Western Europe Data Center Construction Market - Industry Outlook & Forecast 2023-2028
Market Report I 2023-04-20 I 467 Pages I Arizton Advisory & Intelligence
The Western Europe data center construction market is expected to grow at a CAGR of 4.33% during 2022 to 2028
KEY HIGHLIGHTS
- There is a high demand from organizations for retail colocation services in developing countries. Enterprises having limited budgets and demanding geographical distribution capacities will drive the demand for retail colocation services. There is an increasing demand for computing power from cloud providers, enterprises, IoT, and Big Data organizations, which will drive wholesale colocation demand.
- Germany leads the Western Europe data center market with an overall investment of over USD 1.8 billion in 2022. The country's cumulative growth is expected to be more than USD 12 billion during the forecast period.
- The growth in data center development has led the contractors to implement new sustainable methods, increasing the competition among them. Operators opt for these contractors to enhance their green credentials.
- There is significant growth in greenfield and modular data center developments. The modular data center developments are increased as the construction methods are seemed inefficient due to labor shortages, budget constraints, and construction delays in certain countries across the region. The increased demand for modular solutions from data center operators is increasing the revenue of modular data center solutions providers such as Vertiv, Dell, and HPE, among others.
- The power capacity is expected to grow significantly in the region with the advent of colocation and hyperscale operators investing highly in the market. There is a trend of procuring energy harnessed from renewable power sources by colocation, hyperscale, and colocation service providers.
KEY TRENDS & DRIVERS
Growing Adoption of Artificial Intelligence
The adoption of artificial intelligence is fueling data generation and the technology market, thereby increasing the need for data center construction. Eurostat released a report according to which Ireland ranks at the top in Europe in using AI/ML technologies by businesses and enterprises in their infrastructure or applications.
Several AI initiatives in countries across the region include global partnerships on artificial intelligence, a mission on artificial intelligence, a national strategy on artificial intelligence, and others. For instance, The Government of France invested around USD 1.7 billion in its National Strategy for Artificial Intelligence. The high adoption of AI/ML solutions is prompting the installation of a highly efficient cooling infrastructure. Liquid cooling is the prominent technology for supporting AI/ML workloads in High-Performance Computing (HPC). Direct-to-chip and liquid-immersion cooling markets, through OEM, are making strong bonds. Research & Development centers are being set up for innovations in AI and other applications across various Western European countries. For instance, R&D centers for AI have been set up by companies such as Google, Oracle, and Huawei.
Increase in Sustainable Initiatives
- Data centers, the major sources of carbon emissions worldwide, are looking for sustainable initiatives to reduce the high quantity of CO2 emissions generated by the facilities. According to the Europe Climate act, a part of the European Green Deal, countries across the continent are aiming to achieve net zero carbon emissions by the year 2050.
- Various operators in Western Europe are a part of the Climate Neutral Data Center Pact act, such as Interxion (Digital Realty), Aruba, OVHcloud, Equinix, and Scaleway data center, among 17 industry associations. The pact states that the facilities part of it must be powered completely using energy harnessed from renewable energy sources such as wind, hydro, solar, and others by 2030. The Government of the UK aims to achieve 100% renewable energy in its energy mix by 2035.
Rising Colocation Data Center Investments
- The Western Europe data center construction market has shown signs of growth with the development of hyperscale data centers by cloud service providers such as Microsoft, IBM, Amazon Web Services (AWS), Oracle, Google, and Tencent. The prominent investors in the Western Europe data center construction include Equinix, Interxion (Digital Realty), NTT Global Centers, Echelon Data Centres, Iron Mountain, OVHcloud, Vantage Data Centers, and VIRTUS Data Centres.
- In August 2022, Proximity Data Centres opened a data center in Buckinghamshire. A loan of USD 30.8 million was granted to the operator for its UK expansion, with a total investment of USD 99 million. OVHcloud, a cloud computing, has planned to invest around USD 101 million by 2027 for its upcoming data center in Limburg. Telehouse has planned an investment of around USD 988 million for its European expansion. Telehouse plans an investment of around USD 988 million for its expansion in countries across Western Europe and other regions in Europe. An increase in data center investment will provide huge revenue opportunities for construction contractors and colocation and infrastructure providers worth billions of dollars.
Support of The Government For Data Centers
- One of the prominent enablers for the Western Europe data center construction market is breaks and tax incentives offered in various countries, which generate significant savings and incorporate other benefits.
- The Government of Spain is investing highly in the country's overall digitalization. The government has planned around USD 720 million to strengthen Artificial Intelligence in the country.
- The Government of France reduced the electricity taxes and will help attract investments in the country.
- The UK government has placed a corporate tax of 20%, the lowest amongst G20 countries.
- The Federal Act on Data Protection (FADP) in Switzerland includes a few GDPR adaptations, which will aid in attracting further investments for data centers in the country.
- The French Government offers tax incentives for Research & Development up to 30% and has a limit of USD 97.48 million.
- The Dutch government is undertaking initiatives to bring the country to the forefront of the Western Europe data center construction market. The sales and VAT rate in the country is over 20%.
- The Government of the Netherlands is taking initiatives to increase the country's data center market portfolio and reach. The VAT and sales tax in the country stands above 20%.
- Tax incentives are available in most Western European countries. More tax breaks will be concentrated on less developed countries to attract investment in the Western Europe data center construction market.
SEGMENTAL ANALYSIS
- Significant investment growth due to the advent of technologies such as cloud computing, Big data & IoT, and M/L Technologies.
- Increasing growth in the construction of modular data centers is being observed.
- Operators are adopting the turnkey approach for designing new data center facilities.
- Greenfield projects will encounter more growth as compared to brownfield.
- The brownfield development of data centers will continue to grow along with installing on-site renewable power sources.
Facility
- Colocation Data Center
- Hyperscale Data Center
- Enterprise Data Center
Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgear
- PDUs
- Other Electrical Infrastructure
Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
Cooling Systems
- CRAC and CRAH Units
- Chillers Units
- Cooling Towers, Condensers, and Dry Coolers
- Economizers & Evaporative Coolers
- Other Cooling Units
Cooling Techniques
- Air-based Cooling
- Liquid-based Cooling
General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Fire Detection & Suppression
- Physical Security
- DCIM/BMS Solutions
Tier Standard
- Tier I & Tier II
- Tier III
- Tier IV
Geography
- UK
- Germany
- France
- Netherlands
- Ireland
- Switzerland
- Italy
- Spain
- Belgium
- Portugal
- Luxembourg
- Other Western European Countries
COMPETITIVE ANALYSIS
- Some of the major vendors operating in the Western Europe data center construction market include Arup, AECOM, Ariatta, Bouygues, ICT facilities, Mercury, Metnor Group, Oakmont Construction, ARC:MC, Kirby Group Engineering, DPR Construction, Turner & Townsend, Gruner, Lupp Group, Max Bogl, Exyte, DBA PRO, Future-tech, ISG, and NORMA.
Prominent Support Infrastructure Providers
- 3M
- ABB
- Airedale International Air Conditioning
- Alfa Laval
- Carrier
- Caterpillar
- Condair
- Climaveneta
- Cummins
- D'HONDT THERMAL SOLUTIONS
- Daikin Applied
- Delta Electronics
- Eaton
- ebm-papst
- EMICON INNOVATION AND COMFORT
- Enrogen
- FlaktGroup
- Grundfos
- Guntner
- GESAB
- HiRef
- HITEC Power Protection
- Honeywell International
- Johnson Controls
- KOHLER-SDMO
- KyotoCooling
- Legrand
- Mitsubishi Electric
- Munters
- Nlyte Software (Carrier Global Corporation)
- Perkins Engines
- Piller Power Systems
- Riello Elettronica ( Riello UPS)
- Rittal
- Rolls-Royce
- Schneider Electric
- Siemens
- Socomec
- STULZ
- Trane (Ingersoll Rand)
- Vertiv
- ZIEHL-ABEGG
Prominent Construction Contractors
- AECOM
- AEON Engineering
- ARC:MC
- APL Data Center
- Ariatta
- ARSMAGNA
- Artelia
- Arup
- Atkins
- Basler & Hofmann
- BENTHEM CROUWEL ARCHITECTS
- Bouygues Construction
- Callaghan Engineering
- Cap Ingelec
- Collen
- Deerns
- DPR Construction
- Eiffage
- EYP MCF
- Ferrovial
- Future-tech
- ICT Facilities
- IDOM
- ISG
- JCA Engineering
- JERLAURE
- Kirby Group Engineering
- Linesight
- LPI Group
- M+W Group (EXYTE)
- Mercury
- Metnor Construction
- Nicholas Webb Architects (NWA)
- NORMA Engineering
- Oakmont Construction
- PM Group
- (PQC) Power Quality Control
- Quark
- RED
- Reid Brewin Architects
- Royal HaskoningDHV
- Skanska
- SPIE UK
- Starching
- STO Building Group
- STS Group
- TPF
- TTSP
- Turner & Townsend
- Winthrop Engineering and Contracting
Prominent Data Center Investors
- AtlasEdge
- Aruba
- China Mobile
- Colt Data Centre Services (COLT DCS)
- CyrusOne
- DATA4
- Digital Realty
- Echelon Data Centres
- EdgeConneX (EQT Infrastructure)
- Equinix
- Euclyde Data Centers
- Facebook
- Global Switch
- Google
- Iron Mountain
- KDDI
- Liberty Global
- Microsoft
- Nautilus Data Technologies
- NDC-GARBE Data Centers Europe
- NTT Global Data Centers
- Orange Business Services
- Proximity Data Centres
- Pure Data Centres
- T5 Data Centers
- Telecom Italia Sparkle
- Vantage Data Centers
- Virtus Data centers (ST Telemedia Global Data Centres)
- Yondr
New Entrants
- Global Technical Realty
- Stratus DC Management
KEY QUESTIONS ANSWERED
1. How big is the Western Europe data center construction market?
2. What is the growth rate of the Western Europe data center construction market?
3. What factors drive the Western Europe data center construction market growth?
4. What is the estimated market size in terms of area in the Western Europe data center construction market by 2028?
5. Who are the new entrants in the Western Europe data center construction market?
6. How many MW of power capacity is expected to reach the Western Europe data center construction market by 2028?
1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 SCOPE & COVERAGE
4.1 MARKET DEFINITION
4.2 BASE YEAR
4.3 SCOPE OF THE STUDY
4.3.1 MARKET SEGMENTATION BY FACILITY TYPE
4.3.2 MARKET SEGMENTATION BY INFRASTRUCTURE
4.3.3 MARKET SEGMENTATION BY ELECTRICAL INFRASTRUCTURE
4.3.4 MARKET SEGMENTATION BY MECHANICAL INFRASTRUCTURE
4.3.5 MARKET SEGMENTATION BY COOLING SYSTEM
4.3.6 MARKET SEGMENTATION BY COOLING TECHNIQUES
4.3.7 MARKET SEGMENTATION BY GENERAL CONSTRUCTION
4.3.8 MARKET SEGMENTATION BY TIER STANDARDS
4.3.9 MARKET SEGMENTATION BY GEOGRAPHY
5 REPORT ASSUMPTIONS & CAVEATS
5.1 KEY CAVEATS
5.2 CURRENCY CONVERSION
5.3 MARKET DERIVATION
6 PREMIUM INSIGHTS
6.1 KEY MARKET HIGHLIGHTS
6.2 KEY TRENDS IN THE WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET
7 MARKET AT A GLANCE
8 INTRODUCTION
8.1 MARKET OVERVIEW
8.2 DATA CENTER DESIGN CERTIFICATIONS
8.2.1 UPTIME INSTITUTE TIER STANDARDS
8.2.2 LEED CERTIFICATION
8.2.3 TIA 942 CERTIFICATION
9 MARKET OPPORTUNITIES & TRENDS
9.1 HIGHER ADOPTION OF ARTIFICIAL INTELLIGENCE
9.2 INCREASING ADOPTION OF DISTRICT HEATING SYSTEMS
9.3 DATA CENTERS PRIORITIZING SUSTAINABILITY
9.4 INNOVATIONS IN DATA CENTER TECHNOLOGIES
10 MARKET GROWTH ENABLERS
10.1 INCREASING 5G DEPLOYMENTS FUELING EDGE DATA CENTERS
10.2 GROWTH IN THE ADOPTION OF CLOUD SERVICES
10.3 INCREASING ADOPTION OF BIG DATA & IOT
10.4 SUPPORT FROM THE GOVERNMENT
10.5 MODULAR DATA CENTER CONSTRUCTION
10.6 GROWING SUBMARINE & INLAND CONNECTIVITY
10.7 ADOPTION OF OCP & HYPERSCALE INFRASTRUCTURE
11 MARKET RESTRAINTS
11.1 SECURITY CHALLENGES IN DATA CENTERS
11.2 CARBON EMISSIONS AFFECTING DATA CENTER SUSTAINABILITY
11.3 LOCATION CONSTRAINTS ON DATA CENTER DEVELOPMENT
11.4 LACK OF SKILLED DATA CENTER PROFESSIONALS
12 MARKET LANDSCAPE
12.1 MARKET OVERVIEW
12.2 MARKET SIZE & FORECAST
12.3 AREA: MARKET SIZE & FORECAST
12.4 POWER CAPACITY: MARKET SIZE & FORECAST
12.5 FIVE FORCES ANALYSIS
12.5.1 THREAT OF NEW ENTRANTS
12.5.2 BARGAINING POWER OF SUPPLIERS
12.5.3 BARGAINING POWER OF BUYERS
12.5.4 THREAT OF SUBSTITUTES
12.5.5 COMPETITIVE RIVALRY
13 FACILITY TYPE
13.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
13.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
13.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
13.4 COLOCATION DATA CENTERS
13.4.1 MARKET OVERVIEW
13.4.2 INVESTMENT: MARKET SIZE & FORECAST
13.4.3 AREA: MARKET SIZE & FORECAST
13.4.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.5 HYPERSCALE DATA CENTERS
13.5.1 MARKET OVERVIEW
13.5.2 INVESTMENT: MARKET SIZE & FORECAST
13.5.3 AREA: MARKET SIZE & FORECAST
13.5.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.6 ENTERPRISE DATA CENTERS
13.6.1 MARKET OVERVIEW
13.6.2 INVESTMENT: MARKET SIZE & FORECAST
13.6.3 AREA: MARKET SIZE & FORECAST
13.6.4 POWER CAPACITY: MARKET SIZE & FORECAST
14 INFRASTRUCTURE
14.1 MARKET SNAPSHOT & GROWTH ENGINE
14.2 ELECTRICAL INFRASTRUCTURE
14.2.1 MARKET OVERVIEW
14.2.2 MARKET SIZE & FORECAST
14.3 MECHANICAL INFRASTRUCTURE
14.3.1 MARKET OVERVIEW
14.3.2 MARKET SIZE & FORECAST
14.4 GENERAL CONSTRUCTION
14.4.1 MARKET OVERVIEW
14.4.2 MARKET SIZE & FORECAST
15 ELECTRICAL INFRASTRUCTURE
15.1 MARKET SNAPSHOT & GROWTH ENGINE
15.2 UPS SYSTEMS
15.2.1 MARKET OVERVIEW
15.2.2 MARKET SIZE & FORECAST
15.3 GENERATORS
15.3.1 MARKET OVERVIEW
15.3.2 MARKET SIZE & FORECAST
15.4 TRANSFER SWITCHES & SWITCHGEAR
15.4.1 MARKET OVERVIEW
15.4.2 MARKET SIZE & FORECAST
15.5 PDUS
15.5.1 MARKET OVERVIEW
15.5.2 MARKET SIZE & FORECAST
15.6 OTHER ELECTRICAL INFRASTRUCTURE
15.6.1 MARKET OVERVIEW
15.6.2 MARKET SIZE & FORECAST
16 MECHANICAL INFRASTRUCTURE
16.1 MARKET SNAPSHOT & GROWTH ENGINE
16.2 COOLING SYSTEMS
16.2.1 MARKET OVERVIEW
16.2.2 MARKET SIZE & FORECAST
16.3 RACKS
16.3.1 MARKET OVERVIEW
16.3.2 MARKET SIZE & FORECAST
16.4 OTHER MECHANICAL INFRASTRUCTURE
16.4.1 MARKET OVERVIEW
16.4.2 MARKET SIZE & FORECAST
17 COOLING SYSTEMS
17.1 MARKET SNAPSHOT & GROWTH ENGINE
17.2 CRAC & CRAH UNITS
17.2.1 MARKET OVERVIEW
17.2.2 MARKET SIZE & FORECAST
17.3 CHILLER UNITS
17.3.1 MARKET OVERVIEW
17.3.2 MARKET SIZE & FORECAST
17.4 COOLING TOWERS, CONDENSERS & DRY COOLERS
17.4.1 MARKET OVERVIEW
17.4.2 MARKET SIZE & FORECAST
17.5 ECONOMIZERS & EVAPORATIVE COOLERS
17.5.1 MARKET OVERVIEW
17.5.2 MARKET SIZE & FORECAST
17.6 OTHER COOLING UNITS
17.6.1 MARKET OVERVIEW
17.6.2 MARKET SIZE & FORECAST
18 COOLING TECHNIQUE
18.1 MARKET SNAPSHOT & GROWTH ENGINE
18.2 AIR-BASED COOLING
18.2.1 MARKET OVERVIEW
18.2.2 MARKET SIZE & FORECAST
18.3 LIQUID-BASED COOLING
18.3.1 MARKET OVERVIEW
18.3.2 MARKET SIZE & FORECAST
19 GENERAL CONSTRUCTION
19.1 MARKET SNAPSHOT & GROWTH ENGINE
19.2 CORE & SHELL DEVELOPMENT
19.2.1 MARKET OVERVIEW
19.2.2 MARKET SIZE & FORECAST
19.3 INSTALLATION & COMMISSIONING SERVICES
19.3.1 MARKET OVERVIEW
19.3.2 MARKET SIZE & FORECAST
19.4 ENGINEERING & BUILDING DESIGN
19.4.1 MARKET OVERVIEW
19.4.2 MARKET SIZE & FORECAST
19.5 FIRE DETECTION & SUPPRESSION
19.5.1 MARKET OVERVIEW
19.5.2 MARKET SIZE & FORECAST
19.6 PHYSICAL SECURITY
19.6.1 MARKET OVERVIEW
19.6.2 MARKET SIZE & FORECAST
19.7 DCIM/BMS SOLUTIONS
19.7.1 MARKET OVERVIEW
19.7.2 MARKET SIZE & FORECAST
20 TIER STANDARDS
20.1 MARKET SNAPSHOT & GROWTH ENGINE
20.2 OVERVIEW OF TIER STANDARDS
20.3 TIER I & II
20.3.1 MARKET OVERVIEW
20.3.2 MARKET SIZE & FORECAST
20.4 TIER III
20.4.1 MARKET OVERVIEW
20.4.2 MARKET SIZE & FORECAST
20.5 TIER IV
20.5.1 MARKET OVERVIEW
20.5.2 MARKET SIZE & FORECAST
21 GEOGRAPHY
21.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
21.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
21.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
22 UK
22.1 MARKET SNAPSHOT & GROWTH ENGINE
22.1.1 MARKET OVERVIEW
22.2 INVESTMENT: MARKET SIZE & FORECAST
22.3 AREA: MARKET SIZE & FORECAST
22.3.1 POWER CAPACITY: MARKET SIZE & FORECAST
22.4 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
23 GERMANY
23.1 MARKET SNAPSHOT & GROWTH ENGINE
23.1.1 MARKET OVERVIEW
23.2 INVESTMENT: MARKET SIZE & FORECAST
23.3 AREA: MARKET SIZE & FORECAST
23.4 POWER CAPACITY: MARKET SIZE & FORECAST
23.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24 FRANCE
24.1 MARKET SNAPSHOT & GROWTH ENGINE
24.1.1 MARKET OVERVIEW
24.2 INVESTMENT: MARKET SIZE & FORECAST
24.3 AREA: MARKET SIZE & FORECAST
24.4 POWER CAPACITY: MARKET SIZE & FORECAST
24.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
25 NETHERLANDS
25.1 MARKET SNAPSHOT & GROWTH ENGINE
25.1.1 MARKET OVERVIEW
25.2 INVESTMENT: MARKET SIZE & FORECAST
25.3 AREA: MARKET SIZE & FORECAST
25.3.1 POWER CAPACITY: MARKET SIZE & FORECAST
25.4 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26 IRELAND
26.1 MARKET SNAPSHOT & GROWTH ENGINE
26.1.1 MARKET OVERVIEW
26.2 INVESTMENT: MARKET SIZE & FORECAST
26.3 AREA: MARKET SIZE & FORECAST
26.4 POWER CAPACITY: MARKET SIZE & FORECAST
26.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27 SWITZERLAND
27.1 MARKET SNAPSHOT & GROWTH ENGINE
27.1.1 MARKET OVERVIEW
27.2 INVESTMENT: MARKET SIZE & FORECAST
27.3 AREA: MARKET SIZE & FORECAST
27.4 POWER CAPACITY: MARKET SIZE & FORECAST
27.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28 ITALY
28.1 MARKET SNAPSHOT & GROWTH ENGINE
28.1.1 MARKET OVERVIEW
28.2 INVESTMENT: MARKET SIZE & FORECAST
28.3 AREA: MARKET SIZE & FORECAST
28.4 POWER CAPACITY: MARKET SIZE & FORECAST
28.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29 SPAIN
29.1 MARKET SNAPSHOT & GROWTH ENGINE
29.1.1 MARKET OVERVIEW
29.2 INVESTMENT: MARKET SIZE & FORECAST
29.3 AREA: MARKET SIZE & FORECAST
29.3.1 POWER CAPACITY: MARKET SIZE & FORECAST
29.4 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30 BELGIUM
30.1 MARKET SNAPSHOT & GROWTH ENGINE
30.1.1 MARKET OVERVIEW
30.2 INVESTMENT: MARKET SIZE & FORECAST
30.3 AREA: MARKET SIZE & FORECAST
30.4 POWER CAPACITY: MARKET SIZE & FORECAST
30.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
31 PORTUGAL
31.1 MARKET SNAPSHOT & GROWTH ENGINE
31.1.1 MARKET OVERVIEW
31.2 INVESTMENT: MARKET SIZE & FORECAST
31.3 AREA: MARKET SIZE & FORECAST
31.4 POWER CAPACITY: MARKET SIZE & FORECAST
31.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
32 OTHER WESTERN EUROPEAN COUNTRIES
32.1 MARKET SNAPSHOT & GROWTH ENGINE
32.1.1 MARKET OVERVIEW
32.2 INVESTMENT: MARKET SIZE & FORECAST
32.3 AREA: MARKET SIZE & FORECAST
32.4 POWER CAPACITY: MARKET SIZE & FORECAST
32.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
33 COMPETITIVE LANDSCAPE
33.1 ELECTRICAL INFRASTRUCTURE
33.2 MECHANICAL INFRASTRUCTURE
33.3 GENERAL CONSTRUCTION
33.4 DATA CENTER INVESTORS
34 PROMINENT SUPPORT INFRASTRUCTURE PROVIDERS
34.1 3M
34.1.1 BUSINESS OVERVIEW
34.1.2 PRODUCT OFFERINGS
34.2 ABB
34.2.1 BUSINESS OVERVIEW
34.2.2 PRODUCT OFFERINGS
34.3 AIREDALE INTERNATIONAL AIR CONDITIONING
34.3.1 BUSINESS OVERVIEW
34.3.2 PRODUCT OFFERINGS
34.4 ALFA LAVAL
34.4.1 BUSINESS OVERVIEW
34.4.2 PRODUCT OFFERINGS
34.5 CARRIER
34.5.1 BUSINESS OVERVIEW
34.5.2 PRODUCT OFFERINGS
34.6 CATERPILLAR
34.6.1 BUSINESS OVERVIEW
34.6.2 PRODUCT OFFERINGS
34.7 CONDAIR
34.7.1 BUSINESS OVERVIEW
34.7.2 PRODUCT OFFERINGS
34.8 CLIMAVENETA
34.8.1 BUSINESS OVERVIEW
34.8.2 PRODUCT OFFERINGS
34.9 CUMMINS
34.9.1 BUSINESS OVERVIEW
34.9.2 PRODUCT OFFERINGS
34.10 DHONDT THERMAL SOLUTIONS
34.10.1 BUSINESS OVERVIEW
34.10.2 PRODUCT OFFERINGS
34.11 DAIKIN APPLIED
34.11.1 BUSINESS OVERVIEW
34.11.2 PRODUCT OFFERINGS
34.12 DELTA ELECTRONICS
34.12.1 BUSINESS OVERVIEW
34.12.2 PRODUCT OFFERINGS
34.13 EATON
34.13.1 BUSINESS OVERVIEW
34.13.2 PRODUCT OFFERINGS
34.14 EBM-PAPST
34.14.1 BUSINESS OVERVIEW
34.14.2 PRODUCT OFFERINGS
34.15 EMICON INNOVATION AND COMFORT
34.15.1 BUSINESS OVERVIEW
34.15.2 PRODUCT OFFERINGS
34.16 ENROGEN
34.16.1 BUSINESS OVERVIEW
34.16.2 PRODUCT OFFERINGS
34.17 FLAKTGROUP
34.17.1 BUSINESS OVERVIEW
34.17.2 PRODUCT OFFERINGS
34.18 GRUNDFOS
34.18.1 BUSINESS OVERVIEW
34.18.2 PRODUCT OFFERINGS
34.19 GUNTNER
34.19.1 BUSINESS OVERVIEW
34.19.2 PRODUCT OFFERINGS
34.20 GESAB
34.20.1 BUSINESS OVERVIEW
34.20.2 PRODUCT OFFERINGS
34.21 HIREF
34.21.1 BUSINESS OVERVIEW
34.21.2 PRODUCT OFFERINGS
34.22 HITEC POWER PROTECTION
34.22.1 BUSINESS OVERVIEW
34.22.2 PRODUCT OFFERINGS
34.23 HONEYWELL INTERNATIONAL
34.23.1 BUSINESS OVERVIEW
34.23.2 PRODUCT OFFERINGS
34.24 JOHNSON CONTROLS
34.24.1 BUSINESS OVERVIEW
34.24.2 PRODUCT OFFERINGS
34.25 KOHLER-SDMO
34.25.1 BUSINESS OVERVIEW
34.25.2 PRODUCT OFFERINGS
34.26 KYOTOCOOLING
34.26.1 BUSINESS OVERVIEW
34.26.2 PRODUCT OFFERINGS
34.27 LEGRAND
34.27.1 BUSINESS OVERVIEW
34.27.2 PRODUCT OFFERINGS
34.28 MITSUBISHI ELECTRIC
34.28.1 BUSINESS OVERVIEW
34.28.2 PRODUCT OFFERINGS
34.29 MUNTERS
34.29.1 BUSINESS OVERVIEW
34.29.2 PRODUCT OFFERINGS
34.30 NLYTE SOFTWARE (CARRIER GLOBAL CORPORATION)
34.30.1 BUSINESS OVERVIEW
34.30.2 PRODUCT OFFERINGS
34.31 PERKINS ENGINES
34.31.1 BUSINESS OVERVIEW
34.31.2 PRODUCT OFFERINGS
34.32 PILLER POWER SYSTEMS
34.32.1 BUSINESS OVERVIEW
34.32.2 PRODUCT OFFERINGS
34.33 RIELLO ELETTRONICA (RIELLO UPS)
34.33.1 BUSINESS OVERVIEW
34.33.2 PRODUCT OFFERINGS
34.34 RITTAL
34.34.1 BUSINESS OVERVIEW
34.34.2 PRODUCT OFFERINGS
34.35 ROLLS-ROYCE
34.35.1 BUSINESS OVERVIEW
34.35.2 PRODUCT OFFERINGS
34.36 SCHNEIDER ELECTRIC
34.36.1 BUSINESS OVERVIEW
34.36.2 PRODUCT OFFERINGS
34.37 SIEMENS
34.37.1 BUSINESS OVERVIEW
34.37.2 PRODUCT OFFERINGS
34.38 SOCOMEC
34.38.1 BUSINESS OVERVIEW
34.38.2 PRODUCT OFFERINGS
34.39 STULZ
34.39.1 BUSINESS OVERVIEW
34.39.2 PRODUCT OFFERINGS
34.40 TRANE (INGERSOLL RAND)
34.40.1 BUSINESS OVERVIEW
34.40.2 PRODUCT OFFERINGS
34.41 VERTIV
34.41.1 BUSINESS OVERVIEW
34.41.2 PRODUCT OFFERINGS
34.42 ZIEHL-ABEGG
34.42.1 BUSINESS OVERVIEW
34.42.2 PRODUCT OFFERINGS
35 PROMINENT CONSTRUCTION CONTRACTORS
35.1 AECOM
35.1.1 BUSINESS OVERVIEW
35.1.2 SERVICE OFFERINGS
35.2 AEON ENGINEERING
35.2.1 BUSINESS OVERVIEW
35.2.2 SERVICE OFFERINGS
35.3 APL DATA CENTER
35.3.1 BUSINESS OVERVIEW
35.3.2 SERVICE OFFERINGS
35.4 ARC:MC
35.4.1 BUSINESS OVERVIEW
35.4.2 SERVICE OFFERINGS
35.5 ARIETTA
35.5.1 BUSINESS OVERVIEW
35.5.2 SERVICE OFFERINGS
35.6 ARSMAGNA
35.6.1 BUSINESS OVERVIEW
35.6.2 SERVICE OFFERINGS
35.7 ARTELIA
35.7.1 BUSINESS OVERVIEW
35.7.2 SERVICE OFFERINGS
35.8 ARUP
35.8.1 BUSINESS OVERVIEW
35.8.2 SERVICE OFFERINGS
35.9 ATKINS
35.9.1 BUSINESS OVERVIEW
35.9.2 SERVICE OFFERINGS
35.10 BASLER & HOFFMAN
35.10.1 BUSINESS OVERVIEW
35.10.2 SERVICE OFFERINGS
35.11 BENTHEM CROUWEL ARCHITECTS
35.11.1 BUSINESS OVERVIEW
35.11.2 SERVICE OFFERINGS
35.12 BOUYGUES CONSTRUCTION
35.12.1 BUSINESS OVERVIEW
35.12.2 SERVICE OFFERINGS
35.13 CALLAGHAN ENGINEERING
35.13.1 BUSINESS OVERVIEW
35.13.2 SERVICE OFFERINGS
35.14 CAP INGELEC
35.14.1 BUSINESS OVERVIEW
35.14.2 SERVICE OFFERINGS
35.15 COLLEN
35.15.1 BUSINESS OVERVIEW
35.15.2 SERVICE OFFERINGS
35.16 DEERNS
35.16.1 BUSINESS OVERVIEW
35.16.2 SERVICE OFFERINGS
35.17 DPR CONSTRUCTION
35.17.1 BUSINESS OVERVIEW
35.17.2 SERVICE OFFERINGS
35.18 EIFFAGE
35.18.1 BUSINESS OVERVIEW
35.18.2 SERVICE OFFERINGS
35.19 EYP MCF
35.19.1 BUSINESS OVERVIEW
35.19.2 SERVICE OFFERINGS
35.20 FERROVIAL
35.20.1 BUSINESS OVERVIEW
35.20.2 SERVICE OFFERINGS
35.21 FUTURE-TECH
35.21.1 BUSINESS OVERVIEW
35.21.2 SERVICE OFFERINGS
35.22 ICT FACILITIES
35.22.1 BUSINESS OVERVIEW
35.22.2 SERVICE OFFERINGS
35.23 IDOM
35.23.1 BUSINESS OVERVIEW
35.23.2 SERVICE OFFERINGS
35.24 ISG
35.24.1 BUSINESS OVERVIEW
35.24.2 SERVICE OFFERINGS
35.25 JCA ENGINEERING
35.25.1 BUSINESS OVERVIEW
35.25.2 SERVICE OFFERINGS
35.26 JERLAURE
35.26.1 BUSINESS OVERVIEW
35.26.2 SERVICE OFFERINGS
35.27 KIRBY GROUP ENGINEERING
35.27.1 BUSINESS OVERVIEW
35.27.2 SERVICE OFFERINGS
35.28 LINESIGHT
35.28.1 BUSINESS OVERVIEW
35.28.2 SERVICE OFFERINGS
35.29 LPI GROUP
35.29.1 BUSINESS OVERVIEW
35.29.2 SERVICE OFFERINGS
35.30 M+W GROUP (EXYTE)
35.30.1 BUSINESS OVERVIEW
35.30.2 SERVICE OFFERINGS
35.31 MERCURY
35.31.1 BUSINESS OVERVIEW
35.31.2 SERVICE OFFERINGS
35.32 METNOR CONSTRUCTION
35.32.1 BUSINESS OVERVIEW
35.32.2 SERVICE OFFERINGS
35.33 NICHOLAS WEBB ARCHITECTS (NWA)
35.33.1 BUSINESS OVERVIEW
35.33.2 SERVICE OFFERINGS
35.34 NORMA ENGINEERING
35.34.1 BUSINESS OVERVIEW
35.34.2 SERVICE OFFERINGS
35.35 OAKMONT CONSTRUCTION
35.35.1 BUSINESS OVERVIEW
35.35.2 SERVICE OFFERINGS
35.36 PM GROUP
35.36.1 BUSINESS OVERVIEW
35.36.2 SERVICE OFFERINGS
35.37 PQC
35.37.1 BUSINESS OVERVIEW
35.37.2 SERVICE OFFERINGS
35.38 QUARK
35.38.1 BUSINESS OVERVIEW
35.38.2 SERVICE OFFERINGS
35.39 RED
35.39.1 BUSINESS OVERVIEW
35.39.2 SERVICE OFFERINGS
35.40 REID BREWIN ARCHITECTS
35.40.1 BUSINESS OVERVIEW
35.40.2 SERVICE OFFERINGS
35.41 ROYAL HASKONINGDHV
35.41.1 BUSINESS OVERVIEW
35.41.2 SERVICE OFFERINGS
35.42 SKANSKA
35.42.1 BUSINESS OVERVIEW
35.42.2 SERVICE OFFERINGS
35.43 SPIE UK
35.43.1 BUSINESS OVERVIEW
35.43.2 SERVICE OFFERINGS
35.44 STARCHING
35.44.1 BUSINESS OVERVIEW
35.44.2 SERVICE OFFERINGS
35.45 STO BUILDING GROUP
35.45.1 BUSINESS OVERVIEW
35.45.2 SERVICE OFFERINGS
35.46 STS GROUP
35.46.1 BUSINESS OVERVIEW
35.46.2 SERVICE OFFERINGS
35.47 TPF INGENIERIE
35.47.1 BUSINESS OVERVIEW
35.47.2 SERVICE OFFERINGS
35.48 TTSP
35.48.1 BUSINESS OVERVIEW
35.48.2 SERVICE OFFERINGS
35.49 TURNER & TOWNSEND
35.49.1 BUSINESS OVERVIEW
35.49.2 SERVICE OFFERINGS
35.50 WINTHROP ENGINEERING AND CONTRACTING
35.50.1 BUSINESS OVERVIEW
35.50.2 SERVICE OFFERINGS
36 PROMINENT DATA CENTER INVESTORS
36.1 ATLASEDGE
36.1.1 BUSINESS OVERVIEW
36.1.2 SERVICE OFFERINGS
36.2 ARUBA
36.2.1 BUSINESS OVERVIEW
36.2.2 SERVICE OFFERINGS
36.3 CHINA MOBILE
36.3.1 BUSINESS OVERVIEW
36.3.2 SERVICE OFFERINGS
36.4 COLT DATA CENTRE SERVICES (COLT DCS)
36.4.1 BUSINESS OVERVIEW
36.4.2 SERVICE OFFERINGS
36.5 CYRUSONE
36.5.1 BUSINESS OVERVIEW
36.5.2 SERVICE OFFERINGS
36.6 DATA4
36.6.1 BUSINESS OVERVIEW
36.6.2 SERVICE OFFERINGS
36.7 DIGITAL REALTY
36.7.1 BUSINESS OVERVIEW
36.7.2 SERVICE OFFERINGS
36.8 ECHELON DATA CENTRES
36.8.1 BUSINESS OVERVIEW
36.8.2 SERVICE OFFERINGS
36.9 EDGECONNEX (EQT INFRASTRUCTURE)
36.9.1 BUSINESS OVERVIEW
36.9.2 SERVICE OFFERINGS
36.10 EQUINIX
36.10.1 BUSINESS OVERVIEW
36.10.2 SERVICE OFFERINGS
36.11 EUCLYDE DATA CENTERS
36.11.1 BUSINESS OVERVIEW
36.11.2 SERVICE OFFERINGS
36.12 FACEBOOK (META)
36.12.1 BUSINESS OVERVIEW
36.12.2 SERVICE OFFERINGS
36.13 GLOBAL SWITCH
36.13.1 BUSINESS OVERVIEW
36.13.2 SERVICE OFFERINGS
36.14 GOOGLE
36.14.1 BUSINESS OVERVIEW
36.14.2 SERVICE OFFERINGS
36.15 IRON MOUNTAIN (IO)
36.15.1 BUSINESS OVERVIEW
36.15.2 SERVICE OFFERINGS
36.16 KDDI
36.16.1 BUSINESS OVERVIEW
36.16.2 SERVICE OFFERINGS
36.17 LIBERTY GLOBAL
36.17.1 BUSINESS OVERVIEW
36.17.2 SERVICE OFFERINGS
36.18 MICROSOFT
36.18.1 BUSINESS OVERVIEW
36.18.2 SERVICE OFFERINGS
36.19 NAUTILUS DATA TECHNOLOGIES
36.19.1 BUSINESS OVERVIEW
36.19.2 SERVICE OFFERINGS
36.20 NDC-GARBE DATA CENTERS EUROPE
36.20.1 BUSINESS OVERVIEW
36.20.2 SERVICE OFFERINGS
36.21 NTT GLOBAL DATA CENTERS
36.21.1 BUSINESS OVERVIEW
36.21.2 SERVICE OFFERINGS
36.21.3 KEY NEWS
36.22 ORANGE BUSINESS SERVICES
36.22.1 BUSINESS OVERVIEW
36.22.2 SERVICE OFFERINGS
36.23 PROXIMITY DATA CENTRES
36.23.1 BUSINESS OVERVIEW
36.23.2 SERVICE OFFERINGS
36.23.3 KEY NEWS
36.24 PURE DATA CENTRES
36.24.1 BUSINESS OVERVIEW
36.24.2 SERVICE OFFERINGS
36.25 T5 DATA CENTERS
36.25.1 BUSINESS OVERVIEW
36.25.2 SERVICE OFFERINGS
36.26 TELECOM ITALIA SPARKLE
36.26.1 BUSINESS OVERVIEW
36.26.2 SERVICE OFFERINGS
36.27 VANTAGE DATA CENTERS
36.27.1 BUSINESS OVERVIEW
36.27.2 SERVICE OFFERINGS
36.28 VIRTUS DATA CENTRES (ST TELEMEDIA GLOBAL DATA CENTRES
36.28.1 BUSINESS OVERVIEW
36.28.2 SERVICE OFFERINGS
36.29 YONDR
36.29.1 BUSINESS OVERVIEW
36.29.2 SERVICE OFFERINGS
37 NEW ENTRANTS
37.1 GLOBAL TECHNICAL REALTY
37.1.1 BUSINESS OVERVIEW
37.1.2 SERVICE OFFERINGS
37.1.3 KEY NEWS
37.2 STRATUS DC MANAGEMENT
37.2.1 BUSINESS OVERVIEW
37.2.2 SERVICE OFFERINGS
38 REPORT SUMMARY
38.1 KEY TAKEAWAYS
39 QUANTITATIVE SUMMARY
39.1 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET
39.1.1 INVESTMENT: MARKET SIZE & FORECAST
39.1.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.2 MARKET SEGMENTATION
39.2.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
39.2.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
39.2.3 COOLING SYSTEMS: MARKET SIZE & FORECAST
39.2.4 COOLING TECHNIQUES: MARKET SIZE & FORECAST
39.2.5 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
39.2.6 TIER STANDARDS: MARKET SIZE & FORECAST
39.2.7 FACILITY TYPE: MARKET SIZE & FORECAST BY INVESTMENT
39.2.8 FACILITY TYPE: MARKET SIZE & FORECAST BY AREA
39.2.9 FACILITY TYPE: MARKET SIZE & FORECAST BY POWER CAPACITY
39.3 MARKET BY GEOGRAPHY
39.3.1 INVESTMENT: MARKET SIZE & FORECAST
39.3.2 AREA: MARKET SIZE & FORECAST
39.3.3 POWER CAPACITY: MARKET SIZE & FORECAST
39.4 UK
39.4.1 INVESTMENT: MARKET SIZE & FORECAST
39.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.5 GERMANY
39.5.1 INVESTMENT: MARKET SIZE & FORECAST
39.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.6 FRANCE
39.6.1 INVESTMENT: MARKET SIZE & FORECAST
39.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.7 NETHERLANDS
39.7.1 INVESTMENT: MARKET SIZE & FORECAST
39.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.8 IRELAND
39.8.1 INVESTMENT: MARKET SIZE & FORECAST
39.8.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.9 SWITZERLAND
39.9.1 INVESTMENT: MARKET SIZE & FORECAST
39.9.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.10 ITALY
39.10.1 INVESTMENT: MARKET SIZE & FORECAST
39.10.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.11 SPAIN
39.11.1 INVESTMENT: MARKET SIZE & FORECAST
39.11.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.12 BELGIUM
39.12.1 INVESTMENT: MARKET SIZE & FORECAST
39.12.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.13 PORTUGAL
39.13.1 INVESTMENT: MARKET SIZE & FORECAST
39.13.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
39.14 OTHER WESTERN EUROPEAN COUNTRIES
39.14.1 INVESTMENT: MARKET SIZE & FORECAST
39.14.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40 APPENDIX
40.1 ABBREVIATIONS
LIST OF EXHIBITS
EXHIBIT 1 SEGMENTATION OF WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET
EXHIBIT 2 MARKET SIZE CALCULATION APPROACH 2022
EXHIBIT 3 IMPACT OF HIGHER ADOPTION OF ARTIFICIAL INTELLIGENCE
EXHIBIT 4 IMPACT OF INCREASING ADOPTION OF DISTRICT HEATING SYSTEMS
EXHIBIT 5 IMPACT OF DATA CENTERS PRIORITIZING SUSTAINABILITY
EXHIBIT 6 IMPACT OF INNOVATIONS IN DATA CENTER TECHNOLOGIES
EXHIBIT 7 IMPACT OF INCREASING 5G DEPLOYMENTS FUELING EDGE DATA CENTERS
EXHIBIT 8 IMPACT OF GROWTH IN THE ADOPTION OF CLOUD SERVICES
EXHIBIT 9 IMPACT OF INCREASING ADOPTION OF BIG DATA & IOT
EXHIBIT 10 IMPACT OF SUPPORT FROM THE GOVERNMENT
EXHIBIT 11 IMPACT OF MODULAR DATA CENTER CONSTRUCTION
EXHIBIT 12 IMPACT OF GROWING SUBMARINE & INLAND CONNECTIVITY
EXHIBIT 13 IMPACT OF ADOPTION OF OCP & HYPERSCALE INFRASTRUCTURE
EXHIBIT 14 IMPACT OF SECURITY CHALLENGES IN DATA CENTERS
EXHIBIT 15 IMPACT OF CARBON EMISSIONS AFFECTING DATA CENTER SUSTAINABILITY
EXHIBIT 16 IMPACT OF LOCATION CONSTRAINTS ON DATA CENTER DEVELOPMENT
EXHIBIT 17 IMPACT OF LACK OF SKILLED DATA CENTER PROFESSIONALS
EXHIBIT 18 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ BILLION)
EXHIBIT 19 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (MILLION SQUARE FEET)
EXHIBIT 20 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 21 FIVE FORCES ANALYSIS 2022
EXHIBIT 22 INCREMENTAL GROWTH BY FACILITY TYPE 2022 & 2028
EXHIBIT 23 INCREMENTAL GROWTH BY FACILITY TYPE BY AREA 2022 & 2028
EXHIBIT 24 INCREMENTAL GROWTH BY FACILITY TYPE BY POWER CAPACITY 2022 & 2028
EXHIBIT 25 WESTERN EUROPE COLOCATION DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 26 WESTERN EUROPE COLOCATION DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 27 WESTERN EUROPE COLOCATION DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 28 WESTERN EUROPE HYPERSCALE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 29 WESTERN EUROPE HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 30 WESTERN EUROPE HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 31 WESTERN EUROPE ENTERPRISE DATA CENTER CONSTRUCTION MARKET 2022?2028 ($ MILLION)
EXHIBIT 32 WESTERN EUROPE ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 33 WESTERN EUROPE ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 34 INCREMENTAL GROWTH BY INFRASTRUCTURE 2022 & 2028
EXHIBIT 35 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022?2028 ($ BILLION)
EXHIBIT 36 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022?2028 ($ BILLION)
EXHIBIT 37 WESTERN EUROPE DATA CENTER CONSTRUCTION COST ($/WATT) IN 2022
EXHIBIT 38 WESTERN EUROPE DATA CENTER GENERAL CONSTRUCTION MARKET 2022?2028 ($ BILLION)
EXHIBIT 39 INCREMENTAL GROWTH BY ELECTRIC INFRASTRUCTURE 2022 & 2028
EXHIBIT 40 WESTERN EUROPE DATA CENTER CONSTRUCTION UPS SYSTEMS MARKET 2022-2028 ($ MILLION)
EXHIBIT 41 VRLA BATTERIES VS. LITHIUM-ION BATTERIES IN UPS SYSTEMS (POWER)
EXHIBIT 42 WESTERN EUROPE DATA CENTER CONSTRUCTION GENERATORS MARKET 2022-2028 ($ MILLION)
EXHIBIT 43 WESTERN EUROPE DATA CENTER CONSTRUCTION TRANSFER SWITCHES & SWITCHGEAR MARKET 2022-2028 ($ MILLION)
EXHIBIT 44 WESTERN EUROPE DATA CENTER CONSTRUCTION PDUS MARKET 2022-2028 ($ MILLION)
EXHIBIT 45 WESTERN EUROPE DATA CENTER CONSTRUCTION OTHER ELECTRICAL INFRASTRUCTURE MARKET 2022-2028 ($ MILLION)
EXHIBIT 46 INCREMENTAL GROWTH BY MECHANICAL INFRASTRUCTURE 2022 & 2028
EXHIBIT 47 COOLING SYSTEMS SEGMENTATION
EXHIBIT 48 WESTERN EUROPE DATA CENTER CONSTRUCTION COOLING SYSTEMS MARKET 2022-2028 ($ MILLION)
EXHIBIT 49 WESTERN EUROPE DATA CENTER CONSTRUCTION RACKS MARKET 2022-2028 ($ MILLION)
EXHIBIT 50 WESTERN EUROPE DATA CENTER CONSTRUCTION OTHER MECHANICAL INFRASTRUCTURE MARKET 2022-2028 ($ MILLION)
EXHIBIT 51 INCREMENTAL GROWTH BY COOLING SYSTEMS 2022 & 2028
EXHIBIT 52 COMPONENTS OF CRAC AND CRAH UNITS
EXHIBIT 53 WESTERN EUROPE DATA CENTER CONSTRUCTION CRAC & CRAH UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 54 WESTERN EUROPE DATA CENTER CONSTRUCTION CHILLER UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 55 WESTERN EUROPE DATA CENTER CONSTRUCTION COOLING TOWERS, CONDENSERS & DRY COOLERS MARKET 2022-2028 ($ MILLION)
EXHIBIT 56 WESTERN EUROPE DATA CENTER CONSTRUCTION ECONOMIZERS & EVAPORATIVE COOLERS MARKET 2022-2028 ($ MILLION)
EXHIBIT 57 WESTERN EUROPE DATA CENTER CONSTRUCTION OTHER COOLING UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 58 INCREMENTAL GROWTH BY COOLING TECHNIQUE 2022 & 2028
EXHIBIT 59 WESTERN EUROPE DATA CENTER CONSTRUCTION AIR-BASED COOLING MARKET 2022-2028 ($ MILLION)
EXHIBIT 60 WESTERN EUROPE DATA CENTER CONSTRUCTION LIQUID-BASED COOLING MARKET 2022-2028 ($ MILLION)
EXHIBIT 61 INCREMENTAL GROWTH BY GENERAL CONSTRUCTION 2022 & 2028
EXHIBIT 62 WESTERN EUROPE DATA CENTER CONSTRUCTION CORE & SHELL DEVELOPMENT MARKET 2022-2028 ($ MILLION)
EXHIBIT 63 WESTERN EUROPE DATA CENTER CONSTRUCTION INSTALLATION & COMMISSIONING SERVICES MARKET 2022-2028 ($ MILLION)
EXHIBIT 64 WESTERN EUROPE DATA CENTER CONSTRUCTION ENGINEERING & BUILDING DESIGN MARKET 2022-2028 ($ MILLION)
EXHIBIT 65 WESTERN EUROPE DATA CENTER CONSTRUCTION FIRE DETECTION & SUPPRESSION MARKET 2022-2028 ($ MILLION)
EXHIBIT 66 WESTERN EUROPE DATA CENTER CONSTRUCTION PHYSICAL SECURITY MARKET 2022-2028 ($ MILLION)
EXHIBIT 67 WESTERN EUROPE DATA CENTER CONSTRUCTION DCIM/BMS SOLUTIONS MARKET 2022-2028 ($ MILLION)
EXHIBIT 68 INCREMENTAL GROWTH BY TIER STANDARDS 2022 & 2028
EXHIBIT 69 DATA CENTER TIER STANDARDS
EXHIBIT 70 WESTERN EUROPE TIER I & II DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 71 WESTERN EUROPE TIER III DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 72 WESTERN EUROPE TIER IV DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 73 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 74 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 75 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 76 SNAPSHOT: UK DATA CENTER CONSTRUCTION MARKET
EXHIBIT 77 UK DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 78 UK DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 79 UK DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 80 UK DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 81 UK DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 82 SNAPSHOT: GERMANY DATA CENTER CONSTRUCTION MARKET
EXHIBIT 83 GERMANY DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 84 GERMANY DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 85 GERMANY DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 86 GERMANY DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 87 GERMANY DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 88 SNAPSHOT: FRANCE DATA CENTER CONSTRUCTION MARKET
EXHIBIT 89 FRANCE DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 90 FRANCE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 91 FRANCE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 92 FRANCE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 93 FRANCE DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 94 SNAPSHOT: NETHERLANDS DATA CENTER CONSTRUCTION MARKET
EXHIBIT 95 NETHERLANDS DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 96 NETHERLANDS DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 97 NETHERLANDS DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 98 NETHERLANDS DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 99 NETHERLANDS DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 100 SNAPSHOT: IRELAND DATA CENTER CONSTRUCTION MARKET
EXHIBIT 101 IRELAND DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 102 IRELAND DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 103 IRELAND DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 104 IRELAND DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 105 IRELAND DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 106 SNAPSHOT: SWITZERLAND DATA CENTER CONSTRUCTION MARKET
EXHIBIT 107 SWITZERLAND DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 108 SWITZERLAND DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 109 SWITZERLAND DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 110 SWITZERLAND DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 111 SWITZERLAND DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 112 SNAPSHOT: ITALY DATA CENTER CONSTRUCTION MARKET
EXHIBIT 113 ITALY DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 114 ITALY DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 115 ITALY DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 116 ITALY DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 117 ITALY DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 118 SNAPSHOT: SPAIN DATA CENTER CONSTRUCTION MARKET
EXHIBIT 119 SPAIN DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 120 SPAIN DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 121 SPAIN DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 122 SPAIN DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 123 SPAIN DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 124 SNAPSHOT: BELGIUM DATA CENTER CONSTRUCTION MARKET
EXHIBIT 125 BELGIUM DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 126 BELGIUM DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 127 BELGIUM DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 128 BELGIUM DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 129 BELGIUM DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 130 SNAPSHOT: PORTUGAL DATA CENTER CONSTRUCTION MARKET
EXHIBIT 131 PORTUGAL DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 132 PORTUGAL DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 133 PORTUGAL DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 134 PORTUGAL DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 135 PORTUGAL DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 136 SNAPSHOT: OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET
EXHIBIT 137 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 138 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 139 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 140 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 141 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2022 ($ MILLION)
LIST OF TABLES
TABLE 1 KEY CAVEATS
TABLE 2 CURRENCY CONVERSION 2016?2022
TABLE 3 UPCOMING SUBMARINE CABLES CONNECTING WESTERN EUROPE
TABLE 4 DATA CENTER INVESTMENTS ACROSS UK 2022
TABLE 5 SOME ACQUISITIONS IN THE UK DATA CENTER CONSTRUCTION MARKET
TABLE 6 DATA CENTER INVESTMENTS ACROSS GERMANY 2022
TABLE 7 DATA CENTER INVESTMENTS ACROSS FRANCE 2022
TABLE 8 DATA CENTER INVESTMENTS ACROSS NETHERLANDS 2022
TABLE 9 DATA CENTER INVESTMENTS ACROSS IRELAND 2022
TABLE 10 DATA CENTER INVESTMENTS ACROSS SWITZERLAND 2022
TABLE 11 DATA CENTER INVESTMENTS ACROSS ITALY 2022
TABLE 12 DATA CENTER INVESTMENTS ACROSS SPAIN 2022
TABLE 13 DATA CENTER INVESTMENTS ACROSS PORTUGAL 2022
TABLE 14 DATA CENTER INVESTMENTS ACROSS PORTUGAL 2022
TABLE 15 DATA CENTER INVESTMENTS ACROSS OTHER WESTERN EUROPEAN COUNTRIES 2022
TABLE 16 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2022-2028
TABLE 17 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ BILLION)
TABLE 18 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 19 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 20 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY COOLING SYSTEMS 2022-2028 ($ MILLION)
TABLE 21 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY COOLING TECHNIQUES 2022-2028 ($ MILLION)
TABLE 22 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY GENERAL CONSTRUCTION 2022-2028 ($ MILLION)
TABLE 23 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY TIER STANDARDS 2022-2028 ($ MILLION)
TABLE 24 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE 2022-2028 ($ MILLION)
TABLE 25 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY AREA BY FACILITY TYPE 2022-2028 (THOUSAND SQUARE FEET)
TABLE 26 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY BY FACILITY TYPE 2022-2028 (MW)
TABLE 27 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2022-2028 ($ MILLION)
TABLE 28 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY AREA BY GEOGRAPHY 2022-2028 (THOUSAND SQUARE FEET)
TABLE 29 WESTERN EUROPE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY BY GEOGRAPHY 2022-2028 (MW)
TABLE 30 UK DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 31 UK DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 32 GERMANY DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 33 GERMANY DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 34 FRANCE DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 35 FRANCE DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 36 NETHERLANDS DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 37 NETHERLANDS DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 38 IRELAND DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 39 IRELAND DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 40 SWITZERLAND DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 41 SWITZERLAND DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 42 ITALY DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 43 ITALY DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 44 SPAIN DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 45 SPAIN DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 46 BELGIUM DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 47 BELGIUM DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 48 PORTUGAL DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 49 PORTUGAL DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 50 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 51 OTHER WESTERN EUROPEAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.