United Arab Emirates Data Center - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026 - 2031)
Market Report I 2026-02-09 I 127 Pages I Mordor Intelligence
United Arab Emirates Data Center Market Analysis
United Arab Emirates Data Center market size in 2026 is estimated at USD 1.74 billion, growing from 2025 value of USD 1.48 billion with 2031 projections showing USD 3.86 billion, growing at 17.33% CAGR over 2026-2031. In terms of IT load capacity, the market is expected to grow from 507.70 megawatts in 2025 to 675.80 megawatts by 2030, at a CAGR of 5.89% during the forecast period (2025-2030). The market segment shares and estimates are calculated and reported in terms of MW. Sovereign-backed AI programs, mandatory data-residency rules, and hyperscale cloud expansions are rewriting demand curves as enterprises prioritize local, GPU-dense capacity over retrofits. Government capital commitments topping USD 50 billion, including the 5 GW Stargate complex, reinforce the UAE's position as the Middle East's digital infrastructure hub and tilt investment toward liquid-immersion cooling, on-site renewables, and nuclear-sourced baseload power. Localization mandates from the Central Bank of the UAE and the Telecommunications and Digital Government Regulatory Authority further tighten the link between regulatory compliance and domestic compute footprints, while 5G roll-outs and autonomous mobility accelerate the shift toward edge nodes. Market concentration has intensified after Khazna's capacity leap from 28 MW in 2020 to more than 500 MW in 2025, prompting enterprise buyers to weigh pricing power against the operational resilience promised by sovereign-aligned operators.
United Arab Emirates Data Center Market Trends and Insights
Government digital transformation accelerates infrastructure demand
Smart Dubai's 2024 cloud-first directive and the Digital Government Strategy 2025 push 90% of public services onto digital channels, increasing the call for sovereign cloud footprints that meet strict residency rules. MGX's USD 100 billion technology fund, backed by Mubadala and G42, funnels patient capital into data-center builds that anchor wider AI initiatives. Abu Dhabi's USD 25 billion energy partnership with Energy Capital Partners underwrites dedicated generation assets, derisking long-term power procurement for hyperscale tenants. Regulatory agencies now require disaster-recovery zones inside national borders, enlarging demand for multi-availability-zone designs. Across ministries, procurement guidelines specify Uptime Institute Tier 3 or higher, advancing the quality baseline of new facilities.
Hyperscale localization drives capacity expansion
Microsoft's AED 2 billion development agreement with du signals the most aggressive single tranche of foreign hyperscale capital committed to the UAE, immediately locking in power and land allotments ahead of forecasted grid constraints. AWS and Google Cloud follow with region expansions that bundle cybersecurity offsets and workforce-training pledges, accelerating time-to-market for enterprise workloads. Each cloud launch compels colocation operators to pre-provision dark fiber routes and sign renewable-energy power purchase agreements. Secondary effects include a spike in wholesale-rack absorption by managed-service providers that resell cloud interconnects, tightening space in premium facilities. Localization also compresses pricing differences between Dubai and Abu Dhabi as hyperscalers negotiate multi-gigawatt procurement on a national basis.
Semiconductor supply-chain vulnerabilities constrain growth
U.S. export-license vetting for advanced AI accelerators lengthens lead times and raises the cost of replacement parts for UAE operators, pressuring maintenance windows in mission-critical clusters. While exploratory talks with foundry leaders hint at future domestic fabrication, commercial yields remain multiple years away. The single-sourcing of high-bandwidth memory from South Korea and Taiwan intensifies exposure to geopolitical events, forcing operators to hold larger onsite spares and adopt multi-vendor firmware validation. These measures add capital overhead and complicate power and thermal modeling under worst-case inventory scenarios.
Other drivers and restraints analyzed in the detailed report include:
Sovereign AI models reshape infrastructure requirementsData residency mandates create localization imperativeConstruction labor scarcity inflates infrastructure costs
For complete list of drivers and restraints, kindly check the Table Of Contents.
Segment Analysis
Massive campuses recorded the highest 7.78% CAGR, signaling operator preference for integrated, purpose-built complexes able to stage phased roll-outs that synchronize with GPU procurement waves. Large facilities still wield 46.35% of capacity and remain the anchor of retail colocation offers, yet new contracts skew toward blocks of 10 MW and above as cloud providers negotiate multi-year take-or-pay terms. The UAE data center market size for massive builds is forecast to reach 256 MW by 2031, capitalizing on economies in high-voltage substation access and heat-recovery loops. Sovereign capital underwrites long-tenor debt at favorable spreads, lowering weighted average cost of capital relative to developer peers in secondary markets and supporting aggressive price-per-kilowatt bids that incumbents struggle to match.
Within this framework, Khazna's portfolio expansion from 28 MW in 2020 to 500 MW five years later demonstrates how sovereign backing accelerates land-bank assembly, power reservation, and entitlement processing. The UAE data center market share commanded by massive sites will widen once the Stargate campus reaches commercial readiness and rolls subsequent 1 GW tranches, a step change that few private operators can replicate. Mid-sized builds continue to serve disaster-recovery and field-office workloads, yet their pipeline slackens as clients opt for availability-zone diversity within the same hyperscale estate rather than scattered stand-alones.
Tier 3 dominates at 76.60% as enterprises balance redundancy with capital efficiency, but the Tier 4 subset is accelerating at 7.28% CAGR as BFSI, government, and AI inference clusters translate downtime intolerance into contractual service-level objectives. The UAE data center market size for Tier 4 footprints is expected to surpass 151 MW by 2031, driven by the maturation of supply chains for concurrently maintainable switchgear and fault-tolerant powertrain components. Operators chase Up-time Institute design certifications to unlock premium rates and long-term take-or-pay agreements in regulated verticals.
Abu Dhabi Municipality's achievement of Tier 4 certification for its modular disaster-recovery site sets a public-sector benchmark. Client RFPs now demand micro-segmented security domains and dual-feed cooling tower loops, features easier to hardwire in new builds than to retrofit. Tier 1 and Tier 2 footprints contract in share as dev-test environments migrate to public cloud, concentrating remaining demand in legacy applications awaiting refactoring.
The United Arab Emirates Data Center Market Report is Segmented by Data Center Size (Large, Massive, Medium, Mega, and Small), Tier Type (Tier 1 and 2, Tier 3, and Tier 4), Data Center Type (Hyperscale/Self-Built, Enterprise/Edge, and Colocation), End User (BFSI, IT and ITES, E-Commerce, Government, Manufacturing, Media and Entertainment, and More), and Hotspot. The Market Forecasts are Provided in Terms of IT Load Capacity (MW).
List of Companies Covered in this Report:
Khazna Data Center Moro Hub du (Emirates Integrated Telecommunications Company) Gulf Data Hub Etisalat Equinix, Inc. Pacific Controls Data Center Web Werks datamena eHosting DataFort Core42 - G42 Company CtrlS Datacenters Pvt Ltd dcvaults
Additional Benefits:
The market estimate (ME) sheet in Excel format
3 months of analyst support
1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study
2 RESEARCH METHODOLOGY
3 EXECUTIVE SUMMARY
4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Market Drivers
4.2.1 Robust government digital-first agenda and Smart Dubai / UAE 2031 visions
4.2.2 Accelerated hyperscale cloud region roll-outs by AWS, Microsoft and Google
4.2.3 Rapid adoption of sovereign AI models (e.g., G42 "Jais") driving GPU-dense builds
4.2.4 Mandatory in-country data-residency for regulated sectors (CBUAE, TDRA)
4.2.5 Surging green-hydrogen pilot projects spurring interest in on-site renewable PPA
4.2.6 Emergence of "Desert-cooled" liquid-immersion designs cutting PUE below 1.2
4.3 Market Restraints
4.3.1 Limited domestic semiconductor supply chain for replacement parts
4.3.2 Scarcity of Tier-1 construction labour inflating EPC costs
4.3.3 Intensifying cross-border cable-landing competition from Saudi and Oman
4.3.4 High water-stress leading to stricter Dubai and Abu Dhabi cooling regulations
4.4 Market Outlook
4.4.1 IT Load Capacity
4.4.2 Raised Floor Space
4.4.3 Colocation Revenue
4.4.4 Installed Racks
4.4.5 Rack Space Utilization
4.4.6 Submarine Cable
4.5 Key Industry Trends
4.5.1 Smartphone Users
4.5.2 Data Traffic Per Smartphone
4.5.3 Mobile Data Speed
4.5.4 Broadband Data Speed
4.5.5 Fiber Connectivity Network
4.5.6 Regulatory Framework
4.6 Value Chain and Distribution Channel Analysis
4.7 Porter's Five Forces Analysis
4.7.1 Threat of New Entrants
4.7.2 Bargaining Power of Buyers
4.7.3 Bargaining Power of Suppliers
4.7.4 Threat of Substitutes
4.7.5 Intensity of Competitive Rivalry
5 MARKET SIZE AND GROWTH FORECASTS (MEGAWATT)
5.1 By Data Center Size
5.1.1 Large
5.1.2 Massive
5.1.3 Medium
5.1.4 Mega
5.1.5 Small
5.2 By Tier Standard
5.2.1 Tier 1 and 2
5.2.2 Tier 3
5.2.3 Tier 4
5.3 By Data Center Type
5.3.1 Hyperscale / Self-Built
5.3.2 Enterprise / Edge
5.3.3 Colocation
5.3.3.1 Non-Utilized
5.3.3.2 Utilized
5.3.3.2.1 Retail Colocation
5.3.3.2.2 Wholesale Colocation
5.4 By End User Industry
5.4.1 BFSI
5.4.2 IT and ITES
5.4.3 E-Commerce
5.4.4 Government
5.4.5 Manufacturing
5.4.6 Media and Entertainment
5.4.7 Telecom
5.4.8 Other End Users
5.5 By Hotspot
5.5.1 Dubai
5.5.2 Abu Dhabi
5.5.3 Rest of United Arab Emirates
6 COMPETITIVE LANDSCAPE
6.1 Market Concentration
6.2 Strategic Moves
6.3 Market Share Analysis
6.4 Company Profiles {(includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)}
6.4.1 Khazna Data Center
6.4.2 Moro Hub
6.4.3 du (Emirates Integrated Telecommunications Company)
6.4.4 Gulf Data Hub
6.4.5 Etisalat
6.4.6 Equinix, Inc.
6.4.7 Pacific Controls Data Center
6.4.8 Web Werks
6.4.9 datamena
6.4.10 eHosting DataFort
6.4.11 Core42 - G42 Company
6.4.12 CtrlS Datacenters Pvt Ltd
6.4.13 dcvaults
7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK
7.1 White-space and Unmet-need Assessment
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.