Southeast Asia Data Center Construction Market - Industry Outlook & Forecast 2023-2028

Market Report I 2023-02-02 I 337 Pages I Arizton Advisory & Intelligence

The Southeast Asia data center construction market is expected to grow at a CAGR of 1.48% during 2022-2028

The market has grown significantly, with a major contribution from countries such as Indonesia, Malaysia, and Thailand. In 2022, the moratorium on data center construction in Singapore was lifted, with the pilot phase relating to sustainable data center development currently underway. Once this phase is deemed successful, it will result in strong growth in Singapore from 2024. The Southeast Asia data center construction market also is witnessing several telecom operators' investments to establish edge data center facilities. For instance, DITO Telecommunity, a new entrant in the Philippines telecom space, deployed edge data centers in Iloilo, Roxas, Bulua, Baler, and Ibajay Aklan.

KEY HIGHLIGHTS

- The Southeast Asia data center construction market is expected to witness a negative growth rate between 2022-2023, majorly impacted by the decline in investments in the Singapore market after the moratorium. However, lifting the moratorium and the expected increase in colocation demand across countries such as Malaysia, Thailand, Vietnam, Philippines, and Indonesia will slowly uplift the market's growth rate after 2024.
- In terms of investment, the Southeast Asia data center construction market is driven by factors such as digitalization initiatives across the countries, subsea and inland connectivity growth, and the adoption of technologies such as 5G, big data, IoT, and artificial intelligence.
- The region is also witnessing edge data center investments across several cities. For instance, in August 2022, Edge Centres announced the development of its EC61 (Chiang Mai) edge facility in Thailand. The company also has plans to deploy additional facilities, namely, EC63 (Khon Kaen) and EC62 (Phuket).
- Southeast Asia has robust connectivity with the rest of the world via high numbers of existing submarine cables. The increasing demand for connectivity has led to the further deployment of new cables that will be ready for service in the coming years.
- The region's tropical climate, the adoption of advanced technologies such as artificial intelligence, and the need for efficiency drive the adoption of liquid-based cooling solutions in the market.

MARKET TRENDS & DRIVERS

Focus on Sustainability in the Region is Gaining Traction

- In terms of power capacity, the Southeast Asia data center construction market has adopted several initiatives to make the market more sustainable in the coming years.
- Governments across the region are taking up initiatives for making the market sustainable with the adoption of green energy, reduction of carbon emissions, the introduction of carbon laws, carbon credits, tax incentives for the adoption of renewable energy, and others.
- For instance, the Government of Malaysia has aimed to generate around 31% of renewable energy out of the total power generation in Malaysia by 2025, with a major contribution expected from renewable energy sources.
- Colocation operator ST Telemedia Global Data Centres has pledged to be carbon neutral by the year 2030, and it announced in November 2021 for purchase of carbon credits in Singapore.
- Several operators are signing power purchase agreements to adopt green energy sources for their data center operations. For instance, in April 2022, YTL Data Center announced the development of its data center park powered by solar energy with a total capacity of around 500 MW located in Johor, Malaysia, out of which the first phase with a capacity of around 72 MW is expected to be operational by Q1 2024.
5G Deployments Will Drive Edge Data Center Investments

The deployment of 5G services across the region has grown significantly across countries such as Singapore, Indonesia, Thailand, Malaysia, Philippines, Vietnam, and others. Adopting advanced technologies such as 5G is further expected to launch in other regional countries.

These factors will increase demand for the deployment of edge data centers in tier 1 and tier 2 cities that have low connectivity or are in close proximity to any established mega data center facility. For instance, Edge Centres is involved in developing the pipeline of edge center facilities in Thailand, Malaysia, Vietnam, Indonesia, and the Philippines.

SEGMENTATION INSIGHTS

- Data centers invest more in power infrastructure with a minimum of N+1 redundancy. Most facilities are installed with N+N or 2N redundancy for power infrastructure, with more redundancy for UPS and generator systems. The market is witnessing significant growth in the procurement of lithium-ion UPS systems.
- Most edge facility deployment will include single-phase lithium-ion UPS and monitored and switched PDUs. Therefore, the emergence of edge facilities will majorly boost the Southeast Asia data center construction market growth.
- The market has a presence of several local and global general construction service vendors such as Arup, Aurecon Group, Gammon Construction, CSF Group, First Balfour, NTT Facilities Group, AWP Architects, Corgan, DPR Construction, Kienta Engineering Construction, Obayashi Corporation, Nakano Corporation, Powerware Systems, RED Engineering, and others.
- In 2022, in Southeast Asia, the colocation market was dominated by companies such as Digital Realty, Equinix, FPT Telecom, Iron Mountain, ST Telemedia Global Data Centres, and Big Data Exchange (BDx). Several telecommunication operators have also invested in developing colocation data center facilities in the region in 2022.
- In terms of investments, the market is witnessing data center investments by several new entrants, such as OneAsia Network, Pure Data Centres Group, Nautilus Data Technologies, EdgeConneX, and Edge Centres.

The report includes the investment in the following areas:

- Facility Type
o Colocation
o Hyperscale
o Enterprise Data Centers
- Infrastructure
o Electrical Infrastructure
o Mechanical Infrastructure
o General Construction
- Electrical Infrastructure
o Uninterruptible Power Supply (UPS) Systems
o Generators
o Power Distribution Units
o Transfer Switches & Switchgear
o Other Electrical Infrastructure
- Mechanical Infrastructure
o Cooling Systems
o Racks
o Other Mechanical Infrastructure
- Cooling Systems
o CRAC & CRAH Units
o Chiller Units
o Cooling Towers
o Condensers & Dry Coolers
o Economizer & Evaporative Coolers
o Other Cooling Units
- Cooling Techniques
o Air-based Cooling Techniques
o Liquid-based Cooling Techniques
- General Construction
o Core & Shell Development
o Installation & Commissioning Services
o Engineering & Building Design
o Fire Detection & Suppression
o Physical Security
o Data Center Infrastructure Management (DCIM)/Building Management Systems (BMS)
- Tier Standards
o Tier I & II
o Tier III
o Tier IV

GEOGRAPHICAL ANALYSIS

- Singapore has been a major shareholder in the overall investments in the Southeast Asia data center construction market. However, the market faced challenges led by the moratorium in the country in 2020 and 2021, which was lifted in June 2022, with the authorities announcing invitations for facilities development plans in July 2022.
- In 2022, the investments across countries such as Indonesia, Malaysia, and Thailand grew significantly from existing operators along with the entry of new entrants. Other countries, such as the Philippines and Vietnam, have also emerged as new locations that have witnessed an increase in investments for mega and edge data centers.
- Several new entrants have been identified in the Southeast Asia data center construction market, including recently established brands and the expansion of China-based operators like GDS Services and OneAsia Network into the Southeast Asian region.

- Geography
o Southeast Asia
- Singapore
- Indonesia
- Malaysia
- Thailand
- Philippines
- Vietnam
- Other Southeast Asia Countries

VENDOR LANDSCAPE

- The Southeast Asia data center construction market has the presence of several global and local construction contractor vendors. These prominent vendors include Arup, Aurecon Group, AWP Architects, CSF Group, Corgan, DSCO Group, First Balfour, Gammon Construction, ISG, Kienta Engineering Construction, NTT Facilities Group, PM Group, Powerware Systems, Red Engineering, others offering their services in the region. For instance, Philippines-based construction contractor First Balfour has provided general construction services to ePLDTs VITRO Data Center for its facility in Makati, Philippines.
- The Southeast Asia data center construction market, in terms of support infrastructure vendors, has the presence of several global vendors such as ABB, Airedale, Caterpillar, Cummins, Delta Electronics, Eaton, HITEC Power Protection, KOHLER Power, Legrand, Piller Power Systems, Rolls-Royce, Rittal, STULZ, Schneider Electric, Vertiv, and others. These players are offering traditional and innovative data center solutions in the market.

Major Vendors

Support Infrastructure Vendors

- ABB
- Airedale
- Caterpillar
- Cummins
- Cyber Power Systems
- Delta Electronics
- Eaton
- Fuji Electric
- HITEC Power Protection
- KOHLER Power
- Legrand
- Mitsubishi Electric
- Narada
- Piller Power Systems
- Rittal
- Rolls-Royce
- Schneider Electric
- Siemens
- STULZ
- Trane
- Vertiv

Data Center Construction Contractors

- Arup
- Aurecon Group
- AWP Architects
- CSF Group
- Corgan
- DSCO Group
- DPR Construction
- Faithful+Gould
- First Balfour
- Fortis Construction
- Gammon Construction
- ISG
- Kienta Engineering Construction
- Linesight
- LSK Engineering
- M+W Group
- Nakano Corporation
- NTT Facilities Group
- Obayashi Corporation
- PM Group
- Powerware Systems (PWS)
- Red Engineering
- Sato Kogyo

Data Center Investors

- AirTrunk
- Amazon Web Services (AWS)
- Big Data Exchange (BDx)
- Bee Information Technology
- Chindata
- CMC Telecom
- Converge ICT Solutions
- DCI Indonesia
- Digital Edge DC
- DITO Telecommunity
- DTP
- ePLDT
- Equinix
- Facebook (Meta)
- FPT Telecom
- Google
- HTC International Telecommunication JSC (HTC-ITC)
- Huawei Technologies
- Iron Mountain
- Keppel Data Centres
- Microsoft
- NTT Global Data Centers
- Open DC
- PP Telecommunication (PPTEL)
- Princeton Digital Group
- SpaceDC
- ST Telemedia Global Data Centres
- Telehouse
- Telkom Indonesia
- True IDC
- Vantage Data Centers
- Viettel IDC

New Entrants

- Data Center First
- Edge Centres
- EdgeConneX
- Evolution Data Centres
- MettaDC
- Nautilus Data Technologies
- OneAsia Network
- Pure Data Centres Group
- YCO Cloud Centers
- Yondr
- YTL Data Center

KEY QUESTIONS ANSWERED

1. How big is the Southeast Asia data center construction market?
2. What is the growth rate of the Southeast Asia data center construction market?
3. What is the estimated market size in terms of area in the Southeast Asia data center construction market by 2028?
4. What factors drive the growth in the Southeast Asia data center construction market?
5. How many MW of power capacity is expected to reach the Southeast Asia data center construction market by 2028?

1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS

4 SCOPE & COVERAGE
4.1 MARKET DEFINITION
4.2 BASE YEAR
4.3 SCOPE OF THE STUDY
4.4 MARKET SEGMENTS
4.4.1 MARKET SEGMENTATION BY INFRASTRUCTURE
4.4.2 MARKET SEGMENTATION BY ELECTRICAL INFRASTRUCTURE
4.4.3 MARKET SEGMENTATION BY MECHANICAL INFRASTRUCTURE
4.4.4 MARKET SEGMENTATION BY COOLING SYSTEMS
4.4.5 MARKET SEGMENTATION BY COOLING TECHNIQUE
4.4.6 MARKET SEGMENTATION BY GENERAL CONSTRUCTION
4.4.7 MARKET SEGMENTATION BY TIER STANDARDS
4.4.8 MARKET SEGMENTATION BY GEOGRAPHY

5 REPORT ASSUMPTIONS & CAVEATS
5.1 KEY CAVEATS
5.2 CURRENCY CONVERSION
5.3 MARKET DERIVATION

6 PREMIUM INSIGHTS
6.1 KEY HIGHLIGHTS
6.2 SEGMENT ANALYSIS
6.3 KEY TRENDS IN THE MARKET
6.4 GEOGRAPHICAL ANALYSIS
6.5 VENDOR ANALYSIS

7 MARKET AT A GLANCE
8 INTRODUCTION
8.1 DATA CENTER CONSTRUCTION MARKET OVERVIEW
8.2 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET OVERVIEW
8.3 DATA CENTER DESIGN CERTIFICATIONS
8.3.1 UPTIME INSTITUTE TIER STANDARDS
8.3.2 LEED CERTIFICATION
8.3.3 TIA 942 CERTIFICATION

9 MARKET OPPORTUNITIES & TRENDS
9.1 GROWING SUSTAINABILITY INITIATIVES
9.2 RISE IN 5G & EDGE DATA CENTER DEPLOYMENTS
9.3 GROWING ADOPTION OF ARTIFICIAL INTELLIGENCE
9.4 DATA LOCALIZATION LAWS IN THE REGION

10 MARKET GROWTH ENABLERS
10.1 INCREASING ADOPTION OF CLOUD-BASED SERVICES
10.2 GROWING DIGITALIZATION INITIATIVES
10.3 INCREASING ADOPTION OF BIG DATA & IOT AND SMART CITY DEVELOPMENTS
10.4 RISE IN SUBMARINE CABLE CONNECTIVITY

11 MARKET RESTRAINTS
11.1 DEARTH OF SKILLED WORKFORCE
11.2 SECURITY CHALLENGES IN DATA CENTERS
11.3 LOCATION CONSTRAINTS ON DATA CENTER CONSTRUCTION

12 MARKET LANDSCAPE
12.1 MARKET OVERVIEW
12.2 INVESTMENT: MARKET SIZE & FORECAST
12.3 AREA: MARKET SIZE & FORECAST
12.4 POWER CAPACITY: MARKET SIZE & FORECAST
12.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
12.6 FIVE FORCES ANALYSIS
12.6.1 THREAT OF NEW ENTRANTS
12.6.2 BARGAINING POWER OF SUPPLIERS
12.6.3 BARGAINING POWER OF BUYERS
12.6.4 THREAT OF SUBSTITUTES
12.6.5 COMPETITIVE RIVALRY

13 FACILITY TYPE
13.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
13.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
13.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
13.4 COLOCATION DATA CENTERS
13.4.1 MARKET OVERVIEW
13.4.2 INVESTMENT: MARKET SIZE & FORECAST
13.4.3 AREA: MARKET SIZE & FORECAST
13.4.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.5 HYPERSCALE DATA CENTERS
13.5.1 MARKET OVERVIEW
13.5.2 INVESTMENT: MARKET SIZE & FORECAST
13.5.3 AREA: MARKET SIZE & FORECAST
13.5.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.6 ENTERPRISE DATA CENTERS
13.6.1 MARKET OVERVIEW
13.6.2 INVESTMENT: MARKET SIZE & FORECAST
13.6.3 AREA: MARKET SIZE & FORECAST
13.6.4 POWER CAPACITY: MARKET SIZE & FORECAST

14 INFRASTRUCTURE
14.1 MARKET SNAPSHOT & GROWTH ENGINE
14.2 ELECTRICAL INFRASTRUCTURE
14.2.1 MARKET OVERVIEW
14.2.2 MARKET SIZE & FORECAST
14.3 MECHANICAL INFRASTRUCTURE
14.3.1 MARKET OVERVIEW
14.3.2 MARKET SIZE & FORECAST
14.4 GENERAL CONSTRUCTION
14.4.1 MARKET OVERVIEW
14.4.2 MARKET SIZE & FORECAST

15 ELECTRICAL INFRASTRUCTURE
15.1 MARKET SNAPSHOT & GROWTH ENGINE
15.2 UPS SYSTEMS
15.2.1 MARKET OVERVIEW
15.2.2 MARKET SIZE & FORECAST
15.3 GENERATORS
15.3.1 MARKET OVERVIEW
15.3.2 MARKET SIZE & FORECAST
15.4 TRANSFER SWITCHES & SWITCHGEAR
15.4.1 MARKET OVERVIEW
15.4.2 MARKET SIZE & FORECAST
15.5 POWER DISTRIBUTION UNITS
15.5.1 MARKET OVERVIEW
15.5.2 MARKET SIZE & FORECAST
15.6 OTHER ELECTRICAL INFRASTRUCTURE
15.6.1 MARKET OVERVIEW
15.6.2 MARKET SIZE & FORECAST

16 MECHANICAL INFRASTRUCTURE
16.1 MARKET SNAPSHOT & GROWTH ENGINE
16.2 COOLING SYSTEMS
16.2.1 MARKET OVERVIEW
16.2.2 MARKET SIZE & FORECAST
16.3 RACKS
16.3.1 MARKET OVERVIEW
16.3.2 MARKET SIZE & FORECAST
16.4 OTHER MECHANICAL INFRASTRUCTURE
16.4.1 MARKET OVERVIEW
16.4.2 MARKET SIZE & FORECAST

17 COOLING SYSTEMS
17.1 MARKET SNAPSHOT & GROWTH ENGINE
17.2 CRAC & CRAH UNITS
17.2.1 MARKET OVERVIEW
17.2.2 MARKET SIZE & FORECAST
17.3 CHILLER UNITS
17.3.1 MARKET OVERVIEW
17.3.2 MARKET SIZE & FORECAST
17.4 COOLING TOWERS, CONDENSERS & DRY COOLERS
17.4.1 MARKET OVERVIEW
17.4.2 MARKET SIZE & FORECAST
17.5 OTHER COOLING UNITS
17.5.1 MARKET OVERVIEW
17.5.2 MARKET SIZE & FORECAST

18 COOLING TECHNIQUE
18.1 MARKET SNAPSHOT & GROWTH ENGINE
18.2 AIR-BASED COOLING
18.2.1 MARKET OVERVIEW
18.2.2 MARKET SIZE & FORECAST
18.3 LIQUID-BASED COOLING
18.3.1 MARKET OVERVIEW
18.3.2 MARKET SIZE & FORECAST

19 GENERAL CONSTRUCTION
19.1 MARKET SNAPSHOT & GROWTH ENGINE
19.2 CORE & SHELL DEVELOPMENT
19.2.1 MARKET OVERVIEW
19.2.2 MARKET SIZE & FORECAST
19.3 INSTALLATION & COMMISSIONING SERVICES
19.3.1 MARKET OVERVIEW
19.3.2 MARKET SIZE & FORECAST
19.4 ENGINEERING & BUILDING DESIGN
19.4.1 MARKET OVERVIEW
19.4.2 MARKET SIZE & FORECAST
19.5 FIRE DETECTION & SUPPRESSION
19.5.1 MARKET OVERVIEW
19.5.2 MARKET SIZE & FORECAST
19.6 PHYSICAL SECURITY
19.6.1 MARKET OVERVIEW
19.6.2 MARKET SIZE & FORECAST
19.7 DCIM/BMS SOLUTIONS
19.7.1 MARKET OVERVIEW
19.7.2 MARKET SIZE & FORECAST

20 TIER STANDARDS
20.1 MARKET SNAPSHOT & GROWTH ENGINE
20.2 TIER I & II
20.2.1 MARKET OVERVIEW
20.2.2 MARKET SIZE & FORECAST
20.3 TIER III
20.3.1 MARKET OVERVIEW
20.3.2 MARKET SIZE & FORECAST
20.4 TIER IV
20.4.1 MARKET OVERVIEW
20.4.2 MARKET SIZE & FORECAST

21 SOUTHEAST ASIA
21.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
21.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
21.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE

22 SINGAPORE
22.1 MARKET SNAPSHOT & GROWTH ENGINE
22.2 MARKET OVERVIEW
22.3 INVESTMENT: MARKET SIZE & FORECAST
22.4 AREA: MARKET SIZE & FORECAST
22.5 POWER CAPACITY: MARKET SIZE & FORECAST
22.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

23 INDONESIA
23.1 MARKET SNAPSHOT & GROWTH ENGINE
23.2 MARKET OVERVIEW
23.3 INVESTMENT: MARKET SIZE & FORECAST
23.4 AREA: MARKET SIZE & FORECAST
23.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

24 MALAYSIA
24.1 MARKET SNAPSHOT & GROWTH ENGINE
24.2 MARKET OVERVIEW
24.3 INVESTMENT: MARKET SIZE & FORECAST
24.4 AREA: MARKET SIZE & FORECAST
24.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

25 THAILAND
25.1 MARKET SNAPSHOT & GROWTH ENGINE
25.2 MARKET OVERVIEW
25.3 INVESTMENT: MARKET SIZE & FORECAST
25.4 AREA: MARKET SIZE & FORECAST
25.5 POWER CAPACITY: MARKET SIZE & FORECAST
25.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

26 PHILIPPINES
26.1 MARKET SNAPSHOT & GROWTH ENGINE
26.2 MARKET OVERVIEW
26.3 INVESTMENT: MARKET SIZE & FORECAST
26.4 AREA: MARKET SIZE & FORECAST
26.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

27 VIETNAM
27.1 MARKET SNAPSHOT & GROWTH ENGINE
27.2 MARKET OVERVIEW
27.3 INVESTMENT: MARKET SIZE & FORECAST
27.4 AREA: MARKET SIZE & FORECAST
27.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

28 OTHER SOUTHEAST ASIAN COUNTRIES
28.1 MARKET SNAPSHOT & GROWTH ENGINE
28.2 MARKET OVERVIEW
28.3 INVESTMENT: MARKET SIZE & FORECAST
28.4 AREA: MARKET SIZE & FORECAST
28.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

29 COMPETITIVE LANDSCAPE
29.1 ELECTRICAL INFRASTRUCTURE
29.2 MECHANICAL INFRASTRUCTURE
29.3 GENERAL CONSTRUCTION
29.4 DATA CENTER INVESTORS

30 PROMINENT SUPPORT INFRASTRUCTURE VENDORS
30.1 ABB
30.1.1 BUSINESS OVERVIEW
30.1.2 PRODUCT OFFERINGS
30.2 AIREDALE
30.2.1 BUSINESS OVERVIEW
30.2.2 PRODUCT OFFERINGS
30.3 CATERPILLAR
30.3.1 BUSINESS OVERVIEW
30.3.2 PRODUCT OFFERINGS
30.4 CUMMINS
30.4.1 BUSINESS OVERVIEW
30.4.2 PRODUCT OFFERINGS
30.5 CYBER POWER SYSTEMS
30.5.1 BUSINESS OVERVIEW
30.5.2 PRODUCT OFFERINGS
30.6 DELTA ELECTRONICS
30.6.1 BUSINESS OVERVIEW
30.6.2 PRODUCT OFFERINGS
30.7 EATON
30.7.1 BUSINESS OVERVIEW
30.7.2 PRODUCT OFFERINGS
30.8 FUJI ELECTRIC
30.8.1 BUSINESS OVERVIEW
30.8.2 PRODUCT OFFERINGS
30.9 HITEC POWER PROTECTION
30.9.1 BUSINESS OVERVIEW
30.9.2 PRODUCT OFFERINGS
30.10 KOHLER POWER
30.10.1 BUSINESS OVERVIEW
30.10.2 PRODUCT OFFERINGS
30.11 LEGRAND
30.11.1 BUSINESS OVERVIEW
30.11.2 PRODUCT OFFERINGS
30.12 MITSUBISHI ELECTRIC
30.12.1 BUSINESS OVERVIEW
30.12.2 PRODUCT OFFERINGS
30.13 NARADA
30.13.1 BUSINESS OVERVIEW
30.13.2 PRODUCT OFFERINGS
30.14 PILLER POWER SYSTEMS
30.14.1 BUSINESS OVERVIEW
30.14.2 PRODUCT OFFERINGS
30.15 RITTAL
30.15.1 BUSINESS OVERVIEW
30.15.2 PRODUCT OFFERINGS
30.16 ROLLS-ROYCE
30.16.1 BUSINESS OVERVIEW
30.16.2 PRODUCT OFFERINGS
30.17 SCHNEIDER ELECTRIC
30.17.1 BUSINESS OVERVIEW
30.17.2 PRODUCT OFFERINGS
30.18 SIEMENS
30.18.1 BUSINESS OVERVIEW
30.18.2 PRODUCT OFFERINGS
30.19 STULZ
30.19.1 BUSINESS OVERVIEW
30.19.2 PRODUCT OFFERINGS
30.20 TRANE
30.20.1 BUSINESS OVERVIEW
30.20.2 PRODUCT OFFERINGS
30.21 VERTIV
30.21.1 BUSINESS OVERVIEW
30.21.2 PRODUCT OFFERINGS

31 PROMINENT DATA CENTER CONSTRUCTION CONTRACTORS
31.1 ARUP
31.1.1 BUSINESS OVERVIEW
31.1.2 SERVICE OFFERINGS
31.2 AURECON GROUP
31.2.1 BUSINESS OVERVIEW
31.2.2 SERVICE OFFERINGS
31.3 AWP ARCHITECTS
31.3.1 BUSINESS OVERVIEW
31.3.2 SERVICE OFFERINGS
31.4 CSF GROUP
31.4.1 BUSINESS OVERVIEW
31.4.2 SERVICE OFFERINGS
31.5 CORGAN
31.5.1 BUSINESS OVERVIEW
31.5.2 SERVICE OFFERINGS
31.6 DSCO GROUP
31.6.1 BUSINESS OVERVIEW
31.6.2 SERVICE OFFERINGS
31.7 DPR CONSTRUCTION
31.7.1 BUSINESS OVERVIEW
31.7.2 SERVICE OFFERINGS
31.8 FAITHFUL+GOULD
31.8.1 BUSINESS OVERVIEW
31.8.2 SERVICE OFFERINGS
31.9 FIRST BALFOUR
31.9.1 BUSINESS OVERVIEW
31.9.2 SERVICE OFFERINGS
31.1 FORTIS CONSTRUCTION
31.10.1 BUSINESS OVERVIEW
31.10.2 SERVICE OFFERINGS
31.11 GAMMON CONSTRUCTION
31.11.1 BUSINESS OVERVIEW
31.11.2 SERVICE OFFERINGS
31.12 ISG
31.12.1 BUSINESS OVERVIEW
31.12.2 SERVICE OFFERINGS
31.13 KIENTA ENGINEERING CONSTRUCTION
31.13.1 BUSINESS OVERVIEW
31.13.2 SERVICE OFFERINGS
31.14 LINESIGHT
31.14.1 BUSINESS OVERVIEW
31.14.2 SERVICE OFFERINGS
31.15 LSK ENGINEERING
31.15.1 BUSINESS OVERVIEW
31.15.2 SERVICE OFFERINGS
31.16 M+W GROUP
31.16.1 BUSINESS OVERVIEW
31.16.2 SERVICE OFFERINGS
31.17 NAKANO CORPORATION
31.17.1 BUSINESS OVERVIEW
31.17.2 SERVICE OFFERINGS
31.18 NTT FACILITIES GROUP
31.18.1 BUSINESS OVERVIEW
31.18.2 SERVICE OFFERINGS
31.19 OBAYASHI CORPORATION
31.19.1 BUSINESS OVERVIEW
31.19.2 SERVICE OFFERINGS
31.20 PM GROUP
31.20.1 BUSINESS OVERVIEW
31.20.2 SERVICE OFFERINGS
31.21 POWERWARE SYSTEMS (PWS)
31.21.1 BUSINESS OVERVIEW
31.21.2 SERVICE OFFERINGS
31.22 RED ENGINEERING
31.22.1 BUSINESS OVERVIEW
31.22.2 SERVICE OFFERINGS
31.23 SATO KOGYO
31.23.1 BUSINESS OVERVIEW
31.23.2 SERVICE OFFERINGS

32 KEY DATA CENTER INVESTORS
32.1 AIRTRUNK
32.1.1 BUSINESS OVERVIEW
32.1.2 SERVICE OFFERINGS
32.2 AMAZON WEB SERVICES (AWS)
32.2.1 BUSINESS OVERVIEW
32.2.2 SERVICE OFFERINGS
32.3 BIG DATA EXCHANGE (BDX)
32.3.1 BUSINESS OVERVIEW
32.3.2 SERVICE OFFERINGS
32.4 BEE INFORMATION TECHNOLOGY
32.4.1 BUSINESS OVERVIEW
32.4.2 SERVICE OFFERINGS
32.5 CHINDATA GROUP
32.5.1 BUSINESS OVERVIEW
32.5.2 SERVICE OFFERINGS
32.6 CMC TELECOM
32.6.1 BUSINESS OVERVIEW
32.6.2 SERVICE OFFERINGS
32.7 CONVERGE ICT SOLUTIONS
32.7.1 BUSINESS OVERVIEW
32.7.2 SERVICE OFFERINGS
32.8 DCI INDONESIA
32.8.1 BUSINESS OVERVIEW
32.8.2 SERVICE OFFERINGS
32.9 DIGITAL EDGE DC
32.9.1 BUSINESS OVERVIEW
32.9.2 SERVICE OFFERINGS
32.10 DITO TELECOMMUNITY
32.10.1 BUSINESS OVERVIEW
32.10.2 SERVICE OFFERINGS
32.11 DTP
32.11.1 BUSINESS OVERVIEW
32.11.2 SERVICE OFFERINGS
32.12 EPLDT
32.12.1 BUSINESS OVERVIEW
32.12.2 SERVICE OFFERINGS
32.13 EQUINIX
32.13.1 BUSINESS OVERVIEW
32.13.2 SERVICE OFFERINGS
32.14 FACEBOOK (META)
32.14.1 BUSINESS OVERVIEW
32.14.2 SERVICE OFFERINGS
32.15 FPT TELECOM
32.15.1 BUSINESS OVERVIEW
32.15.2 SERVICE OFFERINGS
32.16 GOOGLE
32.16.1 BUSINESS OVERVIEW
32.16.2 SERVICE OFFERINGS
32.17 HTC INTERNATIONAL TELECOMMUNICATION JSC (HTC-ITC)
32.17.1 BUSINESS OVERVIEW
32.17.2 SERVICE OFFERINGS
32.18 HUAWEI TECHNOLOGIES
32.18.1 BUSINESS OVERVIEW
32.18.2 SERVICE OFFERINGS
32.19 IRON MOUNTAIN
32.19.1 BUSINESS OVERVIEW
32.19.2 SERVICE OFFERINGS
32.20 KEPPEL DATA CENTRES
32.20.1 BUSINESS OVERVIEW
32.20.2 SERVICE OFFERINGS
32.21 MICROSOFT
32.21.1 BUSINESS OVERVIEW
32.21.2 SERVICE OFFERINGS
32.22 NTT GLOBAL DATA CENTERS
32.22.1 BUSINESS OVERVIEW
32.22.2 SERVICE OFFERINGS
32.23 OPEN DC
32.23.1 BUSINESS OVERVIEW
32.23.2 SERVICE OFFERINGS
32.24 PP TELECOMMUNICATION (PPTEL)
32.24.1 BUSINESS OVERVIEW
32.24.2 SERVICE OFFERINGS
32.25 PRINCETON DIGITAL GROUP
32.25.1 BUSINESS OVERVIEW
32.25.2 SERVICE OFFERINGS
32.26 SPACEDC
32.26.1 BUSINESS OVERVIEW
32.26.2 SERVICE OFFERINGS
32.27 ST TELEMEDIA GLOBAL DATA CENTRES
32.27.1 BUSINESS OVERVIEW
32.27.2 SERVICE OFFERINGS
32.28 TELEHOUSE
32.28.1 BUSINESS OVERVIEW
32.28.2 SERVICE OFFERINGS
32.29 TELKOM INDONESIA
32.29.1 BUSINESS OVERVIEW
32.29.2 SERVICE OFFERINGS
32.30 TRUE IDC
32.30.1 BUSINESS OVERVIEW
32.30.2 SERVICE OFFERINGS
32.31 VANTAGE DATA CENTERS
32.31.1 BUSINESS OVERVIEW
32.31.2 SERVICE OFFERINGS
32.32 VIETTEL IDC
32.32.1 BUSINESS OVERVIEW
32.32.2 SERVICE OFFERINGS

33 NEW ENTRANTS
33.1 DATA CENTER FIRST
33.1.1 BUSINESS OVERVIEW
33.1.2 SERVICE OFFERINGS
33.2 EDGE CENTRES
33.2.1 BUSINESS OVERVIEW
33.2.2 SERVICE OFFERINGS
33.3 EDGECONNEX (EQT INFRASTRUCTURE)
33.3.1 BUSINESS OVERVIEW
33.3.2 SERVICE OFFERINGS
33.4 EVOLUTION DATA CENTRES
33.4.1 BUSINESS OVERVIEW
33.4.2 SERVICE OFFERINGS
33.5 METTA DC
33.5.1 BUSINESS OVERVIEW
33.5.2 SERVICE OFFERINGS
33.6 NAUTILUS DATA TECHNOLOGIES
33.6.1 BUSINESS OVERVIEW
33.6.2 SERVICE OFFERINGS
33.7 ONEASIA NETWORK
33.7.1 BUSINESS OVERVIEW
33.7.2 SERVICE OFFERINGS
33.8 PURE DATA CENTRES GROUP
33.8.1 BUSINESS OVERVIEW
33.8.2 SERVICE OFFERINGS
33.9 YCO CLOUD
33.9.1 BUSINESS OVERVIEW
33.9.2 SERVICE OFFERINGS
33.10 YONDR
33.10.1 BUSINESS OVERVIEW
33.10.2 SERVICE OFFERINGS
33.11 YTL DATA CENTER
33.11.1 BUSINESS OVERVIEW
33.11.2 SERVICE OFFERINGS

34 REPORT SUMMARY
34.1 KEY TAKEAWAYS

35 QUANTITATIVE SUMMARY
35.1 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET
35.1.1 INVESTMENT: MARKET SIZE & FORECAST
35.1.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.2 MARKET SEGMENTATION
35.2.1 FACILITY TYPE: MARKET SIZE & FORECAST
35.2.2 FACILITY TYPE BY AREA: MARKET SIZE & FORECAST
35.2.3 FACILITY TYPE BY POWER CAPACITY: MARKET SIZE & FORECAST
35.2.4 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
35.2.5 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
35.2.6 COOLING SYSTEMS: MARKET SIZE & FORECAST
35.2.7 COOLING TECHNIQUE: MARKET SIZE & FORECAST
35.2.8 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
35.2.9 TIER STANDARDS: MARKET SIZE & FORECAST
35.3 GEOGRAPHY
35.3.1 INVESTMENT: MARKET SIZE & FORECAST
35.3.2 AREA: MARKET SIZE & FORECAST
35.3.3 POWER CAPACITY: MARKET SIZE & FORECAST
35.4 SINGAPORE
35.4.1 MARKET SIZE & FORECAST
35.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.5 INDONESIA
35.5.1 MARKET SIZE & FORECAST
35.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.6 MALAYSIA
35.6.1 MARKET SIZE & FORECAST
35.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.7 THAILAND
35.7.1 MARKET SIZE & FORECAST
35.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.8 PHILIPPINES
35.8.1 MARKET SIZE & FORECAST
35.8.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.9 VIETNAM
35.9.1 MARKET SIZE & FORECAST
35.9.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
35.10 OTHER SOUTHEAST ASIAN COUNTRIES
35.10.1 MARKET SIZE & FORECAST
35.10.2 INFRASTRUCTURE: MARKET SIZE & FORECAST

36 APPENDIX
36.1 ABBREVIATIONS

LIST OF EXHIBITS

EXHIBIT 1 SEGMENTATION OF SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET
EXHIBIT 2 MARKET SIZE CALCULATION APPROACH 2022
EXHIBIT 3 DATA CENTER INVESTMENT FLOWCHART
EXHIBIT 4 NEW ENTRANTS IN THE MARKET IN 2022
EXHIBIT 5 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET DYNAMICS
EXHIBIT 6 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 7 IMPACT OF GROWING SUSTAINABILITY INITIATIVES
EXHIBIT 8 IMPACT OF RISE IN 5G & EDGE DATA CENTER DEPLOYMENTS
EXHIBIT 9 IMPACT OF GROWING ADOPTION OF ARTIFICIAL INTELLIGENCE
EXHIBIT 10 IMPACT OF DATA LOCALIZATION LAWS IN THE REGION
EXHIBIT 11 IMPACT OF INCREASING ADOPTION OF CLOUD-BASED SERVICES
EXHIBIT 12 CLOUD AVAILABILITY ZONES IN SOUTHEAST ASIA
EXHIBIT 13 IMPACT OF GROWING DIGITALIZATION INITIATIVES
EXHIBIT 14 IMPACT OF INCREASING ADOPTION OF BIG DATA & IOT AND SMART CITY DEVELOPMENTS
EXHIBIT 15 IMPACT OF RISE IN SUBMARINE CABLE CONNECTIVITY
EXHIBIT 16 IMPACT OF DEARTH OF SKILLED WORKFORCE
EXHIBIT 17 IMPACT OF SECURITY CHALLENGES IN DATA CENTERS
EXHIBIT 18 IMPACT OF LOCATION CONSTRAINTS ON DATA CENTER CONSTRUCTION
EXHIBIT 19 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 20 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 21 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 22 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 23 FIVE FORCES ANALYSIS 2021
EXHIBIT 24 INCREMENTAL GROWTH BY FACILITY TYPE 2022 & 2028
EXHIBIT 25 INCREMENTAL GROWTH BY FACILITY TYPE 2022 & 2028
EXHIBIT 26 INCREMENTAL GROWTH BY FACILITY TYPE 2022 & 2028
EXHIBIT 27 SOUTHEAST ASIA COLOCATION DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 28 SOUTHEAST ASIA COLOCATION DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 29 SOUTHEAST ASIA COLOCATION DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 30 SOUTHEAST ASIA HYPERSCALE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 31 SOUTHEAST ASIA HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 32 SOUTHEAST ASIA HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 33 SOUTHEAST ASIA ENTERPRISE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 34 SOUTHEAST ASIA ENTERPRISE DATA CENTER MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 35 SOUTHEAST ASIA ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 36 INCREMENTAL GROWTH BY INFRASTRUCTURE 2022 & 2028
EXHIBIT 37 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 38 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 39 SOUTHEAST ASIA DATA CENTER GENERAL CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 40 INCREMENTAL GROWTH BY ELECTRICAL INFRASTRUCTURE 2022 & 2028
EXHIBIT 41 SOUTHEAST ASIA DATA CENTER CONSTRUCTION UPS SYSTEMS MARKET 2022-2028 ($ MILLION)
EXHIBIT 42 SOUTHEAST ASIA DATA CENTER CONSTRUCTION GENERATORS MARKET 2022-2028 ($ MILLION)
EXHIBIT 43 SOUTHEAST ASIA DATA CENTER CONSTRUCTION TRANSFER SWITCHES & SWITCHGEAR MARKET 2022-2028 ($ MILLION)
EXHIBIT 44 SOUTHEAST ASIA DATA CENTER CONSTRUCTION POWER DISTRIBUTION UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 45 SOUTHEAST ASIA DATA CENTER CONSTRUCTION OTHER ELECTRICAL INFRASTRUCTURE MARKET 2022-2028 ($ MILLION)
EXHIBIT 46 INCREMENTAL GROWTH BY MECHANICAL INFRASTRUCTURE 2022 & 2028
EXHIBIT 47 SOUTHEAST ASIA DATA CENTER CONSTRUCTION COOLING SYSTEMS MARKET 2022-2028 ($ MILLION)
EXHIBIT 48 SOUTHEAST ASIA DATA CENTER CONSTRUCTION RACKS MARKET 2022-2028 ($ MILLION)
EXHIBIT 49 SOUTHEAST ASIA DATA CENTER CONSTRUCTION OTHER MECHANICAL INFRASTRUCTURE MARKET 2022-2028 ($ MILLION)
EXHIBIT 50 INCREMENTAL GROWTH BY COOLING SYSTEMS 2022 & 2028
EXHIBIT 51 SOUTHEAST ASIA DATA CENTER CONSTRUCTION CRAC & CRAH UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 52 SOUTHEAST ASIA DATA CENTER CONSTRUCTION CHILLER UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 53 SOUTHEAST ASIA DATA CENTER CONSTRUCTION COOLING TOWERS, CONDENSERS & DRY COOLERS MARKET 2022-2028 ($ MILLION)
EXHIBIT 54 SOUTHEAST ASIA DATA CENTER CONSTRUCTION OTHER COOLING UNITS MARKET 2022-2028 ($ MILLION)
EXHIBIT 55 INCREMENTAL GROWTH BY COOLING TECHNIQUE 2022 & 2028
EXHIBIT 56 SOUTHEAST ASIA DATA CENTER CONSTRUCTION AIR-BASED COOLING MARKET 2022-2028 ($ MILLION)
EXHIBIT 57 SOUTHEAST ASIA DATA CENTER CONSTRUCTION LIQUID-BASED COOLING MARKET 2022-2028 ($ MILLION)
EXHIBIT 58 INCREMENTAL GROWTH BY GENERAL CONSTRUCTION 2022 & 2028
EXHIBIT 59 SOUTHEAST ASIA DATA CENTER CONSTRUCTION CORE & SHELL DEVELOPMENT MARKET 2022-2028 ($ MILLION)
EXHIBIT 60 SOUTHEAST ASIA DATA CENTER CONSTRUCTION INSTALLATION & COMMISSIONING SERVICES MARKET 2022-2028 ($ MILLION)
EXHIBIT 61 SOUTHEAST ASIA DATA CENTER CONSTRUCTION ENGINEERING & BUILDING DESIGN MARKET 2022-2028 ($ MILLION)
EXHIBIT 62 SOUTHEAST ASIA DATA CENTER CONSTRUCTION FIRE DETECTION & SUPPRESSION MARKET 2022-2028 ($ MILLION)
EXHIBIT 63 SOUTHEAST ASIA DATA CENTER CONSTRUCTION PHYSICAL SECURITY MARKET 2022-2028 ($ MILLION)
EXHIBIT 64 SOUTHEAST ASIA DATA CENTER CONSTRUCTION DCIM/BMS SOLUTIONS MARKET 2022-2028 ($ MILLION)
EXHIBIT 65 INCREMENTAL GROWTH BY TIER STANDARDS 2022 & 2028
EXHIBIT 66 SOUTHEAST ASIA TIER I & II DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 67 SOUTHEAST ASIA TIER III DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 68 SOUTHEAST ASIA TIER IV DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 69 INCREMENTAL GROWTH IN SOUTHEAST ASIA 2022 & 2028
EXHIBIT 70 INCREMENTAL GROWTH IN SOUTHEAST ASIA 2022 & 2028
EXHIBIT 71 INCREMENTAL GROWTH IN SOUTHEAST ASIA 2022 & 2028
EXHIBIT 72 SNAPSHOT: SINGAPORE DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 73 OVERVIEW: SINGAPORE DATA CENTER CONSTRUCTION MARKET
EXHIBIT 74 SINGAPORE DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 75 SINGAPORE DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 76 SINGAPORE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 77 SINGAPORE DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 78 SNAPSHOT: INDONESIA DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 79 OVERVIEW: INDONESIA DATA CENTER CONSTRUCTION MARKET
EXHIBIT 80 INDONESIA DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 81 INDONESIA DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 82 INDONESIA DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 83 INDONESIA DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 84 SNAPSHOT: MALAYSIA DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 85 OVERVIEW: MALAYSIA DATA CENTER CONSTRUCTION MARKET
EXHIBIT 86 MALAYSIA DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 87 MALAYSIA DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 88 MALAYSIA DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 89 MALAYSIA DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 90 SNAPSHOT: THAILAND DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 91 OVERVIEW: THAILAND DATA CENTER CONSTRUCTION MARKET
EXHIBIT 92 THAILAND DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 93 THAILAND DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 94 THAILAND DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 95 THAILAND DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 96 SNAPSHOT: PHILIPPINES DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 97 OVERVIEW: PHILIPPINES DATA CENTER CONSTRUCTION MARKET
EXHIBIT 98 PHILIPPINES DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 99 PHILIPPINES DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 100 PHILIPPINES DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 101 PHILIPPINES DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 102 SNAPSHOT: VIETNAM DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 103 OVERVIEW: VIETNAM DATA CENTER CONSTRUCTION MARKET
EXHIBIT 104 VIETNAM DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 105 VIETNAM DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 106 VIETNAM DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 107 VIETNAM DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 108 SNAPSHOT: OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET 2023-2028
EXHIBIT 109 OVERVIEW: OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET
EXHIBIT 110 OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 111 OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 112 OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 113 OTHER SOUTHEAST ASIAN COUNTRIES DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)

LIST OF TABLES

TABLE 1 KEY CAVEATS
TABLE 2 CURRENCY CONVERSION 2016?2022
TABLE 3 SOME SUBMARINE CABLES
CONNECTING SOUTHEAST ASIA
TABLE 4 SOUTHEAST ASIAN COUNTRIES CYBERSECURITY INDEX 2022 (OUT OF 100)
TABLE 5 DATA CENTER INVESTMENTS IN SOUTHEAST ASIA 2022-2028
TABLE 6 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 7 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022?2028 ($ MILLION)
TABLE 8 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE 2022-2028 ($ MILLION)
TABLE 9 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE BY AREA 2022-2028 (THOUSAND SQUARE FEET)
TABLE 10 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE BY POWER CAPACITY 2022-2028 (MW)
TABLE 11 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 12 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 13 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY COOLING SYSTEMS 2022-2028 ($ MILLION)
TABLE 14 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY COOLING TECHNIQUE 2022-2028 ($ MILLION)
TABLE 15 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY GENERAL CONSTRUCTION 2022-2028 ($ MILLION)
TABLE 16 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY TIER STANDARDS 2022-2028 ($ MILLION)
TABLE 17 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2022-2028 ($ MILLION)
TABLE 18 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
TABLE 19 SOUTHEAST ASIA DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
TABLE 20 SINGAPORE DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 21 SINGAPORE DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 22 INDONESIA DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 23 INDONESIA DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 24 MALAYSIA DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 25 MALAYSIA DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 26 THAILAND DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 27 THAILAND DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 28 PHILIPPINES DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 29 PHILIPPINES DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 30 VIETNAM DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 31 VIETNAM DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 32 OTHER SOUTHEAST ASIA COUNTRIES CONSTRUCTION MARKET 2022?2028 ($ MILLION)
TABLE 33 OTHER SOUTHEAST ASIA COUNTRIES DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022?2028 ($ MILLION)

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE