South America Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts 2019 - 2029
Market Report I 2024-02-17 I 120 Pages I Mordor Intelligence
The South American data center construction market is projected to register a CAGR of 11.9%.
Key Highlights
-The upcoming IT load capacity in the region is expected to reach 1,806.4 MW by 2029 for under construction IT load capacity.
-The construction of raised floor area for data centers in the region is expected to reach 7.8 million sq. ft by 2029 for under construction raised floor space.
-The region's total number of racks to be installed is expected to reach 392,072 units by 2029, with Brazil expected to house the maximum number of racks by that time for planned racks.
-Currently, four submarine cable projects are under construction in the region. One such submarine cable, estimated to start service in 2025, is Caribbean Express (CX), stretching over 3472 kilometers with landing points from Cartagena, Colombia, for planned submarine cables.
South America Data Center Construction Market Trends
End User Outlook
- The cloud, telecom, and banking, financial services, and insurance (BFSI) end-user segments are expected to drive significant demand in the regional data center market. The demand for cloud services is promising in Brazil, Chile, Argentina, and other countries.
- In Argentina, the evolution of the legal and regulatory environment for cloud computing has been faster and more in line with recent technological developments compared to other regional countries. Recently, Amazon Web Services (AWS) announced plans to invest approximately USD 800 million over a decade in a new data center in Argentina.
- In the telecom end-user segment of the South American data center market, the regions of Latin America and the Caribbean are projected to amass around 398 million 5G connections by the year 2027. All municipalities in Brazil boasting a minimum of 200,000 residents are anticipated to be equipped with a 5G network, complete with at least one antenna, by July 31, 2026. The 5G spectrum auction held in Brazil in October 2021 garnered an impressive sum of approximately USD 8.5 billion.
- By the year 2035, the introduction of 5G technology in Brazil could potentially yield a substantial economic impact of USD 1.2 trillion, accompanied by a productivity surge amounting to USD 3 trillion. Furthermore, it is envisaged that approximately 10% of network connections across South America will transition to 5G by 2025.
- South America has witnessed a digital revolution in banking and financial services and is quickly adapting. The importance of fintech, neo-banks, and digital wallets across Latin America is rising. The abovementioned end-user segments are anticipated to record positive growth. At least 1,166 fintech initiatives are currently operating across 18 countries, with two out of three reporting to being in the advantage stages of development. Recent research by the Bank of America demonstrates that, in Brazil alone, in 2021, fintech providers such as Nubank, PagBank, Mercado Pago, Ame Digital, and Banco Pan had more than 95 million monthly active users, surpassing traditional Brazilian banks.
Brazil is projected to witness majority of data center construction activities during the forecast period
- Brazil and Chile hold the largest South American data center market shares. The Brazilian government provides incentives through the Regime Especial de Tributacao do Programa Nacional de Banda Larga (REPNBL) program, which includes incentives for purchasing infrastructure that help improve colocation services in the country.
- Brazil has witnessed an absolute growth of 40% in investments from the 2021 values due to investments from colocation providers such as Ascenty, Scala Data Centers, and ODATA and telecom operators such as GlobeNet Telecom, Ava Telecom, and Embratel. Sao Paulo, Brazil's significant financial capital, serves as the primary data center hub. Other cities, such as Rio de Janeiro and Fortaleza, are major investment locations in Brazil.
- Chile has competitive energy prices, primarily fueled by plans to take advantage of its natural renewable energy generation potential over the coming years. Energy costs have dropped to one-third of what they were five years ago, mainly based on renewable energy that now makes up 46% of the total produced.
- Chile traditionally has some of the region's best telecommunications infrastructure, and two major fiber projects are underway to ensure it will have a fully redundant fiber backbone. These include the state-funded Fibra Optica Austral (FOA) submarine cable connecting the deep south and Gtd's 3,500 km north-south submarine cable. In 2022, colocation operators, such as Scala Data Centers, ODATA, Ascenty (Digital Realty), and EdgeConneX, were the major investors in the Chilean data center market.
- In Argentina, Buenos Aires is the major investment destination, with the identified third-party facilities in the city contributing to over 90% of the existing power capacity. Most existing data centers are smaller facilities built over a limited area.
- The International Renewable Energy Agency (IRENA) stated that renewable energy contributed to around 33% of the overall electricity capacity in 2020 in Argentina, and the country aims to generate 20% of the electricity via renewable sources by 2025. The country aims to be one of the largest data center hubs in the coming time period.
South America Data Center Construction Industry Overview
The South American data center construction market is fairly fragmented, with significant players such as ABB, Legrand, AECOM, DRP Construction, and Fortis Construction.
In November 2022, Ascenty invested USD 290 million in constructing five new data centers in South America. The locations of the data centers are in Brazil, Chile, and Colombia.
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
1 INTRODUCTION
1.1 Study Assumption & Market Definition
1.2 Scope of the Study
2 Research Methodology
3 Executive Summary
4 Market Dynamics
4.1 Market Overview
4.2 Market Drivers
4.2.1 Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region
4.2.2 Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players
4.2.3 Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities
4.2.4 Growing Awareness on Modular Deployments and Increasing Rack Density
4.3 Market Restraints
4.3.1 Cost and Infrastructural Concerns Continue to be a Concern
4.3.2 Workforce-Related Challenges
4.4 Value Chain / Supply Chain Analysis
4.5 Industry Attractiveness - Porter's Five Forces Analysis
4.5.1 Threat of New Entrants
4.5.2 Bargaining Power of Buyers/Consumers
4.5.3 Bargaining Power of Suppliers
4.5.4 Threat of Substitute Products
4.5.5 Intensity of Competitive Rivalry
4.6 Assessment of COVID-19 Impact
5 Key Industry Statistics
5.1 Planned/Under Construction IT Load Capacity
5.2 Planned/Under Construction Raised Floor Space
5.3 Planned/Under Construction Submarine Cable
6 MARKET SEGMENTATION
6.1 Tier Type
6.1.1 Tier 1 and 2
6.1.2 Tier 3
6.1.3 Tier 4
6.2 Data Center Size
6.2.1 Small
6.2.2 Medium
6.2.3 Large
6.2.4 Mega
6.2.5 Massive
6.3 Infrastructure
6.3.1 Cooling Infrastructure
6.3.1.1 Air-based Cooling
6.3.1.2 Liquid-based Cooling
6.3.1.3 Evaporative Cooling
6.3.2 Power Infrastructure
6.3.2.1 UPS Systems
6.3.2.2 Generators
6.3.2.3 Power Distribution Unit (PDU)
6.3.3 Racks and Cabinets
6.3.4 Servers
6.3.5 Networking Equipment
6.3.6 Physical Security Infrastructure
6.3.7 Design and Consulting Services
6.3.8 Other Infrastructure
6.4 End-User
6.4.1 IT & Telecommunication
6.4.2 BFSI
6.4.3 Government
6.4.4 Healthcare
6.4.5 Other End User
6.5 Geography
6.5.1 Brazil
6.5.2 Chile
6.5.3 Rest of South America
7 COMPETITIVE LANDSCAPE
7.1 Company Profiles
7.1.1 Turner Construction Co.
7.1.2 DPR Construction Inc.
7.1.3 Fortis Construction
7.1.4 ZFB Group
7.1.5 Aceco TI
7.1.6 AECOM Limited
7.1.7 Constructora Sudamericana S.A
7.1.8 HostDime Brasil
7.1.9 CyrusOne Inc.
7.1.10 RITTAL Sistemas Eletromecanicos Ltda. (Rittal GmbH & Co. KG)
7.1.11 Nakano Corporation
7.1.12 Legrand
7.1.13 Delta Group
7.1.14 Ascenty Data Centers E Telecomunicacoes
7.1.15 Equinix Inc.
7.1.16 NetApp Inc.
7.1.17 Oracle Corporation
7.1.18 Pure Storage Inc.
8 INVESTMENT ANALYSIS
9 MARKET OPPORTUNITIES AND FUTURE TRENDS
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.