY INVESTMENT
52.3. KEY SEZS AND LAND DEVELOPMENT
52.4. MARKET BY AREA
52.5. RENEWABLE ENERGY ADOPTION
52.6. MARKET BY POWER CAPACITY
52.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
52.8. MARKET BY INFRASTRUCTURE
53. OTHER MIIDDLE EASTERN COUNTRIES
53.1. KEY INVESTORS & INVESTMENTS
53.2. MARKET BY INVESTMENT
53.3. KEY SEZS
53.4. MARKET BY AREA
53.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
53.6. MARKET BY POWER CAPACITY
53.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
53.8. MARKET BY INFRASTRUCTURE
54. AFRICA
54.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
54.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
54.3. DATA CENTER CONSTRUCTION MARKET BY AREA
54.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
54.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
55. SOUTH AFRICA
55.1. KEY INVESTORS & INVESTMENTS
55.2. MARKET BY INVESTMENT
55.3. KEY AREA, INVESTMENT COST & LAND PRICING
55.4. MARKET BY AREA
55.5. RENEWABLE ENERGY ADOPTION
55.6. MARKET BY POWER CAPACITY
55.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
55.8. MARKET BY INFRASTRUCTURE
56. KENYA
56.1. KEY INVESTORS & INVESTMENTS
56.2. MARKET BY INVESTMENT
56.3. KEY SEZS, INVESTMENT COST & LAND PRICING
56.4. MARKET BY AREA
56.5. RENEWABLE ENERGY ADOPTION
56.6. MARKET BY POWER CAPACITY
56.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
56.8. MARKET BY INFRASTRUCTURE
57. NIGERIA
57.1. KEY INVESTORS & INVESTMENTS
57.2. MARKET BY INVESTMENT
57.3. KEY SEZS & LAND ACQUISITION
57.4. MARKET BY AREA
57.5. RENEWABLE ENERGY ADOPTION
57.6. MARKET BY POWER CAPACITY
57.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
57.8. MARKET BY INFRASTRUCTURE
58. EGYPT
58.1. KEY INVESTORS & INVESTMENTS
58.2. MARKET BY INVESTMENT
58.3. KEY AREA, INVESTMENT COST & LAND PRICING
58.4. MARKET BY AREA
58.5. RENEWABLE ENERGY ADOPTION
58.6. MARKET BY POWER CAPACITY
58.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
58.8. MARKET BY INFRASTRUCTURE
59. ETHIOPIA
59.1. KEY INVESTORS & INVESTMENTS
59.2. MARKET BY INVESTMENT
59.3. KEY AREA & LAND ACQUISITION
59.4. MARKET BY AREA
59.5. RENEWABLE ENERGY ADOPTION
59.6. MARKET BY POWER CAPACITY
59.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
59.8. MARKET BY INFRASTRUCTURE

60. OTHER AFRICAN COUNTRIES
60.1. KEY INVESTORS & INVESTMENTS
60.2. MARKET BY INVESTMENT
60.3. KEY SEZS & LAND DEVELOPMENT
60.4. MARKET BY AREA
60.5. RENEWABLE ENERGY ADOPTION
60.6. MARKET BY POWER CAPACITY
60.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
60.8. MARKET BY INFRASTRUCTURE
61. APAC
61.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
61.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
61.3. DATA CENTER CONSTRUCTION MARKET BY AREA
61.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
61.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
62. CHINA
62.1. KEY INVESTORS & INVESTMENTS
62.2. MARKET BY INVESTMENT
62.3. KEY SEZS
62.4. MARKET BY AREA
62.5. RENEWABLE ENERGY ADOPTION
62.6. MARKET BY POWER CAPACITY
62.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
62.8. MARKET BY INFRASTRUCTURE
63. HONG KONG
63.1. KEY INVESTORS & INVESTMENTS
63.2. MARKET BY INVESTMENT
63.3. KEY HIGHLIGHTS & LAND PRICING
63.4. MARKET BY AREA
63.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
63.6. MARKET BY POWER CAPACITY
63.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
63.8. MARKET BY INFRASTRUCTURE
64. AUSTRALIA
64.1. KEY INVESTORS & INVESTMENTS
64.2. MARKET BY INVESTMENT
64.3. KEY AREA & LAND PRICING
64.4. MARKET BY AREA
64.5. RENEWABLE ENERGY ADOPTION
64.6. MARKET BY POWER CAPACITY
64.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
64.8. MARKET BY INFRASTRUCTURE

65. NEW ZEALAND
65.1. KEY INVESTORS & INVESTMENTS
65.2. MARKET BY INVESTMENT
65.3. KEY AREA & LAND PRICING
65.4. MARKET BY AREA
65.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
65.6. MARKET BY POWER CAPACITY
65.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
65.8. MARKET BY INFRASTRUCTURE
66. INDIA
66.1. KEY INVESTORS & INVESTMENTS
66.2. MARKET BY INVESTMENT
66.3. KEY HIGHLIGHTS & LAND ACQUISITIONS
66.4. MARKET BY AREA
66.5. RENEWABLE ENERGY ADOPTION
66.6. MARKET BY POWER CAPACITY
66.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
66.8. MARKET BY INFRASTRUCTURE
67. JAPAN
67.1. KEY INVESTORS & INVESTMENTS
67.2. MARKET BY INVESTMENT
67.3. KEY DEVELOPMENT, LAND ACQUISITION & INVESTMENT COST
67.4. MARKET BY AREA
67.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
67.6. MARKET BY POWER CAPACITY
67.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
67.8. MARKET BY INFRASTRUCTURE
68. SOUTH KOREA
68.1. KEY INVESTORS & INVESTMENTS
68.2. MARKET BY INVESTMENT
68.3. KEY AREA DEVELOPMENT, FEZS & LAND PRICING
68.4. MARKET BY AREA
68.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
68.6. MARKET BY POWER CAPACITY
68.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
68.8. MARKET BY INFRASTRUCTURE

69. TAIWAN
69.1. KEY INVESTORS & INVESTMENTS
69.2. MARKET BY INVESTMENT
69.3. KEY HIGHLIGHTS & INDUSTRIAL PARK
69.4. MARKET BY AREA
69.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
69.6. MARKET BY POWER CAPACITY
69.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
69.8. MARKET BY INFRASTRUCTURE
70. REST OF APAC
70.1. KEY INVESTORS & INVESTMENTS
70.2. MARKET BY INVESTMENT
70.3. KEY HIGHLIGHTS & DEVELOPMENT
70.4. MARKET BY AREA
70.5. RENEWABLE ENERGY ADOPTION
70.6. MARKET BY POWER CAPACITY
70.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
70.8. MARKET BY INFRASTRUCTURE
71. SOUTHEAST ASIA
71.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
71.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
71.3. DATA CENTER CONSTRUCTION MARKET BY AREA
71.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
71.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
72. SINGAPORE
72.1. KEY INVESTORS & INVESTMENTS
72.2. MARKET BY INVESTMENT
72.3. KEY FTZS & LAND PRICING
72.4. MARKET BY AREA
72.5. RENEWABLE ENERGY ADOPTION
72.6. MARKET BY POWER CAPACITY
72.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
72.8. MARKET BY INFRASTRUCTURE
73. INDONESIA
73.1. KEY INVESTORS & INVESTMENTS
73.2. MARKET BY INVESTMENT
73.3. KEY FTZS & INVESTMENT COST
73.4. MARKET BY AREA
73.5. RENEWABLE ENERGY ADOPTION
73.6. MARKET BY POWER CAPACITY
73.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
73.8. MARKET BY INFRASTRUCTURE
74. MALAYSIA
74.1. KEY INVESTORS & INVESTMENTS
74.2. MARKET BY INVESTMENT
74.3. KEY FTZS, AREA DEVELOPMENT & LAND PRICING
74.4. MARKET BY AREA
74.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
74.6. MARKET BY POWER CAPACITY
74.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
74.8. MARKET BY INFRASTRUCTURE
75. THAILAND
75.1. KEY INVESTORS & INVESTMENTS
75.2. MARKET BY INVESTMENT
75.3. KEY LAND PRICING & AREA DEVELOPMENT
75.4. MARKET BY AREA
75.5. POWER PRICING & POWER ADDITION
75.6. MARKET BY POWER CAPACITY
75.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
75.8. MARKET BY INFRASTRUCTURE
76. PHILIPPINES
76.1. KEY INVESTORS & INVESTMENTS
76.2. MARKET BY INVESTMENT
76.3. KEY FTZS & HIGHLIGHTS
76.4. MARKET BY AREA
76.5. POWER PRICING & RENEWABLE ENERGY ADOPTION
76.6. MARKET BY POWER CAPACITY
76.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
76.8. MARKET BY INFRASTRUCTURE
77. VIETNAM
77.1. KEY INVESTORS & INVESTMENTS
77.2. MARKET BY INVESTMENT
77.3. KEY FTZS & LAND PRICING
77.4. MARKET BY AREA
77.5. RENEWABLE ENERGY ADOPTION
77.6. MARKET BY POWER CAPACITY
77.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
77.8. MARKET BY INFRASTRUCTURE
78. REST OF SOUTHEAST ASIA
78.1. KEY INVESTORS & INVESTMENTS
78.2. MARKET BY INVESTMENT
78.3. KEY AREA DEVELOPMENT
78.4. MARKET BY AREA
78.5. RENEWABLE ENERGY ADOPTION
78.6. MARKET BY POWER CAPACITY
78.7. KEY SUPPORT INFRASTRUCTURE ADOPTION
78.8. MARKET BY INFRASTRUCTURE
79. MARKET PARTICIPANTS
79.1. SUPPORT INFRASTRUCTURE PROVIDERS
79.2. DATA CENTER CONTRACTORS & SUBCONTRACTORS
79.3. DATA CENTER INVESTORS
79.4. NEW ENTRANTS
80. QUANTITATIVE SUMMARY
81. APPENDIX
81.1. ABBREVIATIONS
81.2. DEFINITIONS
81.3. SEGMENTAL COVERAGE

NA

NA

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE