Southeast Asia Data Center Construction - Industry Outlook & Forecast 2024-2029

Market Report I 2024-05-16 I 352 Pages I Arizton Advisory & Intelligence

The Southeast Asia data center construction market is expected to grow at a CAGR of 11.18% from 2023-2029.
KEY HIGHLIGHTS

- In Southeast Asia, the average land cost ranges from $10 to $25 per square foot. Regarding land acquisition costs, Malaysia and Vietnam are notable for their affordability, followed by countries like Indonesia, Thailand, and others, while Singapore stands out as the most expensive. Despite this, Vietnam, Indonesia, and the Philippines are witnessing significant digital activities such as e-commerce growth, government-led digitalization initiatives, and AI adoption.
- The presence of approximately 140 submarine cables in Southeast Asia and the ongoing development of over 41 new ones point to a growing emphasis on factors such as AI development, digitization, and the escalating volume of data stored within the region. This trend is expected to drive increased investments in the Southeast Asia data center construction market in the foreseeable future.
- In Southeast Asia, major cities such as Batam, Bekasi, Jakarta, Johor, West Java, Cyberjaya, Manila, Chon Buri, Ho Chi Minh City, and Bangkok collectively account for over 60% of the total data center capacity in the region. However, other cities are steadily narrowing this gap. Increased investments in data centers are anticipated to flow into these cities, driven by regulatory policies, the formation of data center clusters, and incentives such as low-cost labor and affordable land prices.
KEY MARKET TRENDS

Increased Digitalization

- Countries, including Singapore, Malaysia, Thailand, the Philippines, and others, emphasize digitalization as a key priority. Government incentives, ongoing digitalization efforts, and the increasing demand for cloud services are major factors contributing to the growth of the Southeast Asia data center construction market.
- Many governments are creating strategies to boost their countries' digital development. The Malaysia Digital initiative plays a pivotal role in fueling the expansion of the country's ecosystem across nine essential sectors. It promotes the uptake of digital technologies and creates opportunities in the digital economy, utilizing initiatives such as the Malaysia Digital Catalytic Programs (PEMANGKIN) and various other competitive offerings.

Adoption of Cloud-Based Services

- Global cloud service providers are expanding their presence in Malaysia and Thailand, following their past investments in Indonesia and Singapore. These cloud service providers are also expanding their self-built facilities in Singapore. New cloud regions are expected to open availability zones across the Philippines and Vietnam during the forecast period.
- The deployment of AI and machine learning workloads will witness significant growth, mainly contributed by global cloud service providers. Data center operators are redesigning their data centers to support AI workloads with liquid-based cooling technologies.
- The expansion of cloud services in Southeast Asia continues, fueled notably by local enterprises aiming to embrace digitalization for a competitive edge. The region's increased demand for cloud services witnessed a notable upswing during the pandemic. It continues to achieve great heights, primarily due to the crucial need for business continuity and the drive to maintain relevance within its specific industries.
SEGMENTATION INSIGHTS

- The Southeast Asian data center construction market is predominantly influenced by the development of colocation facilities, which attract significant investments. The market sees continuous expansion as new entrants actively participate in establishing colocation data centers. Concurrently, hyperscale data center operators are strengthening their market footprint by investing substantially in cloud regions. Notably, in 2023, countries such as Malaysia, Indonesia, and the Philippines also witnessed notable investments in enterprise data centers.
- Southeast Asian countries like Indonesia, Malaysia, the Philippines, Singapore, Thailand, and Vietnam experience a tropical climate. The predominant method employed for climate control in this region is air and water-based conditioning, chosen for its cost-effectiveness and ease of implementation. Nevertheless, alternative cooling methods, such as liquid cooling, are viable options to enhance energy efficiency and minimize consumption.
- The Southeast Asia data center construction market is experiencing an uptick in establishing data centers, particularly those undergoing Tier III and IV certification in either the design or construction stages. Many private and public entities, including those in banking, financial services, insurance (BFSI), education, and government sectors, are obtaining Uptime Institute's Tier III/IV certification either during the design phase or after the facility's completion.

The report includes the investment in the following areas:

Facility Type
- Colocation Data Centers
- Hyperscale Data Centers
- Enterprise Data Centers
Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgear
- PDUs
- Other Electrical Infrastructure
Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
Cooling Systems
- CRAC & CRAH Units
- Chiller Units
- Cooling Towers, Condensers & Dry Coolers
- Other Cooling Units
Cooling Techniques
- Air-based Cooling
- Liquid-based Cooling
General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Fire Detection & Suppression
- Physical Security
- DCIM/BMS Solutions
Tier Standard
- Tier I & II
- Tier III
- Tier IV

GEOGRAPHICAL ANALYSIS

- Indonesia's new investment announcements will be reduced in 2023. However, some of the announced facilities between 2020 and 2022 became operational. This trend will continue, with many facilities likely to be built over the next few years.
- In the last two years, new investments in Malaysia have skyrocketed across Kula Lumpur and Johor. Upcoming capacity in Malaysia is growing beyond 2 GW, with most new facilities likely operational in 2024 & 2025. AI has further strengthened Malaysia's growth in the last few years.
- While Singapore has traditionally been a top location for data centers, it is anticipated to experience a slowdown, despite lifting the moratorium, as other factors come into play. In 2023, Infocomm Media Development Authority (IMDA) and the Singapore Economic Development Board (EDB) selected four data center operators, namely, Microsoft, AirTrunk, Equinix, and GDS, to build new facilities with 80MW of cumulative data center capacity. This is phase 1 allocation, where we expect phase 2 allocation to follow over the next 1-2 years. In addition, hyperscale self-built Microsoft, Amazon, and Meta projects are still adding capacity to the industry. Also, Keppel and Sintel's new data center projects will support Singapore's growth over the next few years, adding capacity over 300 MW.
- Thailand and the Philippines also witnessed several new investments in the last few years, with a cumulative capacity of over 600 MW in the pipeline, which will be coming online during the forecast period.
- Vietnam is witnessing more investments from local operators, likely VNPT and Viettel IDC, and we believe investments from global operators will continue to increase. We are witnessing investments from Gaw Capital and NTT Global Data Centers.

Southeast Asia

- Singapore
- Indonesia
- Malaysia
- Thailand
- Philippines
- Vietnam
- Other Southeast Asia Countries

VENDOR LANDSCAPE

- The Southeast Asia data center construction market has grown significantly over the last few years with investments from several local and global data center operators. This will intensify the competition among the construction contractors and infrastructure providers.
- In Southeast Asia, colocation providers strategically build facilities in phases, aligning with market demand. Looking ahead, there is an expectation for a heightened demand for power infrastructure featuring higher capacity systems in a 2N redundancy configuration across multiple facilities.
- Southeast Asian investors adopt various sustainable designs to ensure that the facility operates at a PUE of less than 1.5, which was not achievable by the operational data center built before 2017. The recent sustainable data center design practices are complimented by innovative airand water-based cooling solutions, efficient power technologies, and sustainable construction practices.
- The major hyperscale operators investing in the Southeast Asia data center construction market include Amazon Web Services (AWS), Microsoft, Meta (Facebook), and Google.
- Adopting direct-to-chip and immersion cooling solutions will witness a marked increase across newly built data centers in Southeast Asia to support the deployment of AI workloads. These cutting-edge cooling techniques enhance efficiency and superior thermal management, decreasing energy usage and heightening overall performance.
- The Southeast Asian data center construction market has witnessed a significant increase in new entrants in the last few years, owing to its strong growth potential. The increase in new entrants will increase the competition for the existing data center operators, expanding their presence across countries.

Key Construction Contractors

- Arup
- Aurecon Group
- CSF Group
- DSCO Group
- Gammon Construction
- NTT Facilities
- PM Group
- Studio One Design

Other Prominent Construction Contractors

- AtkinsRealis
- AWP Architects
- Corgan
- DPR Construction
- First Balfour
- Fortis Construction
- ISG
- Kienta Engineering Construction
- Linesight
- LSK Engineering
- M+W Group
- Nakano Corporation
- Obayashi Corporation
- Powerware Systems
- Sato Kogyo
- Red Engineering

Prominent Support Infrastructure Vendors

- ABB
- Caterpillar
- Cisco Systems
- Cummins
- Dell Technologies
- Eaton
- Rittal
- Schneider Electric
- STULZ
- Vertiv

Other Prominent Support Infrastructure Vendors

- Airedale
- Alfa Laval
- Canovate
- Cyber Power Systems
- Delta Electronics
- EAE
- Fuji Electric
- Fujitsu
- Green Revolution Cooling
- Hewlett Packard Enterprise
- HITEC Power Protection
- Huawei Technologies
- KOHLER Power
- Legrand
- Lenovo
- Mitsubishi Electric
- Narada
- Nortek Air Solutions
- Piller Power Systems
- Rolls-Royce
- Shenzhen Envicool Technology
- Siemens
- Socomec
- Trane

Prominent Data Center Investors

- Amazon Web Services
- Chindata Group (Bridge Data Centres)
- DCI Indonesia
- Digital Realty
- ePLDT
- Equinix
- GDS Services
- Keppel Data Centres
- NTT DATA
- ST Telemedia Global Data Centres
- Telkom Indonesia
- VADS (Telekom Malaysia)
- Viettel IDC

Other Prominent Data Center Investors

- AirTrunk
- Beeinfotech
- Big Data Exchange (BDx)
- Converge ICT Solutions
- Digital Edge DC
- Meta (Facebook)
- FPT Telecom
- Google
- MettaDC
- Microsoft
- OneAsia Network
- Open DC
- Princeton Digital Group
- Singtel
- Vantage Data Centers

New Entrants

- CtrlS Datacenters
- Digital Halo
- EdgeConneX
- Evolution Data Centres
- Flow Digital Infrastructure
- FutureData (Cyclect Group + TSG Group)
- Gaw Capital
- I-Berhad
- Infinaxis Data Centre
- Infracrowd Capital
- K2 Data Centres
- Minoro Energi Indonesia
- Nautilus Data Technologies
- Pure Data Centres Group
- YCO Cloud
- YTL Data Center
- Yondr

KEY QUESTIONS ANSWERED:

1. How big is the Southeast Asia data center construction market?
2. What is the estimated market size in terms of area in the Southeast Asia data center construction market by 2029?
3. What is the growth rate of the Southeast Asia data center construction market?
4. What are the key trends in the Southeast Asia data center construction market?
5. How many MW of power capacity is expected to reach the Southeast Asia data center construction market by 2029?

1. REPORT COVERAGE
1.1. WHAT'S INCLUDED
1.2. SEGMENTAL COVERAGE
1.2.1. Market Segmentation by Facility Type
1.2.2. Market Segmentation by Infrastructure
1.2.3. Market Segmentation by Electrical Infrastructure
1.2.4. Market Segmentation by Mechanical Infrastructure
1.2.5. Market Segmentation by Cooling System
1.2.6. Market Segmentation by Cooling Techniques
1.2.7. Market Segmentation by General Construction
1.2.8. Market Segmentation by Tier Standards

2. PREMIUM INSIGHTS
2.1. KEY HIGHLIGHTS
2.2. KEY MARKET TRENDS
2.3. SEGMENTATION ANALYSIS
2.4. GEOGRAPHICAL ANALYSIS
2.5. VENDOR ANALYSIS

3. MARKET AT A GLANCE
4. INTRODUCTION
4.1. DATA CENTER DEVELOPMENT COST
4.2. DATA CENTER LAND COST
4.3. Data CENTER POWER COST
4.4. INTERNET PENETRATION
4.5. THE NETWORK READINESS INDEX
4.5.1. Technology
4.5.2. People
4.5.3. Governance
4.5.4. Impact

5. MARKET OPPORTUNITIES & TRENDS
5.1. EXPANDING SUSTAINABILITY INITIATIVES
5.2. RISE IN ADOPTION OF 5G TECHNOLOGY AND EXPANSION OF EDGE DATA CENTERS
5.3. ADVANCING IN ADOPTION OF AI

6. MARKET GROWTH ENABLERS
6.1. INCREASED SUBMARINE CABLE & INLAND CONNECTIVITY
6.2. INCREASING ADOPTION OF CLOUD-BASED SERVICES
6.3. INCREASED DIGITALIZATION
6.4. ADOPTION OF BIG DATA & INTERNET OF THINGS

7. MARKET RESTRAINTS
7.1. DATA CENTER SECURITY CHALLENGES
7.2. LACK OF SKILLED DATA CENTER PROFESSIONALS
7.3. DATA CENTER POWER & NETWORK OUTAGE CHALLENGES

8. MARKET LANDSCAPE
8.1. MARKET OVERVIEW
8.2. INVESTMENT: MARKET SIZE & FORECAST
8.3. AREA: MARKET SIZE & FORECAST
8.4. POWER CAPACITY: MARKET SIZE & FORECAST
8.5. SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

9. FACILITY TYPE
9.1. INVESTMENT: MARKET SNAPSHOT
9.2. AREA: MARKET SNAPSHOT
9.3. POWER CAPACITY: MARKET SNAPSHOT
9.4. COLOCATION DATA CENTERS
9.4.1. Market Overview
9.4.2. Investment: Market Size & Forecast
9.4.3. Area: Market Size & Forecast
9.4.4. Power Capacity: Market Size & Forecast
9.5. HYPERSCALE DATA CENTERS
9.5.1. Market Overview
9.5.2. Investment: Market Size & Forecast
9.5.3. Area: Market Size & Forecast
9.5.4. Power Capacity: Market Size & Forecast
9.6. ENTERPRISE DATA CENTERS
9.6.1. Market Overview
9.6.2. Investment: Market Size & Forecast
9.6.3. Area: Market Size & Forecast
9.6.4. Power Capacity: Market Size & Forecast

10. INFRASTRUCTURE
10.1. MARKET SNAPSHOT
10.2. KEY HIGHLIGHTS
10.3. ELECTRICAL INFRASTRUCTURE
10.3.1. Market Overview
10.3.2. Investment: Market Size & Forecast
10.4. MECHANICAL INFRASTRUCTURE
10.4.1. Market Overview
10.4.2. Investment: Market Size & Forecast
10.5. GENERAL CONSTRUCTION
10.5.1. Market Overview
10.5.2. Investment: Market Size & Forecast

11. ELECTRICAL INFRASTRUCTURE
11.1. MARKET SNAPSHOT
11.2. MARKET OVERVIEW
11.3. UPS SYSTEMS
11.3.1. Market Overview
11.3.2. Investment: Market Size & Forecast
11.4. GENERATORS
11.4.1. Market Overview
11.4.2. Investment: Market Size & Forecast
11.5. TRANSFER SWITCHES & SWITCHGEAR
11.5.1. Market Overview
11.5.2. Investment: Market Size & Forecast
11.6. PDUS
11.6.1. Market Overview
11.6.2. Investment: Market Size & Forecast
11.7. OTHER ELECTRICAL INFRASTRUCTURE
11.7.1. Market Overview
11.7.2. Investment: Market Size & Forecast

12. MECHANICAL INFRASTRUCTURE
12.1. MARKET SNAPSHOT
12.2. KEY HIGHLIGHTS
12.3. MARKET OVERVIEW
12.4. COOLING SYSTEMS
12.4.1. Market Overview
12.4.2. Investment: Market Size & Forecast
12.5. RACKS
12.5.1. Market Overview
12.5.2. Investment: Market Size & Forecast
12.6. OTHER MECHANICAL INFRASTRUCTURE
12.6.1. Market Overview
12.6.2. Investment: Market Size & Forecast

13. COOLING SYSTEM
13.1. MARKET SNAPSHOTS
13.2. KEY HIGHLIGHTS
13.3. CRAC & CRAH UNITS
13.3.1. Market Overview
13.3.2. Investment: Market Size & Forecast
13.4. CHILLER UNITS
13.4.1. Market Overview
13.4.2. Investment: Market Size & Forecast
13.5. COOLING TOWERS, CONDENSERS & DRY COOLERS
13.5.1. Market Overview
13.5.2. Investment: Market Size & Forecast
13.6. OTHER COOLING UNITS
13.6.1. Market Overview
13.6.2. Investment: Market Size & Forecast

14. COOLING TECHNIQUE
14.1. MARKET SNAPSHOT
14.2. KEY HIGHLIGHTS
14.3. MARKET OVERVIEW
14.4. AIR-BASED COOLING
14.4.1. Market Overview
14.4.2. Investment: Market Size & Forecast
14.5. LIQUID-BASED COOLING
14.5.1. Market Overview
14.5.2. Investment: Market Size & Forecast

15. GENERAL CONSTRUCTION
15.1. MARKET SNAPSHOT
15.2. KEY HIGHLIGHTS
15.3. MARKET OVERVIEW
15.4. CORE & SHELL DEVELOPMENT
15.4.1. Market Overview
15.4.2. Investment: Market Size & Forecast
15.5. INSTALLATION & COMMISSIONING SERVICES
15.5.1. Market Overview
15.5.2. Investment: Market Size & Forecast
15.6. ENGINEERING & BUILDING DESIGN
15.6.1. Market Overview
15.6.2. Investment: Market Size & Forecast
15.7. FIRE DETECTION & SUPPRESSION
15.7.1. Market Overview
15.7.2. Investment: Market Size & Forecast
15.8. PHYSICAL SECURITY
15.8.1. Market Overview
15.8.2. Investment: Market Size & Forecast
15.9. DCIM/BMS SOLUTIONS
15.9.1. Market Overview
15.9.2. Investment: Market Size & Forecast

16. TIER STANDARD
16.1. MARKET SNAPSHOTS
16.2. KEY HIGHLIGHTS
16.3. MARKET OVERVIEW
16.4. TIER I & II
16.4.1. Market Overview
16.4.2. Investment: Market Size & Forecast
16.5. TIER III
16.5.1. Market Overview
16.5.2. Investment: Market Size & Forecast
16.6. TIER IV
16.6.1. Market Overview
16.6.2. Investment: Market Size & Forecast

17. SOUTHEAST ASIA
17.1. SINGAPORE
17.1.1. Market Overview
17.1.2. Investment: Market Size & Forecast
17.1.3. Area: Market Size & Forecast
17.1.4. Power Capacity: Market Size & Forecast
17.1.5. Market By Infrastructure
17.2. INDONESIA
17.2.1. Market Overview
17.2.2. Investment: Market Size & Forecast
17.2.3. Area: Market Size & Forecast
17.2.4. Power Capacity: Market Size & Forecast
17.2.5. Market By Infrastructure
17.3. MALAYSIA
17.3.1. Market Overview
17.3.2. Investment: Market Size & Forecast
17.3.3. Area: Market Size & Forecast
17.3.4. Power Capacity: Market Size & Forecast
17.3.5. Market By Infrastructure
17.4. THAILAND
17.4.1. Market Overview
17.4.2. Investment: Market Size & Forecast
17.4.3. Area: Market Size & Forecast
17.4.4. Power Capacity: Market Size & Forecast
17.4.5. Market By Infrastructure
17.5. PHILIPPINES
17.5.1. Market Overview
17.5.2. Investment: Market Size & Forecast
17.5.3. Area: Market Size & Forecast
17.5.4. Power Capacity: Market Size & Forecast
17.5.5. Market By Infrastructure
17.6. VIETNAM
17.6.1. Market Overview
17.6.2. Investment: Market Size & Forecast
17.6.3. Area: Market Size & Forecast
17.6.4. Power Capacity: Market Size & Forecast
17.6.5. Market By Infrastructure
17.7. OTHER SOUTHEAST ASIAN COUNTRIES
17.7.1. Market Overview
17.7.2. Investment: Market Size & Forecast
17.7.3. Area: Market Size & Forecast
17.7.4. Power Capacity: Market Size & Forecast
17.7.5. Market By Infrastructure

18. COMPETITIVE LANDSCAPE
18.1.1. Support Infrastructure
18.1.2. General Construction
18.1.3. Data Center Investors

19. KEY CONSTRUCTION CONTRACTORS
19.1. ARUP
19.1.1. Business Overview
19.1.2. Service Offerings
19.2. AURECON GROUP
19.2.1. Business Overview
19.2.2. Service Offerings
19.3. CSF GROUP
19.3.1. Business Overview
19.3.2. Service Offerings
19.4. DSCO GROUP
19.4.1. Business Overview
19.4.2. Service Offerings
19.5. GAMMON CONSTRUCTION
19.5.1. Business Overview
19.5.2. Service Offerings
19.6. NTT FACILITIES
19.6.1. Business Overview
19.6.2. Service Offerings
19.7. PM GROUP
19.7.1. Business Overview
19.7.2. Service Offerings
19.8. STUDIO ONE DESIGN
19.8.1. Business Overview
19.8.2. Service Offerings

20. OTHER PROMINENT CONSTRUCTION CONTRACTORS
20.1. ATKINS REALIS
20.1.1. Business Overview
20.1.2. Service Offerings
20.2. AWP ARCHITECTS
20.2.1. Business Overview
20.2.2. Service Offerings
20.3. CORGAN
20.3.1. Business Overview
20.3.2. Service Offerings
20.4. DPR CONSTRUCTION
20.4.1. Business Overview
20.4.2. Service Offerings
20.5. FIRST BALFOUR
20.5.1. Business Overview
20.5.2. Service Offerings
20.6. FORTIS CONSTRUCTION
20.6.1. Business Overview
20.6.2. Service Offerings
20.7. ISG
20.7.1. Business Overview
20.7.2. Service Offerings
20.8. KIENTA ENGINEERING CONSTRUCTION
20.8.1. Business Overview
20.8.2. Service Offerings
20.9. LINESIGHT
20.9.1. Business Overview
20.9.2. Service Offerings
20.10. LSK ENGINEERING
20.10.1. Business Overview
20.10.2. Service Offerings
20.11. M+W GROUP
20.11.1. Business Overview
20.11.2. Service Offerings
20.12. NAKANO CORPORATION
20.12.1. Business Overview
20.12.2. Service offerings
20.13. OBAYASHI CORPORATION
20.13.1. Business Overview
20.13.2. Service offerings
20.14. POWERWARE SYSTEMS
20.14.1. Business Overview
20.14.2. Service Offerings
20.15. SATO KOGYO
20.15.1. Business Overview
20.15.2. Service Offerings
20.16. RED ENGINEERING
20.16.1. Business Overview
20.16.2. Service Offerings

21. PROMINENT SUPPORT INFRASTRUCTURE VENDORS
21.1. ABB
21.1.1. Business Overview
21.1.2. Product Offerings
21.2. CATERPILLAR
21.2.1. Business Overview
21.2.2. Product Offerings
21.3. CISCO SYSTEMS
21.3.1. Business Overview
21.3.2. Product Offerings
21.4. CUMMINS
21.4.1. Business Overview
21.4.2. Product Offerings
21.5. DELL TECHNOLOGIES
21.5.1. Business Overview
21.5.2. Product Offerings
21.6. EATON
21.6.1. Business Overview
21.6.2. Product Offerings
21.7. RITTAL
21.7.1. Business Overview
21.7.2. Product Offerings
21.8. SCHNEIDER ELECTRIC
21.8.1. Business Overview
21.8.2. Product Offerings
21.9. STULZ
21.9.1. Business Overview
21.9.2. Product Offerings
21.10. VERTIV
21.10.1. Business Overview
21.10.2. Product Offerings

22. OTHER PROMINENT SUPPORT INFRASTRUCTURE VENDORS
22.1. AIREDALE
22.1.1. Business Overview
22.1.2. Product Offerings
22.2. ALFA LAVAL
22.2.1. Business Overview
22.2.2. Product Offerings
22.3. CANOVATE
22.3.1. Business Overview
22.3.2. Product Offerings
22.4. CYBER POWER SYSTEMS
22.4.1. Business Overview
22.4.2. Product Offerings
22.5. DELTA ELECTRONICS
22.5.1. Business Overview
22.5.2. Product Offerings
22.6. EAE
22.6.1. Business Overview
22.6.2. Product Offerings
22.7. FUJI ELECTRIC
22.7.1. Business Overview
22.7.2. Product Offerings
22.8. FUJITSU
22.8.1. Business Overview
22.8.2. Product Offerings
22.9. GREEN REVOLUTION COOLING
22.9.1. Business Overview
22.9.2. Product Offerings
22.10. HEWLETT PACKARD ENTERPRISE
22.10.1. Business Overview
22.10.2. Product Offerings
22.11. HITEC POWER PROTECTION
22.11.1. Business Overview
22.11.2. Product Offerings
22.12. HUAWEI TECHNOLOGIES
22.12.1. Business Overview
22.12.2. Product Offerings
22.13. KOHLER POWER
22.13.1. Business Overview
22.13.2. Product Offerings
22.14. LEGRAND
22.14.1. Business Overview
22.14.2. Product Offerings
22.15. LENOVO
22.15.1. Business Overview
22.15.2. Product Offerings
22.16. MITSUBISHI ELECTRIC
22.16.1. Business Overview
22.16.2. Product Offerings
22.17. NARADA
22.17.1. Business Overview
22.17.2. Product Offerings
22.18. NORTEK AIR SOLUTIONS
22.18.1. Business Overview
22.18.2. Product Offerings
22.19. PILLER POWER SYSTEMS
22.19.1. Business Overview
22.19.2. Product Offerings
22.20. ROLLS-ROYCE
22.20.1. Business Overview
22.20.2. Product Offerings
22.21. SHENZHEN ENVICOOL TECHNOLOGY
22.21.1. Business Overview
22.21.2. Product Offerings
22.22. SIEMENS
22.22.1. Business Overview
22.22.2. Product Offerings
22.23. SOCOMEC
22.23.1. Business Overview
22.23.2. Product Offerings
22.24. TRANE
22.24.1. Business Overview
22.24.2. Product Offerings

23. PROMINENT DATA CENTER INVESTORS
23.1. AMAZON WEB SERVICES
23.1.1. Business Overview
23.1.2. Service Offerings
23.2. CHINDATA GROUP (BRIDGE DATA CENTRES)
23.2.1. Business Overview
23.2.2. Service Offerings
23.3. DCI INDONESIA
23.3.1. Business Overview
23.3.2. Service Offerings
23.4. DIGITAL REALTY
23.4.1. Business Overview
23.4.2. Service Offerings
23.5. ePLDT
23.5.1. Business Overview
23.5.2. Service Offerings
23.6. EQUINIX
23.6.1. Business Overview
23.6.2. Service Offerings
23.7. GDS SERVICES
23.7.1. Business Overview
23.7.2. Service Offerings
23.8. KEPPEL DATA CENTRES
23.8.1. Business Overview
23.8.2. Service Offerings
23.9. NTT DATA
23.9.1. Business Overview
23.9.2. Service Offerings
23.10. ST TELEMEDIA GLOBAL DATA CENTRES
23.10.1. Business Overview
23.10.2. Service Offerings
23.11. TELEKOM INDONESIA
23.11.1. Business Overview
23.11.2. Service Offerings
23.12. VADS (TELEKOM MALAYSIA)
23.12.1. Business Overview
23.12.2. Service Offerings
23.13. VIETTEL IDC
23.13.1. Business Overview
23.13.2. Service Offerings

24. OTHER PROMINENT DATA CENTER INVESTORS
24.1. AIRTRUNK
24.1.1. Business Overview
24.1.2. Service Offerings
24.2. BEEINFOTECH
24.2.1. Business Overview
24.2.2. Service Offerings
24.3. BIG DATA EXCHANGE
24.3.1. Business Overview
24.3.2. Service Offerings
24.4. CONVERGE ICT SOLUTIONS
24.4.1. Business Overview
24.4.2. Service Offerings
24.5. DIGITAL EDGE DC
24.5.1. Business Overview
24.5.2. Service Offerings
24.6. META (FACEBOOK)
24.6.1. Business Overview
24.6.2. Service Offerings
24.7. FPT TELECOM
24.7.1. Business Overview
24.7.2. Service Offerings
24.8. GOOGLE
24.8.1. Business Overview
24.8.2. Service Offerings
24.9. METTADC
24.9.1. Business Overview
24.9.2. Service Offerings
24.10. MICROSOFT
24.10.1. Business Overview
24.10.2. Service Offerings
24.11. ONEASIA NETWORK
24.11.1. Business Overview
24.11.2. Service Offerings
24.12. OPEN DC
24.12.1. Business Overview
24.12.2. Service Offerings
24.13. PRINCETON DIGITAL GROUP
24.13.1. Business Overview
24.13.2. Service Offerings
24.14. SINGTEL
24.14.1. Business Overview
24.14.2. Service Offerings
24.15. VANTAGE DATA CENTERS
24.15.1. Business Overview
24.15.2. Service Offerings

25. NEW ENTRANTS
25.1. CTRLS DATACENTERS
25.1.1. Business Overview
25.1.2. Service Offerings
25.2. DIGITAL HALO
25.2.1. Business Overview
25.2.2. Service Offerings
25.3. EDGECONNEX
25.3.1. Business Overview
25.3.2. Service Offerings
25.4. EVOLUTION DATA CENTRES
25.4.1. Business Overview
25.4.2. Service Offerings
25.5. FLOW DIGITAL INFRASTRUCTURE
25.5.1. Business Overview
25.5.2. Service Offerings
25.6. FUTURE GROUP (Cyclect Group + TSG Group)
25.6.1. Business Overview
25.6.2. Service Offerings
25.7. GAW CAPITAL
25.7.1. Business Overview
25.7.2. Service Offerings
25.8. I-BERHAD
25.8.1. Business Overview
25.8.2. Service Offerings
25.9. INFINAXIS DATA CENTRE
25.9.1. Business Overview
25.9.2. Service Offerings
25.10. INFRACROWD CAPITAL
25.10.1. Business Overview
25.10.2. Service Offerings
25.11. K2 DATA CENTRES
25.11.1. Business Overview
25.11.2. Service Offerings
25.12. MINORO ENERGI INDONESIA
25.12.1. Business Overview
25.12.2. Service Offerings
25.13. NAUTILUS DATA TECHNOLOGIES
25.13.1. Business Overview
25.13.2. Service Offerings
25.14. PURE DATA CENTRES GROUP
25.14.1. Business Overview
25.14.2. Service Offerings
25.15. YCO CLOUD
25.15.1. Business Overview
25.15.2. Service Offerings
25.16. YTL DATA CENTER
25.16.1. Business Overview
25.16.2. Service Offerings
25.17. YONDR
25.17.1. Business Overview
25.17.2. Service Offerings

26. QUANTITATIVE SUMMARY
26.1.1. Investment: Market Size & Forecast
26.1.2. Infrastructure: Market Size & Forecast
26.2. MARKET SEGMENTATION
26.2.1. Facility Type Investment: Market Size & Forecast
26.2.2. Facility Type Area: Market Size & Forecast
26.2.3. Facility Type Power Capacity: Market Size & Forecast
26.2.4. Electrical Infrastructure: Market Size & Forecast
26.2.5. Mechanical Infrastructure: Market Size & Forecast
26.2.6. Cooling Systems: Market Size & Forecast
26.2.7. Cooling Techniques: Market Size & Forecast
26.2.8. General Construction: Market Size & Forecast
26.2.9. Tier Standards: Market Size & Forecast
26.3. MARKET BY GEOGRAPHY
26.3.1. Investment: Market Size & Forecast
26.3.2. Area: Market Size & Forecast
26.3.3. Power Capacity: Market Size & Forecast
26.4. SINGAPORE
26.4.1. Investment: Market Size & Forecast
26.4.2. Infrastructure: Market Size & Forecast
26.5. INDONESIA
26.5.1. Investment: Market Size $ Forecast
26.5.2. Infrastructure: Market Size & Forecast
26.6. MALAYSIA
26.6.1. Investment: Market Size & Forecast
26.6.2. Infrastructure: Market Size & Forecast
26.7. THAILAND
26.7.1. Investment: Market Size & Forecast
26.7.2. Infrastructure: Market Size & Forecast
26.8. PHILIPPINES
26.8.1. Investment: Market Size & Forecast
26.8.2. Infrastructure: Market Size & Forecast
26.9. VIETNAM
26.9.1. Investment: Market Size & Forecast
26.9.2. Infrastructure: Market Size & Forecast
26.10. OTHER SOUTHEAST ASIAN COUNTRIES
26.10.1. Investment: Market Size & Forecast
26.10.2. Infrastructure: Market Size & Forecast

27. APPENDIX
27.1. LIST OF ABBREVIATIONS
27.2. SITE SELECTION CRITERIA
27.3. CURRENCY CONVERSION

LIST OF EXHIBITS

Exhibit 1: Market Derivation
Exhibit 2: Southeast Asia Data Center Construction Cost ($ million per MW)
Exhibit 3: Data Center Land Cost Across Cities in Southeast Asia ($ per Square Feet)
Exhibit 4: Data Center Power Cost Across Cities in Southeast Asia 2023 (per kW)
Exhibit 5: Internet Penetration Growth in Southeast Asian Countries 2021-2023 (% share)
Exhibit 6: Network Readiness Index 2023 Model
Exhibit 7: NRI Ranking 2023)
Exhibit 8: Impact of Key Driving Factors 2023 & 2029
Exhibit 9: Sustainability Targets by Few Data Center Operators in Southeast Asia
Exhibit 10: Impact of Key Growth Enablers 2023 & 2029
Exhibit 11: Benefits of Cloud Computing
Exhibit 12: Impact of Key Market Restraints 2023 & 2029
Exhibit 13: Southeast Asia Data Center Market Snapshot 2023
Exhibit 14: Southeast Asia Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 15: Southeast Asia Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 16: Southeast Asia Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 17: Southeast Asia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 18: Southeast Asia Data Center Market by Facility Type: Market Snapshot ($ million)
Exhibit 19: Southeast Asia Data Center Construction Market: Cumulative Investment Snapshot by Facility
Exhibit 20: Southeast Asia Data Center Market by Area: Snapshot (million square feet)
Exhibit 21: Southeast Asia Data Center Market: Cumulative Area Snapshot by Facility
Exhibit 22: Southeast Asia Data Center Market by Power Capacity: Snapshot (MW)
Exhibit 23: Southeast Asia Data Center Market: Cumulative Power Snapshot by Facility 2024-2029
Exhibit 24: Southeast Asia Data Center Market Upcoming Colocation Capacity As of March 2024 (MW)
Exhibit 25: Southeast Asia Colocation Data Center Market by Investment 2020-2029 ($ million)
Exhibit 26: Southeast Asia Colocation Data Center Market by Area (2020-2029) (thousand square feet)
Exhibit 27: Southeast Asia Colocation Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 28: Southeast Asia Hyperscale Data Center Market by Investment (2020-2029) ($ million)
Exhibit 29: Southeast Asia Hyperscale Data Center Market by Area 2020-2029 (thousand square feet)
Exhibit 30: Southeast Asia Hyperscale Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 31: Southeast Asia Enterprise Data Center Market by Investment 2020-2029 ($ million)
Exhibit 32: Southeast Asia Enterprise Data Center Market by Area 2020-2029 (thousand square feet)
Exhibit 33: Southeast Asia Enterprise Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 34: Southeast Asia Data Center Market by Infrastructure: Market Snapshot ($ million)
Exhibit 35: Southeast Asia Data Center Market: Cumulative Investment by Infrastructure:
Exhibit 36: Overview of the Data Center Construction Market in Southeast Asia by Infrastructure
Exhibit 37: Southeast Asia Data Center Construction Market by Electrical Infrastructure 2020-2029 ($ million)
Exhibit 38: Southeast Asia Data Center Construction Market by Mechanical Infrastructure 2020- 2029 ($ million)
Exhibit 39: Southeast Asia Data Center Construction Market by General Construction 2020- 2029 ($ million)
Exhibit 40: Southeast Asia Data Center Construction Market by Electrical Infrastructure: Market Snapshot ($ million)
Exhibit 41: Cumulative Investment Opportunities by Electrical Infrastructure 2024-2029
Exhibit 42: Overview of Southeast Asia Construction Market by Electrical Construction
Exhibit 43: Major Vendors
Exhibit 44: Southeast Asia Data Center Construction Market by UPS Systems 2020-2029 ($ million)
Exhibit 45: Southeast Asia Data Center Construction Market by Generators 2020-2029 ($ million)
Exhibit 46: Southeast Asia Data Center Construction Market by Transfer Switches & Switchgear 2020-2029 ($ million)
Exhibit 47: Southeast Asia Data Center Construction Market by PDUs 2020-2029 ($ million)
Exhibit 48: Southeast Asia Data Center Construction Market by Other Electrical Infrastructure 2020-2029 ($ million)
Exhibit 49: Southeast Asia Data Center Market by Mechanical Infrastructure: Market Snapshot ($ million)
Exhibit 50: Cumulative Investment Opportunity by Mechanical Infrastructure 2024-2029
Exhibit 51: Major Vendors
Exhibit 52: Southeast Asia Data Center Construction Market by Cooling Systems 2020-2029 ($ million)
Exhibit 53: Southeast Asia Data Center Construction Market by Racks 2020-2029 ($ million)
Exhibit 54: Southeast Asia Data Center Construction Market by Other Mechanical Infrastructure 2020-2029 ($ million)
Exhibit 55: Southeast Asia Data Center Construction Equipment Market: Market Snapshot ($ million)
Exhibit 56: Cumulative Investment Opportunity by Cooling Systems 2024-2029
Exhibit 57: Southeast Asia Data Center Construction Market by CRAC & CRAH Units 2020-2029 ($ million)
Exhibit 58: Southeast Asia Data Center Construction Market by Chiller Units 2020-2029 ($ million)
Exhibit 59: Southeast Asia Data Center Construction Market by Cooling Towers, Condensers & Dry Coolers 2020-2029 ($ million)
Exhibit 60: Southeast Asia Data Center Construction Market by Other Cooling Units 2020-2029 ($ million)
Exhibit 61: Southeast Asia Data Center Construction Market: Market Snapshot ($ million)
Exhibit 62: Southeast Asia Data Center Construction Market: Cumulative Investment Opportunity by Cooling Technique
Exhibit 63: Southeast Asia Data Center Construction Market by Cooling Technique: Overview
Exhibit 64: Southeast Asia Data Center Construction Market by Air-Based Cooling 2020-2029 ($ million)
Exhibit 65: Southeast Asia Data Center Construction Market by Liquid-Based Cooling 2020-2029 ($ million)
Exhibit 66: Southeast Asia Data Center Construction Market by General Construction: Market Snapshot ($ million)
Exhibit 67: Southeast Asia Data Center Construction Market Cumulative Investment Opportunity by General Construction 2024-2029
Exhibit 68: Overview of Southeast Asia Data Center Construction Market by General Construction
Exhibit 69: Southeast Asia Data Center Construction Market by Core & Shell Development 2020-2029 ($ million)
Exhibit 70: Southeast Asia Data Center Construction Market by Installation & Commissioning Services 2020-2029 ($ million)
Exhibit 71: Southeast Asia Data Center Construction Market by Engineering & Building Design 2020-2029 ($ million)
Exhibit 72: Southeast Asia Data Center Construction Market by Fire Detection & Suppression 2020-2029 ($ million)
Exhibit 73: Southeast Asia Data Center Construction Market by Physical Security 2020-2029 ($ billion)
Exhibit 74: Southeast Asia Data Center Construction Market by DCIM/BMS Solutions 2020-2029 ($ million)
Exhibit 75: Southeast Asia Data Center Construction Market by Tier Standard: Market Snapshot ($ million)
Exhibit 76: Southeast Asia Data Center Construction Market: Cumulative Investment Opportunity by Tier Standards 2024-2029
Exhibit 77: Overview of Southeast Asia Data Center Construction Market by Tier Standards
Exhibit 78: Southeast Asia Data Center Construction Market by Tier I & II 2020-2029 ($ million)
Exhibit 79: Southeast Asia Data Center Construction Market by Tier III 2020-2029 ($ million)
Exhibit 80: Southeast Asia Data Center Construction Market by Tier IV 2020-2029 ($ million)
Exhibit 81: Singapore Data Center Construction Market: Market Overview
Exhibit 82: Singapore Data Center Construction Market 2020-2029 ($ million)
Exhibit 83: Singapore Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 84: Singapore Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 85: Singapore Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 86: Indonesia Data Center Construction Market Overview
Exhibit 87: Indonesia Data Center Construction Market 2023-2029 ($ million)
Exhibit 88: Indonesia Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 89: Indonesia Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 90: Indonesia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 91: Malaysia Data Center Construction Market Overview
Exhibit 92: Malaysia Data Center Construction Market 2023-2029 ($ million)
Exhibit 93: Indonesia Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 94: Malaysia Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 95: Malaysia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 96: Thailand Data Center Construction Market Overview
Exhibit 97: Thailand Data Center Construction Market 2023-2029 ($ million)
Exhibit 98: Thailand Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 99: Thailand Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 100: Thailand Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 101: Philippines Data Center Construction Market Overview
Exhibit 102: Philippines Data Center Construction Market 2023-2029 ($ million)
Exhibit 103: Philippines Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 104: Philippines Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 105: Philippines Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 106: Vietnam Data Center Construction Market Overview
Exhibit 107: Vietnam Data Center Construction Market 2023-2029 ($ million)
Exhibit 108: Philippines Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 109: Vietnam Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 110: Vietnam Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 111: Other Southeast Asian Countries Data Center Construction Market Overview
Exhibit 112: Other Southeast Asian Countries Data Center Construction Market 2020-2029 ($ million)
Exhibit 113: Other Southeast Asian Countries Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 114: Other Southeast Asian Countries Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 115: Other Southeast Asian Countries Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 116: Site Selection Criteria

LIST OF EXHIBITS

Exhibit 1: Market Derivation
Exhibit 2: Southeast Asia Data Center Construction Cost ($ million per MW)
Exhibit 3: Data Center Land Cost Across Cities in Southeast Asia ($ per Square Feet)
Exhibit 4: Data Center Power Cost Across Cities in Southeast Asia 2023 (per kW)
Exhibit 5: Internet Penetration Growth in Southeast Asian Countries 2021-2023 (% share)
Exhibit 6: Network Readiness Index 2023 Model
Exhibit 7: NRI Ranking 2023)
Exhibit 8: Impact of Key Driving Factors 2023 & 2029
Exhibit 9: Sustainability Targets by Few Data Center Operators in Southeast Asia
Exhibit 10: Impact of Key Growth Enablers 2023 & 2029
Exhibit 11: Benefits of Cloud Computing
Exhibit 12: Impact of Key Market Restraints 2023 & 2029
Exhibit 13: Southeast Asia Data Center Market Snapshot 2023
Exhibit 14: Southeast Asia Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 15: Southeast Asia Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 16: Southeast Asia Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 17: Southeast Asia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 18: Southeast Asia Data Center Market by Facility Type: Market Snapshot ($ million)
Exhibit 19: Southeast Asia Data Center Construction Market: Cumulative Investment Snapshot by Facility
Exhibit 20: Southeast Asia Data Center Market by Area: Snapshot (million square feet)
Exhibit 21: Southeast Asia Data Center Market: Cumulative Area Snapshot by Facility
Exhibit 22: Southeast Asia Data Center Market by Power Capacity: Snapshot (MW)
Exhibit 23: Southeast Asia Data Center Market: Cumulative Power Snapshot by Facility 2024-2029
Exhibit 24: Southeast Asia Data Center Market Upcoming Colocation Capacity As of March 2024 (MW)
Exhibit 25: Southeast Asia Colocation Data Center Market by Investment 2020-2029 ($ million)
Exhibit 26: Southeast Asia Colocation Data Center Market by Area (2020-2029) (thousand square feet)
Exhibit 27: Southeast Asia Colocation Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 28: Southeast Asia Hyperscale Data Center Market by Investment (2020-2029) ($ million)
Exhibit 29: Southeast Asia Hyperscale Data Center Market by Area 2020-2029 (thousand square feet)
Exhibit 30: Southeast Asia Hyperscale Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 31: Southeast Asia Enterprise Data Center Market by Investment 2020-2029 ($ million)
Exhibit 32: Southeast Asia Enterprise Data Center Market by Area 2020-2029 (thousand square feet)
Exhibit 33: Southeast Asia Enterprise Data Center Market by Power Capacity 2020-2029 (MW)
Exhibit 34: Southeast Asia Data Center Market by Infrastructure: Market Snapshot ($ million)
Exhibit 35: Southeast Asia Data Center Market: Cumulative Investment by Infrastructure:
Exhibit 36: Overview of the Data Center Construction Market in Southeast Asia by Infrastructure
Exhibit 37: Southeast Asia Data Center Construction Market by Electrical Infrastructure 2020-2029 ($ million)
Exhibit 38: Southeast Asia Data Center Construction Market by Mechanical Infrastructure 2020- 2029 ($ million)
Exhibit 39: Southeast Asia Data Center Construction Market by General Construction 2020- 2029 ($ million)
Exhibit 40: Southeast Asia Data Center Construction Market by Electrical Infrastructure: Market Snapshot ($ million)
Exhibit 41: Cumulative Investment Opportunities by Electrical Infrastructure 2024-2029
Exhibit 42: Overview of Southeast Asia Construction Market by Electrical Construction
Exhibit 43: Major Vendors
Exhibit 44: Southeast Asia Data Center Construction Market by UPS Systems 2020-2029 ($ million)
Exhibit 45: Southeast Asia Data Center Construction Market by Generators 2020-2029 ($ million)
Exhibit 46: Southeast Asia Data Center Construction Market by Transfer Switches & Switchgear 2020-2029 ($ million)
Exhibit 47: Southeast Asia Data Center Construction Market by PDUs 2020-2029 ($ million)
Exhibit 48: Southeast Asia Data Center Construction Market by Other Electrical Infrastructure 2020-2029 ($ million)
Exhibit 49: Southeast Asia Data Center Market by Mechanical Infrastructure: Market Snapshot ($ million)
Exhibit 50: Cumulative Investment Opportunity by Mechanical Infrastructure 2024-2029
Exhibit 51: Major Vendors
Exhibit 52: Southeast Asia Data Center Construction Market by Cooling Systems 2020-2029 ($ million)
Exhibit 53: Southeast Asia Data Center Construction Market by Racks 2020-2029 ($ million)
Exhibit 54: Southeast Asia Data Center Construction Market by Other Mechanical Infrastructure 2020-2029 ($ million)
Exhibit 55: Southeast Asia Data Center Construction Equipment Market: Market Snapshot ($ million)
Exhibit 56: Cumulative Investment Opportunity by Cooling Systems 2024-2029
Exhibit 57: Southeast Asia Data Center Construction Market by CRAC & CRAH Units 2020-2029 ($ million)
Exhibit 58: Southeast Asia Data Center Construction Market by Chiller Units 2020-2029 ($ million)
Exhibit 59: Southeast Asia Data Center Construction Market by Cooling Towers, Condensers & Dry Coolers 2020-2029 ($ million)
Exhibit 60: Southeast Asia Data Center Construction Market by Other Cooling Units 2020-2029 ($ million)
Exhibit 61: Southeast Asia Data Center Construction Market: Market Snapshot ($ million)
Exhibit 62: Southeast Asia Data Center Construction Market: Cumulative Investment Opportunity by Cooling Technique
Exhibit 63: Southeast Asia Data Center Construction Market by Cooling Technique: Overview
Exhibit 64: Southeast Asia Data Center Construction Market by Air-Based Cooling 2020-2029 ($ million)
Exhibit 65: Southeast Asia Data Center Construction Market by Liquid-Based Cooling 2020-2029 ($ million)
Exhibit 66: Southeast Asia Data Center Construction Market by General Construction: Market Snapshot ($ million)
Exhibit 67: Southeast Asia Data Center Construction Market Cumulative Investment Opportunity by General Construction 2024-2029
Exhibit 68: Overview of Southeast Asia Data Center Construction Market by General Construction
Exhibit 69: Southeast Asia Data Center Construction Market by Core & Shell Development 2020-2029 ($ million)
Exhibit 70: Southeast Asia Data Center Construction Market by Installation & Commissioning Services 2020-2029 ($ million)
Exhibit 71: Southeast Asia Data Center Construction Market by Engineering & Building Design 2020-2029 ($ million)
Exhibit 72: Southeast Asia Data Center Construction Market by Fire Detection & Suppression 2020-2029 ($ million)
Exhibit 73: Southeast Asia Data Center Construction Market by Physical Security 2020-2029 ($ billion)
Exhibit 74: Southeast Asia Data Center Construction Market by DCIM/BMS Solutions 2020-2029 ($ million)
Exhibit 75: Southeast Asia Data Center Construction Market by Tier Standard: Market Snapshot ($ million)
Exhibit 76: Southeast Asia Data Center Construction Market: Cumulative Investment Opportunity by Tier Standards 2024-2029
Exhibit 77: Overview of Southeast Asia Data Center Construction Market by Tier Standards
Exhibit 78: Southeast Asia Data Center Construction Market by Tier I & II 2020-2029 ($ million)
Exhibit 79: Southeast Asia Data Center Construction Market by Tier III 2020-2029 ($ million)
Exhibit 80: Southeast Asia Data Center Construction Market by Tier IV 2020-2029 ($ million)
Exhibit 81: Singapore Data Center Construction Market: Market Overview
Exhibit 82: Singapore Data Center Construction Market 2020-2029 ($ million)
Exhibit 83: Singapore Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 84: Singapore Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 85: Singapore Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 86: Indonesia Data Center Construction Market Overview
Exhibit 87: Indonesia Data Center Construction Market 2023-2029 ($ million)
Exhibit 88: Indonesia Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 89: Indonesia Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 90: Indonesia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 91: Malaysia Data Center Construction Market Overview
Exhibit 92: Malaysia Data Center Construction Market 2023-2029 ($ million)
Exhibit 93: Indonesia Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 94: Malaysia Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 95: Malaysia Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 96: Thailand Data Center Construction Market Overview
Exhibit 97: Thailand Data Center Construction Market 2023-2029 ($ million)
Exhibit 98: Thailand Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 99: Thailand Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 100: Thailand Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 101: Philippines Data Center Construction Market Overview
Exhibit 102: Philippines Data Center Construction Market 2023-2029 ($ million)
Exhibit 103: Philippines Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 104: Philippines Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 105: Philippines Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 106: Vietnam Data Center Construction Market Overview
Exhibit 107: Vietnam Data Center Construction Market 2023-2029 ($ million)
Exhibit 108: Philippines Data Center Construction Market by Area 2023-2029 (thousand square feet)
Exhibit 109: Vietnam Data Center Construction Market by Power Capacity 2023-2029 (MW)
Exhibit 110: Vietnam Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 111: Other Southeast Asian Countries Data Center Construction Market Overview
Exhibit 112: Other Southeast Asian Countries Data Center Construction Market 2020-2029 ($ million)
Exhibit 113: Other Southeast Asian Countries Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 114: Other Southeast Asian Countries Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 115: Other Southeast Asian Countries Data Center Construction Market by Support Infrastructure 2020-2029 ($ million)
Exhibit 116: Site Selection Criteria

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE