U.S. Data Center Construction Market - Industry Outlook & Forecast 2022-2027
Market Report I 2022-09-14 I 467 Pages I Arizton Advisory & Intelligence
The U.S. data center construction market is expected to grow at a CAGR of 3.47% during 2022-2028.
MARKET INSIGHTS
The U.S. is the most mature data center development and operations market. The growing popularity of IoT, the emergence of 5G networks, and the demand for streaming online entertainment content at high speeds are the significant factors driving the growth of the data center construction market in the US.
Increasing data traffic has created additional demand for developing many data centers that support data generated by businesses and consumers. The use of cloud computing services and applications will continue to grow in the US, further developing large hyperscale cloud-based centers. Some preferred locations by operators in the US are Virginia, Texas, California, Illinois, Georgia, Oregon, Nevada, Arizona, and Ohio. Virginia and Texas are the leading states in data center investments in 2021.
U.S. DATA CENTER CONSTRUCTION MARKET OPPORTUNITIES
- The US has emerged as the most prominent cloud market in the world with the presence of major global cloud operators. The wide adoption of cloud services has increased the country's need for data center construction.
- There is increased growth of hyperscale facilities in the US, such as Facebook, Microsoft, Amazon Web Services, Apple, and Google. In 2021, about 27 hyperscale data centers began operations or were under construction in the US.
- The modern data center is based upon Tier standards to evaluate facilities based on the efficiency, performance, and redundancy of the infrastructure the Uptime Institute gives. Other standards for construction include LEED Certification, TIA 942, and ANSI/BICSI 002-2019 certifications.
- The Western US expects to dominate the market in terms of overall investment during the forecast period, garnering over $6.6 billion. However, the South-Eastern and Mid-Western US will compete with the Western US regarding investments and the number of projects during the forecast period.
- Cloud expansion in the US involves a mix of colocation & self-built workloads. Collectively, colocation operators and investments are boosting the region's growth of data center construction.
- The construction of data center in the US is growing substantially, with leading service providers investing significantly in new developments and expansions. There has been significant growth in M&A under Joint ventures, which have positively impacted the construction market's growth.
KEY TRENDS DRIVING THE MARKET
Impact of Cloud Connectivity
- After the COVID-19 outbreak, there was a growth in cloud services in the United States data center market as enterprises shifted their workloads to the cloud infrastructure. For instance, YouTube migrated its infrastructure to the cloud.
- Many hyperscale facilities are being built, enabling cloud service providers to expand their cloud region across the US.
- Government agencies have migrated their applications to a private cloud environment where cloud service providers operate.
- Major regional cloud service providers plan to collaborate to provide cloud-based services. Collaborations with the new entrants to colocate their workloads with the existing colocation operators.
- The growing use of cloud computing applications and services in the US will aid in developing cloud-based hyperscale data centers.
- The economy projects will increase due to the investments paving the way for more construction projects across the states.
Big Data & IoT Driving the Market Growth
- The US is one of the major hubs for IoT and big data, where most data is being generated. As a result, the deployment of hyperscale investment was witnessed in the country to keep the data secured.
- There is a high internet penetration rate in the US, i.e., around 85%, which increases the amount of data generated. Also, the country contributes over 50% of the world's spending on big data and analytics solutions.
- In August 2021, AT&T and Cisco partnered to launch 5G services to boost performance for Internet of Things (IoT) applications across the US.
- Metaverse is gaining popularity allowing the users to connect via VR (Virtual Reality) and AR (Augmented Reality), generating vast amounts of data using connected devices such as mobile phones & computers.
- The adoption of IoT will drive the demand for edge data center construction requiring low latency with high computing capabilities.
Rising Colocation Investments
- Prominent investors in the US include Equinix, Digital Realty, CyrusOne, Google, QTS Realty Trust, Vantage Data Centers, and NTT Global Data Centers.
- In February 2021, A 36MW IT load facility was launched by NTT Global Data Centers in Hillsboro, Oregon.
- In May 2021, TA Realty announced its plan to develop a 300MW data center campus in Loudoun County, Virginia, spanning 1.5 million sq. ft.
- In April 2021, the Construction of a 240MW data center campus was started by NTT Global Data Centers in Arizona.
- In April 2021, Construction of a 48MW facility named ORD-1 was commenced by Aligned, which will be expandable to 60MW.
- An increase in investments will help provide revenue opportunities to construction contractors and infrastructure providers worth billions of dollars.
Tax Incentives Boosting Construction Market
- One of the essential enablers for the data center construction market is tax incentives and breaks offered in states and countries across the US, which helps yield high savings while incorporating other specified benefits.
- Rhode Island has passed an act for exception from property and sales tax for 50 years for data centers fulfilling the criteria.
- Tax relief of around $150 million was offered to Facebook by Utah's local community for 20 years.
- In 2020, Michigan approved $20 million under tax incentives for Switch Data Centers for data center construction.
- A Data Center Investment Program was established in Illinois to provide local and state tax exemptions to the operators and owners.
SEGMENTS ANALYSIS
Segmentation by Facility Type
- Colocation Data Centers
- Hyperscale Data Centers
- Enterprise Data Centers
Segmentation by Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
Segmentation by Electrical Infrastructure
- Uninterruptible Power Supply (UPS) Systems
- Generators
- Power Distribution Units
- Transfer Switches & Switchgear
- Other Electrical Infrastructure
Segmentation by Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
Segmentation by Cooling Systems
- CRAC & CRAH Units
- Chiller Units
- Cooling Towers
- Condensers & Dry Coolers
- Economizer & Evaporative Coolers
- Other Cooling Units
Segmentation by Cooling Techniques
- Air-based Cooling Techniques
- Liquid-based Cooling Techniques
Segmentation by General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Fire Detection & Suppression
- Physical Security
- DCIM / BMS Solutions
Segmentation by Tier Standards
- Tier I & II
- Tier III
- Tier IV
Segmentation by Geography:?
o Western US
o South-Eastern US
o Mid-Western US
o South-Western US
o North-Eastern US
COMPETITIVE ANALYSIS
- The market consists of contractors, architectural and engineering firms, physical security vendors, and DCIM service providers. With the growing construction of hyperscale facilities, revenue opportunities for construction contractors are high as several centers are developing. Some major construction contractors operating in the market include AECOM, DPR Construction, Corgan, Turner Construction, and Jacobs and Holder Construction.
- Construction contractors collaborate with infrastructure vendors to provide modular infrastructure solutions, helping them manage costs and scaling. Manufacturers such as Huawei offers prefabricated modular facilities such as FusionDC1000B, which can be small or medium-sized and incorporate Artificial Intelligence.
- The increasing number of cloud regions will benefit construction contractors, infrastructure providers, architectural and engineering firms, and others.
- Vendors are focusing on the regions with the lower labor and land costs while confirming the data center construction specifications are followed.
- The market competitiveness will be increased by the high costs of modern security systems being procured. At the same time, the DCIM/BMS solutions will remain competitive for decreasing the OPEX of the facility.
Key Data Center Support Infrastructure Providers
- ABB
- Caterpillar
- Cummins
- Delta Electronics
- Eaton
- Legrand
- Rolls-Royce
- Schneider Electric
- STULZ
- Vertiv
Key Data Center Contractors
- AECOM
- Arup
- Black & Veatch
- Corgan
- DPR Construction
- Fortis Construction
- Harley Ellis Devereaux (HED)
- Holder Construction
- Jacobs
- Rogers-O'Brien Construction
- Syska Hennessy Group
- Turner Construction
Key Data Center Investors
- Apple
- Amazon Web Services (AWS)
- CyrusOne
- DataBank
- Digital Realty
- Equinix
- Facebook (Meta)
- Google
- Microsoft
- NTT Global Data Centers
Other Prominent Support Infrastructure Providers
- Airedale International Air Conditioning
- Alfa Laval
- Asetek
- Bloom Energy
- Carrier
- Condair
- Cormant
- Cyber Power Systems
- Data Aire
- Enlogic
- FNT Software
- Generac Power Systems
- Green Revolution Cooling (GRC)
- HITEC Power Protection
- Johnson Controls
- KOHLER
- KyotoCooling
- Mitsubishi Electric
- Natron Energy
- NetZoom
- Nlyte Software
- Rittal
- Siemens
- TRANE (Ingersoll Rand)
- Tripp Lite
- Yanmar (Himoinsa)
- ZincFive
Other Prominent Construction Contractors
- AlfaTech
- BlueScope Construction
- Burns & Mcdonnell
- CallisonRTKL
- Clune Construction
- EMCOR Group
- EYP MCF
- Gensler
- Fluor Corporation
- Gilbane Building Company
- HDR
- HITT Contracting
- Hoffman Construction
- JE Dunn Construction
- Linesight
- M+W Group (EXYTE)
- Morrison Hershfield
- Mortenson
- Sheehan Nagle Hartray Architects
- Structure Tone
- The Mulhern Group
- The Walsh Group
- The Weitz Company
- Tindall
Other Prominent Data Center Investors
- Aligned
- American Tower
- CloudHQ
- Cologix
- Compass Datacenters
- COPT Data Center Solutions
- CoreSite Realty
- Cyxtera Technologies
- DartPoints
- DC BLOX
- EdgeCore Internet Real Estate
- EdgeConneX
- EdgePresence
- Element Critical
- Flexential
- fifteenfortyseven Critical Systems Realty
- GIGA Data Centers
- HostDime
- Iron Mountain
- Prime Data Centers
- QTS Realty Trust
- Sabey Data Center
- Skybox Datacenters
- Stream Data Centers
- STACK INFRASTRUCTURE
- Switch
- T5 Data Centers
- Vantage Data Centers
- Vapor IO
New Entrants
- AUBix
- Cirrus Data Services
- DaSTOR
- EdgeX Data Centers
- Novva
- PointOne
- Quantum Loophole
- Yondr
KEY QUESTIONS ANSWERED
1. What will be the U.S. data center construction market size by 2027?
2. What will be the market size in terms of area for the U.S. Data Center Construction Market by 2027?
3. Who are the key investors in the U.S. data center construction market?
4. What are the segments covered in the U.S. data center construction market?
5. What factors drive the growth in the U.S. data center construction market?
1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 SCOPE & COVERAGE
4.1 MARKET DEFINITION
4.2 BASE YEAR
4.3 SCOPE OF THE STUDY
4.3.1 MARKET SEGMENTATION BY FACILITY TYPE
4.3.2 MARKET SEGMENTATION BY CONSTRUCTION TYPE
4.3.3 MARKET SEGMENTATION BY INFRASTRUCTURE
4.3.4 MARKET SEGMENTATION BY ELECTRICAL INFRASTRUCTURE
4.3.5 MARKET SEGMENTATION BY MECHANICAL INFRASTRUCTURE
4.3.6 MARKET SEGMENTATION BY COOLING SYSTEM
4.3.7 MARKET SEGMENTATION BY COOLING TECHNIQUES
4.3.8 MARKET SEGMENTATION BY GENERAL CONSTRUCTION
4.3.9 MARKET SEGMENTATION BY TIER STANDARDS
4.3.10 MARKET SEGMENTATION BY GEOGRAPHY
5 REPORT ASSUMPTIONS & CAVEATS
5.1 KEY CAVEATS
5.2 CURRENCY CONVERSION
5.3 MARKET DERIVATION
6 MARKET AT A GLANCE
7 PREMIUM INSIGHTS
7.1 KEY MARKET HIGHLIGHTS
7.2 KEY ENABLERS DRIVING THE MARKET
7.3 COMPETITIVE ANALYSIS
8 INTRODUCTION
8.1 KEY CONSIDERATIONS IN DATA CENTER CONSTRUCTION
8.2 DATA CENTER DESIGN CERTIFICATIONS
8.2.1 UPTIME INSTITUTE TIER STANDARDS
8.2.2 LEED CERTIFICATION
8.2.3 TIA 942 CERTIFICATION
8.2.4 ANSI/BICSI 002-2019 CERTIFICATION
8.3 DATA CENTER SITE SELECTION CRITERIA
8.3.1 KEY
9 MARKET OPPORTUNITIES & TRENDS
9.1 5G CONNECTIVITY AND EDGE DATA CENTER DEPLOYMENTS
9.2 DEPLOYMENT OF MICROGRIDS IN DATA CENTERS
9.3 SUSTAINABILITY INITIATIVES BY DATA CENTER OPERATORS
9.4 ADOPTION OF INNOVATIVE DATA CENTER TECHNOLOGIES
9.5 RISING ADOPTION OF DCIM
9.6 SUSTAINABLE DATA CENTER CONSTRUCTION TECHNIQUES
9.7 AVAILABILITY OF INNOVATIVE UPS BATTERY TECHNOLOGIES
10 MARKET GROWTH ENABLERS
10.1 CLOUD CONNECTIVITY DRIVING THE DEMAND FOR DATA CENTERS
10.2 IMPACT OF COVID-19
10.3 CONSTRUCTION OF MODULAR DATA CENTERS
10.4 IOT & BIG DATA
10.5 TAX INCENTIVES FOR DATA CENTER CONSTRUCTION
10.6 INCREASE IN HYPERSCALE DATA CENTER INVESTMENTS
10.7 INCREASING CONNECTIVITY NETWORK
10.8 RISE IN DATA CENTER EXPANSION INITIATIVES
10.9 RISING COLOCATION DATA CENTER INVESTMENTS
11 MARKET RESTRAINTS
11.1 INCREASE IN POWER AND WATER CONSUMPTION BY DATA CENTERS
11.2 LOCATION CONSTRAINTS ON DATA CENTER CONSTRUCTION
11.3 DEARTH OF SKILLED WORKFORCE
11.4 RISING CARBON EMISSIONS FROM DATA CENTERS
11.5 DATA CENTER SECURITY CHALLENGES
12 MARKET LANDSCAPE
12.1 MARKET OVERVIEW
12.2 INVESTMENT: MARKET SIZE & FORECAST
12.3 AREA: MARKET SIZE & FORECAST
12.4 POWER CAPACITY: MARKET SIZE & FORECAST
12.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
12.7 FIVE FORCES ANALYSIS
12.7.1 THREAT OF NEW ENTRANTS
12.7.2 BARGAINING POWER OF SUPPLIERS
12.7.3 BARGAINING POWER OF BUYERS
12.7.4 THREAT OF SUBSTITUTES
12.7.5 COMPETITIVE RIVALRY
13 FACILITY TYPE
13.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
13.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
13.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
13.4 COLOCATION DATA CENTER
13.4.1 MARKET OVERVIEW
13.4.2 INVESTMENT: MARKET SIZE & FORECAST
13.4.3 AREA: MARKET SIZE & FORECAST
13.4.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.5 HYPERSCALE DATA CENTER
13.5.1 MARKET OVERVIEW
13.5.2 INVESTMENT: MARKET SIZE & FORECAST
13.5.3 AREA: MARKET SIZE & FORECAST
13.5.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.6 ENTERPRISE DATA CENTER
13.6.1 MARKET OVERVIEW
13.6.2 INVESTMENT: MARKET SIZE & FORECAST
13.6.3 AREA: MARKET SIZE & FORECAST
13.6.4 POWER CAPACITY: MARKET SIZE & FORECAST
14 CONSTRUCTION TYPE
14.1 MARKET SNAPSHOT & GROWTH ENGINE
14.2 TRADITIONAL
14.2.1 MARKET OVERVIEW
14.2.2 MARKET SIZE & FORECAST
14.3 MODULAR
14.3.1 MARKET OVERVIEW
14.3.2 MARKET SIZE & FORECAST
15 INFRASTRUCTURE
15.1 MARKET SNAPSHOT & GROWTH ENGINE
15.2 MARKET OVERVIEW
15.3 ELECTRICAL INFRASTRUCTURE
15.3.1 MARKET OVERVIEW
15.3.2 MARKET SIZE & FORECAST
15.4 MECHANICAL INFRASTRUCTURE
15.4.1 MARKET OVERVIEW
15.4.2 MARKET SIZE & FORECAST
15.5 GENERAL CONSTRUCTION
15.5.1 MARKET OVERVIEW
15.5.2 MARKET SIZE & FORECAST
16 ELECTRICAL INFRASTRUCTURE
16.1 MARKET SNAPSHOT & GROWTH ENGINE
16.2 MARKET OVERVIEW
16.3 UPS SYSTEMS
16.3.1 MARKET OVERVIEW
16.3.2 MARKET SIZE & FORECAST
16.4 GENERATORS
16.4.1 MARKET OVERVIEW
16.4.2 MARKET SIZE & FORECAST
16.5 TRANSFER SWITCHES & SWITCHGEAR
16.5.1 MARKET OVERVIEW
16.5.2 MARKET SIZE & FORECAST
16.6 PDUS
16.6.1 MARKET OVERVIEW
16.6.2 MARKET SIZE & FORECAST
16.7 OTHER ELECTRICAL INFRASTRUCTURE
16.7.1 MARKET OVERVIEW
16.7.2 MARKET SIZE & FORECAST
17 MECHANICAL INFRASTRUCTURE
17.1 MARKET SNAPSHOT & GROWTH ENGINE
17.2 COOLING SYSTEMS
17.2.1 MARKET OVERVIEW
17.2.2 MARKET SIZE & FORECAST
17.3 RACKS
17.3.1 MARKET OVERVIEW
17.3.2 MARKET SIZE & FORECAST
17.4 OTHER MECHANICAL INFRASTRUCTURE
17.4.1 MARKET OVERVIEW
17.4.2 MARKET SIZE & FORECAST
18 COOLING SYSTEMS
18.1 MARKET SNAPSHOT & GROWTH ENGINE
18.2 CRAC & CRAH UNITS
18.2.1 MARKET OVERVIEW
18.2.2 MARKET SIZE & FORECAST
18.3 CHILLER UNITS
18.3.1 MARKET OVERVIEW
18.3.2 MARKET SIZE & FORECAST
18.4 COOLING TOWERS, CONDENSERS & DRY COOLERS
18.4.1 MARKET OVERVIEW
18.4.2 MARKET SIZE & FORECAST
18.5 ECONOMIZERS & EVAPORATIVE COOLERS
18.5.1 MARKET OVERVIEW
18.5.2 MARKET SIZE & FORECAST
18.6 OTHER COOLING UNITS
18.6.1 MARKET OVERVIEW
18.6.2 MARKET SIZE & FORECAST
19 COOLING TECHNIQUE
19.1 MARKET SNAPSHOT & GROWTH ENGINE
19.2 AIR-BASED COOLING
19.2.1 MARKET OVERVIEW
19.2.2 MARKET SIZE & FORECAST
19.3 LIQUID-BASED COOLING
19.3.1 MARKET OVERVIEW
19.3.2 MARKET SIZE & FORECAST
20 GENERAL CONSTRUCTION
20.1 MARKET SNAPSHOT & GROWTH ENGINE
20.2 CORE & SHELL DEVELOPMENT
20.2.1 MARKET OVERVIEW
20.2.2 MARKET SIZE & FORECAST
20.3 INSTALLATION & COMMISSIONING SERVICES
20.3.1 MARKET OVERVIEW
20.3.2 MARKET SIZE & FORECAST
20.4 ENGINEERING & BUILDING DESIGN
20.4.1 MARKET OVERVIEW
20.4.2 MARKET SIZE & FORECAST
20.5 PHYSICAL SECURITY
20.5.1 MARKET OVERVIEW
20.5.2 MARKET SIZE & FORECAST
20.6 FIRE DETECTION & SUPPRESSION
20.6.1 MARKET OVERVIEW
20.6.2 MARKET SIZE & FORECAST
20.7 DCIM/BMS SOLUTIONS
20.7.1 MARKET OVERVIEW
20.7.2 MARKET SIZE & FORECAST
21 TIER STANDARDS
21.1 MARKET SNAPSHOT & GROWTH ENGINE
21.2 OVERVIEW OF TIER STANDARDS
21.3 TIER I & II
21.3.1 MARKET OVERVIEW
21.3.2 MARKET SIZE & FORECAST
21.4 TIER III
21.4.1 MARKET OVERVIEW
21.4.2 MARKET SIZE & FORECAST
21.5 TIER IV
21.5.1 MARKET OVERVIEW
21.5.2 MARKET SIZE & FORECAST
22 GEOGRAPHY
22.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
22.1 AREA: MARKET SNAPSHOT & GROWTH ENGINE
22.2 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
23 WESTERN US
23.1 MARKET SNAPSHOT & GROWTH ENGINE
23.2 MARKET OVERVIEW
23.3 INVESTMENT: MARKET SIZE & FORECAST
23.3.1 DATA CENTER INVESTMENTS IN WESTERN US
23.4 AREA: MARKET SIZE & FORECAST
23.5 ELECTRICITY PRICING IN WESTERN US
23.6 POWER CAPACITY: MARKET SIZE & FORECAST
23.7 MARKET BY INFRASTRUCTURE
23.7.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
23.7.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
23.7.3 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
24 SOUTHEASTERN US
24.1 MARKET SNAPSHOT & GROWTH ENGINE
24.2 MARKET OVERVIEW
24.3 INVESTMENT: MARKET SIZE & FORECAST
24.3.1 DATA CENTER INVESTMENTS IN SOUTHEASTERN US
24.4 AREA: MARKET SIZE & FORECAST
24.5 ELECTRICITY PRICING
24.6 POWER CAPACITY: MARKET SIZE & FORECAST
24.7 MARKET BY INFRASTRUCTURE
24.7.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
24.7.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
24.7.3 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
25 MIDWESTERN US
25.1 MARKET SNAPSHOT & GROWTH ENGINE
25.2 MARKET OVERVIEW
25.3 INVESTMENT: MARKET SIZE & FORECAST
25.3.1 DATA CENTER INVESTMENTS IN MIDWESTERN US
25.4 AREA: MARKET SIZE & FORECAST
25.5 ELECTRICITY PRICING IN MIDWESTERN US
25.6 POWER CAPACITY: MARKET SIZE & FORECAST
25.7 MARKET BY INFRASTRUCTURE
25.7.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
25.7.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
25.7.3 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
26 SOUTHWESTERN US
26.1 MARKET SNAPSHOT & GROWTH ENGINE
26.2 MARKET OVERVIEW
26.3 INVESTMENT: MARKET SIZE & FORECAST
26.3.1 DATA CENTER INVESTMENTS IN SOUTHWESTERN US
26.4 AREA: MARKET SIZE & FORECAST
26.5 ELECTRICITY PRICING IN SOUTHWESTERN US
26.6 POWER CAPACITY: MARKET SIZE & FORECAST
26.7 MARKET BY INFRASTRUCTURE
26.7.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
26.7.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
26.7.3 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
27 NORTHEASTERN US
27.1 MARKET SNAPSHOT & GROWTH ENGINE
27.2 MARKET OVERVIEW
27.3 INVESTMENT: MARKET SIZE & FORECAST
27.3.1 DATA CENTER INVESTMENTS IN NORTHEASTERN US
27.4 AREA: MARKET SIZE & FORECAST
27.5 ELECTRICITY PRICING IN NORTHEASTERN US
27.6 POWER CAPACITY: MARKET SIZE & FORECAST
27.7 MARKET BY INFRASTRUCTURE
27.7.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
27.7.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
27.7.3 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
28 COMPETITIVE LANDSCAPE
28.1 ELECTRICAL INFRASTRUCTURE
28.2 MECHANICAL INFRASTRUCTURE
28.3 GENERAL CONSTRUCTION
28.4 DATA CENTER INVESTORS
29 KEY DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
29.1 ABB
29.1.1 BUSINESS OVERVIEW
29.1.2 PRODUCT OFFERINGS
29.2 CATERPILLAR
29.2.1 BUSINESS OVERVIEW
29.2.2 PRODUCT OFFERINGS
29.3 CUMMINS
29.3.1 BUSINESS OVERVIEW
29.3.2 PRODUCT OFFERINGS
29.4 DELTA ELECTRONICS
29.4.1 BUSINESS OVERVIEW
29.4.2 PRODUCT OFFERINGS
29.5 EATON
29.5.1 BUSINESS OVERVIEW
29.5.2 PRODUCT OFFERINGS
29.6 LEGRAND
29.6.1 BUSINESS OVERVIEW
29.6.2 PRODUCT OFFERINGS
29.7 ROLLS-ROYCE
29.7.1 BUSINESS OVERVIEW
29.7.2 PRODUCT OFFERINGS
29.8 SCHNEIDER ELECTRIC
29.8.1 BUSINESS OVERVIEW
29.8.2 PRODUCT OFFERINGS
29.8.3 KEY NEWS
29.9 STULZ
29.9.1 BUSINESS OVERVIEW
29.9.2 PRODUCT OFFERINGS
29.10 VERTIV
29.10.1 BUSINESS OVERVIEW
29.10.2 PRODUCT OFFERINGS
30 KEY DATA CENTER CONTRACTORS
30.1 AECOM
30.1.1 BUSINESS OVERVIEW
30.1.2 SERVICE OFFERINGS
30.2 ARUP
30.2.1 BUSINESS OVERVIEW
30.2.2 SERVICE OFFERINGS
30.3 BLACK & VEATCH
30.3.1 BUSINESS OVERVIEW
30.3.2 SERVICE OFFERINGS
30.4 CORGAN
30.4.1 BUSINESS OVERVIEW
30.4.2 SERVICE OFFERINGS
30.5 DPR CONSTRUCTION
30.5.1 BUSINESS OVERVIEW
30.5.2 SERVICE OFFERINGS
30.6 FORTIS CONSTRUCTION
30.6.1 BUSINESS OVERVIEW
30.6.2 SERVICES OFFERINGS
30.7 HED
30.7.1 BUSINESS OVERVIEW
30.7.2 SERVICES OFFERINGS
30.8 HOLDER CONSTRUCTION
30.8.1 BUSINESS OVERVIEW
30.8.2 SERVICE OFFERINGS
30.9 JACOBS
30.9.1 BUSINESS OVERVIEW
30.9.2 SERVICE OFFERINGS
30.10 ROGERS-OBRIEN CONSTRUCTION
30.10.1 BUSINESS OVERVIEW
30.10.2 SERVICE OFFERINGS
30.11 SYSKA HENNESSY GROUP
30.11.1 BUSINESS OVERVIEW
30.11.2 SERVICE OFFERINGS
30.12 TURNER CONSTRUCTION
30.12.1 BUSINESS OVERVIEW
30.12.2 SERVICE OFFERINGS
31 KEY DATA CENTER INVESTORS
31.1 APPLE
31.1.1 BUSINESS OVERVIEW
31.1.2 SERVICE OFFERINGS
31.1.3 KEY NEWS
31.2 AMAZON WEB SERVICES (AWS)
31.2.1 BUSINESS OVERVIEW
31.2.2 SERVICE OFFERINGS
31.2.3 KEY NEWS
31.3 CYRUSONE
31.3.1 BUSINESS OVERVIEW
31.3.2 SERVICE OFFERINGS
31.3.3 KEY NEWS
31.4 DATABANK
31.4.1 BUSINESS OVERVIEW
31.4.2 SERVICE OFFERINGS
31.4.3 KEY NEWS
31.5 DIGITAL REALTY
31.5.1 BUSINESS OVERVIEW
31.5.2 SERVICE OFFERINGS
31.5.3 KEY NEWS
31.6 EQUINIX
31.6.1 BUSINESS OVERVIEW
31.6.2 SERVICE OFFERINGS
31.6.3 KEY NEWS
31.7 FACEBOOK (META)
31.7.1 BUSINESS OVERVIEW
31.7.2 SERVICE OFFERINGS
31.7.3 KEY NEWS
31.8 GOOGLE
31.8.1 BUSINESS OVERVIEW
31.8.2 SERVICE OFFERINGS
31.8.3 KEY NEWS
31.9 MICROSOFT
31.9.1 BUSINESS OVERVIEW
31.9.2 SERVICE OFFERINGS
31.9.3 KEY NEWS
31.10 NTT GLOBAL DATA CENTERS
31.10.1 BUSINESS OVERVIEW
31.10.2 SERVICE OFFERINGS
31.10.3 KEY NEWS
32 OTHER PROMINENT SUPPORT INFRASTRUCTURE PROVIDERS
32.1 AIREDALE INTERNATIONAL AIR CONDITIONING
32.1.1 BUSINESS OVERVIEW
32.1.2 PRODUCT OFFERINGS
32.2 ALFA LAVAL
32.2.1 BUSINESS OVERVIEW
32.2.2 PRODUCT OFFERINGS
32.3 ASETEK
32.3.1 BUSINESS OVERVIEW
32.3.2 PRODUCT OFFERINGS
32.4 BLOOM ENERGY
32.4.1 BUSINESS OVERVIEW
32.4.2 PRODUCT OFFERINGS
32.5 CARRIER
32.5.1 BUSINESS OVERVIEW
32.5.2 PRODUCT OFFERINGS
32.6 CONDAIR
32.6.1 BUSINESS OVERVIEW
32.6.2 PRODUCT OFFERINGS
32.7 CORMANT
32.7.1 BUSINESS OVERVIEW
32.7.2 PRODUCT OFFERINGS
32.8 CYBER POWER SYSTEMS
32.8.1 BUSINESS OVERVIEW
32.8.2 PRODUCT OFFERINGS
32.9 DATA AIRE
32.9.1 BUSINESS OVERVIEW
32.9.2 PRODUCT OFFERINGS
32.10 ENLOGIC
32.10.1 BUSINESS OVERVIEW
32.10.2 PRODUCT OFFERINGS
32.11 FNT SOFTWARE
32.11.1 BUSINESS OVERVIEW
32.11.2 PRODUCT OFFERINGS
32.12 GENERAC POWER SYSTEMS
32.12.1 BUSINESS OVERVIEW
32.12.2 PRODUCT OFFERINGS
32.13 GREEN REVOLUTION COOLING (GRC)
32.13.1 BUSINESS OVERVIEW
32.13.2 PRODUCT OFFERINGS
32.14 HITEC POWER PROTECTION
32.14.1 BUSINESS OVERVIEW
32.14.2 PRODUCT OFFERINGS
32.15 JOHNSON CONTROLS
32.15.1 BUSINESS OVERVIEW
32.15.2 PRODUCT OFFERINGS
32.16 KOHLER
32.16.1 BUSINESS OVERVIEW
32.16.2 PRODUCT OFFERINGS
32.17 KYOTOCOOLING
32.17.1 BUSINESS OVERVIEW
32.17.2 PRODUCT OFFERINGS
32.18 MITSUBISHI ELECTRIC
32.18.1 BUSINESS OVERVIEW
32.18.2 PRODUCT OFFERINGS
32.19 NATRON ENERGY
32.19.1 BUSINESS OVERVIEW
32.19.2 PRODUCT OFFERINGS
32.20 NETZOOM
32.20.1 BUSINESS OVERVIEW
32.20.2 PRODUCT OFFERINGS
32.21 NLYTE SOFTWARE (CARRIER)
32.21.1 BUSINESS OVERVIEW
32.21.2 PRODUCT OFFERINGS
32.22 RITTAL
32.22.1 BUSINESS OVERVIEW
32.22.2 PRODUCT OFFERINGS
32.23 SIEMENS
32.23.1 BUSINESS OVERVIEW
32.23.2 PRODUCT OFFERINGS
32.24 TRANE (INGERSOLL RAND)
32.24.1 BUSINESS OVERVIEW
32.24.2 PRODUCT OFFERINGS
32.25 TRIPP LITE
32.25.1 BUSINESS OVERVIEW
32.25.2 PRODUCT OFFERINGS
32.26 YANMAR (HIMOINSA)
32.26.1 BUSINESS OVERVIEW
32.26.2 PRODUCT OFFERINGS
32.27 ZINCFIVE
32.27.1 BUSINESS OVERVIEW
32.27.2 PRODUCT OFFERINGS
33 OTHER PROMINENT CONSTRUCTION CONTRACTORS
33.1 ALFATECH
33.1.1 BUSINESS OVERVIEW
33.1.2 SERVICE OFFERINGS
33.2 BLUESCOPE CONSTRUCTION
33.2.1 BUSINESS OVERVIEW
33.2.2 SERVICE OFFERINGS
33.3 BURNS & MCDONNELL
33.3.1 BUSINESS OVERVIEW
33.3.2 SERVICE OFFERINGS
33.4 CALLISONRTKL
33.4.1 BUSINESS OVERVIEW
33.4.2 SERVICE OFFERINGS
33.5 CLUNE CONSTRUCTION
33.5.1 BUSINESS OVERVIEW
33.5.2 SERVICE OFFERINGS
33.6 EMCOR GROUP
33.6.1 BUSINESS OVERVIEW
33.6.2 SERVICE OFFERINGS
33.7 EYP MCF
33.7.1 BUSINESS OVERVIEW
33.7.2 SERVICE OFFERINGS
33.8 GENSLER
33.8.1 BUSINESS OVERVIEW
33.8.2 SERVICE OFFERINGS
33.9 FLUOR CORPORATION
33.9.1 BUSINESS OVERVIEW
33.9.2 SERVICE OFFERINGS
33.10 GILBANE BUILDING COMPANY
33.10.1 BUSINESS OVERVIEW
33.10.2 SERVICE OFFERINGS
33.11 HDR
33.11.1 BUSINESS OVERVIEW
33.11.2 SERVICE OFFERINGS
33.12 HITT CONTRACTING
33.12.1 BUSINESS OVERVIEW
33.12.2 SERVICE OFFERINGS
33.13 HOFFMAN CONSTRUCTION
33.13.1 BUSINESS OVERVIEW
33.13.2 SERVICE OFFERINGS
33.14 JE DUNN CONSTRUCTION
33.14.1 BUSINESS OVERVIEW
33.14.2 SERVICE OFFERINGS
33.15 LINESIGHT
33.15.1 BUSINESS OVERVIEW
33.15.2 SERVICE OFFERINGS
33.16 M+W GROUP (EXYTE)
33.16.1 BUSINESS OVERVIEW
33.16.2 SERVICE OFFERINGS
33.17 MORRISON HERSHFIELD
33.17.1 BUSINESS OVERVIEW
33.17.2 SERVICE OFFERINGS
33.18 MORTENSON
33.18.1 BUSINESS OVERVIEW
33.18.2 SERVICE OFFERINGS
33.19 SHEEHAN NAGLE HARTRAY ARCHITECTS
33.19.1 BUSINESS OVERVIEW
33.19.2 SERVICE OFFERINGS
33.20 STRUCTURE TONE
33.20.1 BUSINESS OVERVIEW
33.20.2 SERVICE OFFERINGS
33.21 THE MULHERN GROUP
33.21.1 BUSINESS OVERVIEW
33.21.2 SERVICE OFFERINGS
33.22 THE WALSH GROUP
33.22.1 BUSINESS OVERVIEW
33.22.2 SERVICE OFFERINGS
33.23 THE WEITZ COMPANY
33.23.1 BUSINESS OVERVIEW
33.23.2 SERVICE OFFERINGS
33.24 TINDALL
33.24.1 BUSINESS OVERVIEW
33.24.2 SERVICE OFFERINGS
34 OTHER PROMINENT DATA CENTER INVESTORS
34.1 ALIGNED DATA CENTERS
34.1.1 BUSINESS OVERVIEW
34.1.2 SERVICE OFFERINGS
34.1.3 KEY NEWS
34.2 AMERICAN TOWER
34.2.1 BUSINESS OVERVIEW
34.2.2 SERVICE OFFERINGS
34.2.3 KEY NEWS
34.3 CLOUDHQ
34.3.1 BUSINESS OVERVIEW
34.3.2 SERVICE OFFERINGS
34.4 COLOGIX
34.4.1 BUSINESS OVERVIEW
34.4.2 SERVICE OFFERINGS
34.4.3 KEY NEWS
34.5 COMPASS DATACENTERS
34.5.1 BUSINESS OVERVIEW
34.5.2 SERVICE OFFERINGS
34.6 COPT DATA CENTER SOLUTIONS
34.6.1 BUSINESS OVERVIEW
34.6.2 SERVICE OFFERINGS
34.6.3 KEY NEWS
34.7 CORESITE REALTY
34.7.1 BUSINESS OVERVIEW
34.7.2 SERVICE OFFERINGS
34.7.3 KEY NEWS
34.8 CYXTERA TECHNOLOGIES
34.8.1 BUSINESS OVERVIEW
34.8.2 SERVICE OFFERINGS
34.8.3 KEY NEWS
34.9 DARTPOINTS
34.9.1 BUSINESS OVERVIEW
34.9.2 SERVICE OFFERINGS
34.10 DC BLOX
34.10.1 BUSINESS OVERVIEW
34.10.2 SERVICE OFFERINGS
34.10.3 KEY NEWS
34.11 EDGECORE INTERNET REAL ESTATE
34.11.1 BUSINESS OVERVIEW
34.11.2 SERVICE OFFERINGS
34.12 EDGECONNEX
34.12.1 BUSINESS OVERVIEW
34.12.2 SERVICE OFFERINGS
34.12.3 KEY NEWS
34.13 EDGEPRESENCE
34.13.1 BUSINESS OVERVIEW
34.13.2 SERVICE OFFERINGS
34.14 ELEMENT CRITICAL
34.14.1 BUSINESS OVERVIEW
34.14.2 SERVICE OFFERINGS
34.14.3 KEY NEWS
34.15 FLEXENTIAL
34.15.1 BUSINESS OVERVIEW
34.15.2 SERVICE OFFERINGS
34.15.3 KEY NEWS
34.16 FIFTEENFORTYSEVEN CRITICAL SYSTEMS REALTY
34.16.1 BUSINESS OVERVIEW
34.16.2 SERVICE OFFERINGS
34.16.3 KEY NEWS
34.17 GIGA DATA CENTERS
34.17.1 BUSINESS OVERVIEW
34.17.2 SERVICE OFFERINGS
34.18 HOSTDIME
34.18.1 BUSINESS OVERVIEW
34.18.2 SERVICE OFFERINGS
34.18.3 KEY NEWS
34.19 IRON MOUNTAIN
34.19.1 BUSINESS OVERVIEW
34.19.2 SERVICE OFFERINGS
34.19.3 KEY NEWS
34.20 PRIME DATA CENTERS
34.20.1 BUSINESS OVERVIEW
34.20.2 SERVICE OFFERINGS
34.20.3 KEY NEWS
34.21 QTS REALTY TRUST
34.21.1 BUSINESS OVERVIEW
34.21.2 SERVICE OFFERINGS
34.21.3 KEY NEWS
34.22 SABEY DATA CENTER
34.22.1 BUSINESS OVERVIEW
34.22.2 SERVICE OFFERINGS
34.23 SKYBOX DATACENTERS
34.23.1 BUSINESS OVERVIEW
34.23.2 SERVICE OFFERINGS
34.23.3 KEY NEWS
34.24 STREAM DATA CENTERS
34.24.1 BUSINESS OVERVIEW
34.24.2 SERVICE OFFERINGS
34.25 STACK INFRASTRUCTURE
34.25.1 BUSINESS OVERVIEW
34.25.2 SERVICE OFFERINGS
34.25.3 KEY NEWS
34.26 SWITCH
34.26.1 BUSINESS OVERVIEW
34.26.2 SERVICE OFFERINGS
34.26.3 KEY NEWS
34.27 T5 DATA CENTERS
34.27.1 BUSINESS OVERVIEW
34.27.2 SERVICE OFFERINGS
34.28 VANTAGE DATA CENTERS
34.28.1 BUSINESS OVERVIEW
34.28.2 SERVICE OFFERINGS
34.28.3 KEY NEWS
34.29 VAPOR IO
34.29.1 BUSINESS OVERVIEW
34.29.2 SERVICE OFFERINGS
35 NEW ENTRANTS
35.1 AUBIX
35.1.1 BUSINESS OVERVIEW
35.1.2 SERVICE OFFERINGS
35.1.3 KEY NEWS
35.2 CIRRUS DATA SOLUTIONS
35.2.1 BUSINESS OVERVIEW
35.2.2 SERVICE OFFERINGS
35.3 DASTOR
35.3.1 BUSINESS OVERVIEW
35.3.2 SERVICE OFFERINGS
35.4 EDGEX DATA CENTERS
35.4.1 BUSINESS OVERVIEW
35.4.2 SERVICE OFFERINGS
35.5 NOVVA
35.5.1 BUSINESS OVERVIEW
35.5.2 SERVICE OFFERINGS
35.5.3 KEY NEWS
35.6 POINTONE
35.6.1 BUSINESS OVERVIEW
35.6.2 SERVICE OFFERINGS
35.7 QUANTUM LOOPHOLE
35.7.1 BUSINESS OVERVIEW
35.7.2 SERVICE OFFERINGS
35.8 YONDR
35.8.1 BUSINESS OVERVIEW
35.8.2 SERVICE OFFERINGS
35.8.3 KEY NEWS
36 REPORT SUMMARY
36.1 KEY TAKEAWAYS
37 QUANTITATIVE SUMMARY
37.1 US DATA CENTER CONSTRUCTION MARKET
37.1.1 INVESTMENT: MARKET SIZE & FORECAST
37.1.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
37.1.3 CONSTRUCTION TYPE: MARKET SIZE & FORECAST
37.1.4 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
37.1.5 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
37.1.6 COOLING SYSTEMS: MARKET SIZE & FORECAST
37.1.7 COOLING TECHNIQUES: MARKET SIZE & FORECAST
37.1.8 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
37.1.9 TIER STANDARDS: MARKET SIZE & FORECAST
37.1.10 FACILITY TYPE: MARKET SIZE & FORECAST BY INVESTMENT
37.1.11 FACILITY TYPE: MARKET SIZE & FORECAST BY AREA
37.1.12 FACILITY TYPE: MARKET SIZE & FORECAST BY POWER CAPACITY
37.2 GEOGRAPHICAL SEGMENTATION
37.2.1 INVESTMENT: MARKET SIZE & FORECAST
37.2.2 AREA: MARKET SIZE & FORECAST
37.2.3 POWER CAPACITY: MARKET SIZE & FORECAST
37.3 WESTERN US
37.3.1 INVESTMENT: MARKET SIZE & FORECAST
37.3.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
37.4 SOUTHEASTERN US
37.4.1 INVESTMENT: MARKET SIZE & FORECAST
37.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
37.5 MIDWESTERN US
37.5.1 INVESTMENT: MARKET SIZE & FORECAST
37.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
37.6 SOUTHWESTERN US
37.6.1 INVESTMENT: MARKET SIZE & FORECAST
37.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
37.7 NORTHEASTERN US
37.7.1 INVESTMENT: MARKET SIZE & FORECAST
37.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
38 APPENDIX
38.1 ABBREVIATIONS
LIST OF EXHIBITS
EXHIBIT 1 SEGMENTATION OF US DATA CENTER CONSTRUCTION MARKET
EXHIBIT 2 MARKET SIZE CALCULATION APPROACH 2021
EXHIBIT 3 DATA CENTER INVESTMENT FLOW CHART
EXHIBIT 4 US DATA CENTER CONSTRUCTION MARKET OPPORTUNITIES
EXHIBIT 5 DATA CENTER SITE SELECTION CRITERIA
EXHIBIT 6 IMPACT OF 5G CONNECTIVITY AND EDGE DATA CENTER DEPLOYMENTS
EXHIBIT 7 TYPES OF EDGE DATA CENTERS AND THEIR DEPLOYMENT
EXHIBIT 8 IMPACT OF DEPLOYMENT OF MICROGRIDS IN DATA CENTERS
EXHIBIT 9 TYPES OF SUB-STATIONS
EXHIBIT 10 STRUCTURE OF A MICROGRID
EXHIBIT 11 IMPACT OF SUSTAINABILITY INITIATIVES BY DATA CENTER OPERATORS
EXHIBIT 12 IMPACT OF ADOPTION OF INNOVATIVE DATA CENTER TECHNOLOGIES
EXHIBIT 13 GLOBAL RACK POWER DENSITY ADOPTION IN 2021
EXHIBIT 14 IMPACT OF RISING ADOPTION OF DCIM
EXHIBIT 15 ADVANTAGES OF SOFTWARE DEFINED SYSTEMS TO MONITOR INFRASTRUCTURE
EXHIBIT 16 IMPACT OF SUSTAINABLE DATA CENTER CONSTRUCTION TECHNIQUES
EXHIBIT 17 IMPACT OF AVAILABILITY OF INNOVATIVE UPS BATTERY TECHNOLOGIES
EXHIBIT 18 TCO: VRLA VS. LITHIUM-ION & NICKEL ZINC
EXHIBIT 19 IMPACT OF CLOUD CONNECTIVITY DRIVING THE DEMAND FOR DATA CENTERS
EXHIBIT 20 HYBRID CLOUD STRUCTURE
EXHIBIT 21 CLOUD REGIONS ACROSS THE US (2021)
EXHIBIT 22 LIST OF CLOUD ON-RAMP SERVICE PROVIDERS AND THEIR SERVICES
EXHIBIT 23 IMPACT OF COVID-19
EXHIBIT 24 DATA CENTER CONSTRUCTION COST 2020 & 2021 ($/WATT)
EXHIBIT 25 IMPACT OF CONSTRUCTION OF MODULAR DATA CENTERS
EXHIBIT 26 DRIVERS OF MODULAR DATA CENTERS
EXHIBIT 27 IMPACT OF IOT & BIG DATA
EXHIBIT 28 USE CASES FOR BIG DATA AND IOT ACROSS INDUSTRIES
EXHIBIT 29 IMPACT OF TAX INCENTIVES FOR DATA CENTER CONSTRUCTION
EXHIBIT 30 IMPACT OF INCREASE IN HYPERSCALE DATA CENTER INVESTMENTS
EXHIBIT 31 HYPERSCALE INVESTMENT IN US DATA CENTER CONSTRUCTION MARKET 2021 (NUMBER OF PROJECTS)
EXHIBIT 32 IMPACT OF INCREASING CONNECTIVITY NETWORK
EXHIBIT 33 IMPACT OF RISE IN DATA CENTER EXPANSION INITIATIVES
EXHIBIT 34 IMPACT OF RISING COLOCATION DATA CENTER INVESTMENTS
EXHIBIT 35 TOTAL DATA CENTER INVESTMENT IN US REGIONS 2021 (NUMBER OF PROJECTS)
EXHIBIT 36 IMPACT OF INCREASE IN POWER AND WATER CONSUMPTION BY DATA CENTERS
EXHIBIT 37 IMPACT OF LOCATION CONSTRAINTS ON DATA CENTER CONSTRUCTION
EXHIBIT 38 IMPACT OF DEARTH OF SKILLED WORKFORCE
EXHIBIT 39 IMPACT OF RISING CARBON EMISSIONS FROM DATA CENTERS
EXHIBIT 40 IMPACT OF DATA CENTER SECURITY CHALLENGES
EXHIBIT 41 US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 42 US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 43 US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 44 US DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2021-2027 ($ BILLION)
EXHIBIT 45 FIVE FORCES ANALYSIS 2021
EXHIBIT 46 INCREMENTAL GROWTH BY FACILITY TYPE 2021 & 2027
EXHIBIT 47 INCREMENTAL GROWTH BY FACILITY TYPE BY AREA 2021 & 2027
EXHIBIT 48 INCREMENTAL GROWTH BY FACILITY TYPE BY POWER CAPACITY 2021 & 2027
EXHIBIT 49 US COLOCATION DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 50 US COLOCATION DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 51 US COLOCATION DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 52 US HYPERSCALE DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 53 US HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 54 US HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 55 US ENTERPRISE DATA CENTER CONSTRUCTION MARKET 2021?2027 ($ BILLION)
EXHIBIT 56 US ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 57 US ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 58 INCREMENTAL GROWTH BY CONSTRUCTION TYPE 2021 & 2027
EXHIBIT 59 US DATA CENTER TRADITIONAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 60 US DATA CENTER MODULAR CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 61 INCREMENTAL GROWTH BY INFRASTRUCTURE 2021 & 2027
EXHIBIT 62 DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
EXHIBIT 63 US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 64 DATA CENTER ELECTRICAL INFRASTRUCTURE OVERVIEW 2021
EXHIBIT 65 US DATA CENTER CONSTRUCTION UPS SYSTEMS MARKET 2021-2027 ($ BILLION)
EXHIBIT 66 US DATA CENTER CONSTRUCTION GENERATORS MARKET 2021-2027 ($ BILLION)
EXHIBIT 67 US DATA CENTER CONSTRUCTION TRANSFER SWITCHES & SWITCHGEAR MARKET 2021-2027 ($ BILLION)
EXHIBIT 68 US DATA CENTER CONSTRUCTION PDUS MARKET 2021-2027 ($ BILLION)
EXHIBIT 69 US DATA CENTER CONSTRUCTION OTHER ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 70 INCREMENTAL GROWTH BY MECHANICAL INFRASTRUCTURE 2021 & 2027
EXHIBIT 71 US DATA CENTER CONSTRUCTION COOLING SYSTEMS MARKET 2021-2027 ($ BILLION)
EXHIBIT 72 US DATA CENTER CONSTRUCTION RACKS MARKET 2021-2027 ($ BILLION)
EXHIBIT 73 US DATA CENTER CONSTRUCTION OTHER MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 74 INCREMENTAL GROWTH BY COOLING SYSTEMS 2021-2027
EXHIBIT 75 US DATA CENTER CONSTRUCTION CRAC & CRAH UNITS MARKET 2021-2027 ($ BILLION)
EXHIBIT 76 US DATA CENTER CONSTRUCTION CHILLER UNITS MARKET 2021-2027 ($ BILLION)
EXHIBIT 77 US DATA CENTER CONSTRUCTION COOLING TOWERS, CONDENSERS & DRY COOLERS MARKET 2021-2027 ($ BILLION)
EXHIBIT 78 US DATA CENTER CONSTRUCTION ECONOMIZERS & EVAPORATIVE COOLERS MARKET 2021-2027 ($ BILLION)
EXHIBIT 79 US DATA CENTER CONSTRUCTION OTHER COOLING UNITS MARKET 2021-2027 ($ BILLION)
EXHIBIT 80 INCREMENTAL GROWTH BY COOLING TECHNIQUE 2021 & 2027
EXHIBIT 81 US DATA CENTER CONSTRUCTION AIR-BASED COOLING MARKET 2021-2027 ($ BILLION)
EXHIBIT 82 US DATA CENTER CONSTRUCTION LIQUID-BASED COOLING MARKET 2021-2027 ($ BILLION)
EXHIBIT 83 INCREMENTAL GROWTH BY GENERAL CONSTRUCTION 2021 & 2027
EXHIBIT 84 US DATA CENTER CONSTRUCTION CORE & SHELL DEVELOPMENT MARKET 2021-2027 ($ BILLION)
EXHIBIT 85 US DATA CENTER CONSTRUCTION INSTALLATION & COMMISSIONING SERVICES MARKET 2021-2027 ($ BILLION)
EXHIBIT 86 US DATA CENTER CONSTRUCTION ENGINEERING & BUILDING DESIGN MARKET 2021-2027 ($ BILLION)
EXHIBIT 87 US DATA CENTER CONSTRUCTION PHYSICAL SECURITY MARKET 2021-2027 ($ BILLION)
EXHIBIT 88 US DATA CENTER CONSTRUCTION FIRE DETECTION & SUPPRESSION MARKET 2021-2027 ($ BILLION)
EXHIBIT 89 US DATA CENTER CONSTRUCTION DCIM/BMS SOLUTIONS MARKET 2021-2027 ($ BILLION)
EXHIBIT 90 INCREMENTAL GROWTH BY TIER STANDARDS 2021 & 2027
EXHIBIT 91 OVERVIEW OF TIER STANDARDS
EXHIBIT 92 US TIER I & TIER II DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 93 US TIER III DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 94 US TIER IV DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 95 INCREMENTAL GROWTH BY REGION 2021 & 2027
EXHIBIT 96 INCREMENTAL GROWTH BY AREA 2021 & 2027
EXHIBIT 97 INCREMENTAL GROWTH BY POWER CAPACITY 2021 & 2027
EXHIBIT 98 WESTERN US: MARKET SNAPSHOT & GROWTH ENGINE
EXHIBIT 99 WESTERN US DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 100 WESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 101 WESTERN US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 102 ELECTRICITY PRICING IN WESTERN US 2020 & 2021 (CENTS/KW)
EXHIBIT 103 WESTERN US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 104 WESTERN US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 105 WESTERN US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 106 WESTERN US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 107 SOUTHEASTERN US: MARKET SNAPSHOT & GROWTH ENGINE
EXHIBIT 108 OVERVIEW: SOUTHEASTERN US DATA CENTER MARKET
EXHIBIT 109 SOUTHEASTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 110 SOUTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 111 ELECTRICITY PRICING IN SOUTHEASTERN US 2021 (CENTS/KW)
EXHIBIT 112 SOUTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 113 SOUTHEASTERN US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 114 SOUTHEASTERN US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 115 SOUTHEASTERN US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 116 MIDWESTERN US: MARKET SNAPSHOT & GROWTH ENGINE
EXHIBIT 117 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 118 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 119 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 120 ELECTRICITY PRICING IN MIDWESTERN US 2020 & 2021 (CENTS/KW)
EXHIBIT 121 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 122 MIDWESTERN US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 123 MIDWESTERN US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 124 MIDWESTERN US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 125 SOUTHWESTERN US: MARKET SNAPSHOT & GROWTH ENGINE
EXHIBIT 126 SOUTHWESTERN US DATA CENTER MARKET OVERVIEW
EXHIBIT 127 SOUTHWESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 128 SOUTHWESTERN US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 129 ELECTRICITY PRICING IN SOUTHWESTERN US 2020 & 2021 (CENTS/KW)
EXHIBIT 130 SOUTHWESTERN US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 131 SOUTHWESTERN US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 132 SOUTHWESTERN US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 133 SOUTHWESTERN US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 134 NORTHEASTERN US: MARKET SNAPSHOT & GROWTH ENGINE
EXHIBIT 135 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 136 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027 ($ BILLION)
EXHIBIT 137 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
EXHIBIT 138 ELECTRICITY PRICING IN NORTHEASTERN US 2020 & 2021 (CENTS PER KW)
EXHIBIT 139 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
EXHIBIT 140 NORTHEASTERN US DATA CENTER CONSTRUCTION ELECTRICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 141 NORTHEASTERN US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
EXHIBIT 142 NORTHEASTERN US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
LIST OF TABLES
TABLE 1 KEY CAVEATS
TABLE 2 CURRENCY CONVERSION 2015?2021
TABLE 3 IMPACT OF COVID-19 ON THE US DATA CENTER MARKET
TABLE 4 LIST OF SUBMARINE FIBER CABLE PROJECTS
TABLE 5 LIST OF INTERNET EXCHANGE POINTS
TABLE 6 DATA CENTER MERGERS & ACQUISITIONS IN THE US (2021)
TABLE 7 DATA CENTER JOINT VENTURES IN THE US (2021)
TABLE 8 US DATA CENTER CONSTRUCTION MECHANICAL INFRASTRUCTURE MARKET 2021-2027 ($ BILLION)
TABLE 9 US DATA CENTER GENERAL CONSTRUCTION MARKET 2021-2027 ($ BILLION)
TABLE 10 INCREMENTAL GROWTH BY ELECTRICAL INFRASTRUCTURE 2021 & 2027
TABLE 11 DATA CENTER INVESTMENTS IN WESTERN US 2021
TABLE 12 LAND ACQUISITION
TABLE 13 RENEWABLE ENERGY INVESTMENTS BY DATA CENTER PROVIDERS
TABLE 14 DATA CENTER INVESTMENTS IN SOUTHEASTERN US 2021
TABLE 15 LAND ACQUISITIONS (2021)
TABLE 16 RENEWABLE ENERGY INVESTMENTS BY DATA CENTER PROVIDERS
TABLE 17 DATA CENTER INVESTMENTS IN MIDWESTERN US 2021
TABLE 18 LAND ACQUISITION
TABLE 19 RENEWABLE ENERGY INVESTMENTS BY DATA CENTER PROVIDERS
TABLE 20 DATA CENTER INVESTMENTS IN SOUTHWESTERN US 2021
TABLE 21 LAND ACQUISITIONS (2021)
TABLE 22 RENEWABLE ENERGY INVESTMENTS BY DATA CENTER PROVIDERS
TABLE 23 DATA CENTER INVESTMENTS IN NORTHEASTERN US (2021-2027)
TABLE 24 LAND ACQUISITIONS
TABLE 25 RENEWABLE ENERGY INVESTMENTS BY DATA CENTER PROVIDERS
TABLE 26 US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 27 US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 28 US DATA CENTER CONSTRUCTION MARKET BY CONSTRUCTION TYPE 2021-2027 ($ BILLION)
TABLE 29 US DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 30 US DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 31 US DATA CENTER CONSTRUCTION MARKET BY COOLING SYSTEMS 2021-2027 ($ BILLION)
TABLE 32 US DATA CENTER CONSTRUCTION MARKET BY COOLING TECHNIQUES 2021-2027 ($ BILLION)
TABLE 33 US DATA CENTER CONSTRUCTION MARKET BY GENERAL CONSTRUCTION 2021-2027 ($ BILLION)
TABLE 34 US DATA CENTER CONSTRUCTION MARKET BY TIER STANDARDS 2021-2027 ($ BILLION)
TABLE 35 US DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE 2021-2027 ($ BILLION)
TABLE 36 US DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE BY AREA 2021-2027 (MILLION SQUARE FEET)
TABLE 37 US DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE BY POWER CAPACITY 2021-2027 (MW)
TABLE 38 US DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2021-2027 ($ BILLION)
TABLE 39 US DATA CENTER CONSTRUCTION MARKET BY AREA 2021-2027 (MILLION SQUARE FEET)
TABLE 40 US DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2021-2027 (MW)
TABLE 41 WESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 42 WESTERN US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 43 SOUTHEASTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 44 SOUTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 45 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 46 MIDWESTERN US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 47 SOUTHWESTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 48 SOUTHWESTERN US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
TABLE 49 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET 2021-2027
TABLE 50 NORTHEASTERN US DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2021-2027 ($ BILLION)
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.