Singapore Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026 - 2031)
Market Report I 2026-02-09 I 180 Pages I Mordor Intelligence
Singapore Data Center Construction Market Analysis
The Singapore data center construction market is expected to grow from USD 4.56 billion in 2025 to USD 4.77 billion in 2026 and is forecast to reach USD 6.01 billion by 2031 at 4.70% CAGR over 2026-2031. Singapore's tightly managed power-allocation policy, robust subsea connectivity, and status as a financial hub anchor sustained investment even as operators confront land scarcity and high build costs. Regulatory momentum under the Green Data Centre Roadmap encourages designs that achieve Power Usage Effectiveness (PUE) of 1.3 or better, reshaping tender specifications and equipment choices. Hyperscalers continue to deploy GPU-dense infrastructure that pushes average rack power beyond 50 kW, accelerating demand for advanced switchgear, liquid cooling, and modular prefabrication. Meanwhile, the twin-hub strategy that links Singapore with Johor mitigates local constraints by allowing capacity spill-over while preserving sub-5 ms latency to core workloads. Investor appetite for data-center REITs supports a healthy project finance pipeline, helping developers offset the city-state's premium land and labor costs.
Singapore Data Center Construction Market Trends and Insights
Power-Allocation Release Under Green DC Roadmap
Singapore's revised Green Data Centre Roadmap commits at least 300 MW of new IT load on the condition that facilities demonstrate PUE of 1.3 or lower, pivoting the Singapore data center construction market toward highly efficient designs. Two-thirds of the quota rewards projects that integrate renewables or alternative backup fuels, prompting developers to specify hydrogen-ready generators and heat-recovery chillers. Early movers have implemented AI-driven cooling control to reduce energy use by up to 30%. Competitive bidding for scarce megawatts intensifies, raising design consultancy demand and favoring firms with a proven sustainability track record. Over the medium term, the policy accelerates the market's migration toward liquid cooling and on-site solar plus energy-storage hybrids. These elements together enlarge the addressable opportunity for specialist contractors and equipment vendors within the Singapore data center construction market.
Surge in AI/GPU-Dense Workloads Requiring New Build Specs
The generative-AI wave lifts rack densities above 50 kW, forcing mechanical and electrical packages in the Singapore data center construction market to pivot toward immersion and direct-to-chip cooling. A major campus upgrade showcases this shift, featuring chilled-water and liquid-cooling loops designed for 27 C set-points. High-density deployment elongates cable runs and upsizes busways, which increases bill-of-materials value yet lengthens commissioning time by 15-20%. Developers respond by adopting rear-door heat exchangers and medium-voltage (22 kV) power distribution to reduce copper usage. As AI inferencing proliferates across finance, healthcare, and public-sector workloads, construction pipelines increasingly bundle specialized white space for GPU pods, helping the Singapore data center construction market sustain double-digit project count growth despite the national power cap.
Tight 300 MW Annual Power Quota and Moratorium Legacy
Singapore's power-allocation ceiling, reinstated in 2024 after a three-year moratorium, falls below regional demand growth, stalling many planned hyperscale builds. Developers must compete in a Call-for-Application process whose scoring heavily weights PUE and carbon intensity, inflating pre-construction consultancy fees. The scarcity of megawatts drove some operators to shift incremental capacity to Batam or Johor, dampening the full revenue potential of the Singapore data center construction market. Long-term uncertainty also complicates transformer and generator ordering cycles, with lead times already stretched by global supply constraints. Together, these factors shave an estimated 1.4 percentage points from forecast CAGR.
Other drivers and restraints analyzed in the detailed report include:
Hyperscaler "Singapore-plus-Johor" Twin-Hub Build StrategiesAccelerating Sovereign-Cloud and MAS FSI Localization RulesHighest APAC Construction Cost and Premium Power Tariffs
For complete list of drivers and restraints, kindly check the Table Of Contents.
Segment Analysis
The electrical package accounted for 37.38% of overall spend within the Singapore data center construction market in 2025, reflecting hyperscaler preference for 22 kV feeds, intelligent switchgear, and high-capacity busways designed for GPU racks running at 50 kW and above. Liquid-based cooling, though still a subset of mechanical infrastructure, is the fastest-growing line item and will contribute USD 628.5 million to the Singapore data center construction market size by 2031. Adoption of immersion tanks and rear-door heat exchangers reduces white-space real estate per rack, enabling higher revenue density for colocation operators. Services such as design-build integration and commissioning enjoy premium billing rates because owners demand turnkey validation of PUE targets. Over the forecast window, integration between electrics and controls will deepen as AI-driven optimization platforms require real-time telemetry from both power and cooling loops. This convergence elevates the strategic value of firms that can span electrical and mechanical scopes in a single contract, cementing their competitive position within the Singapore data center construction market.
The mechanical segment is evolving from traditional chillers toward pumped refrigerant and dielectric immersion systems capable of dissipating 1,200 W per chip. A joint program cut cooling energy by 29%, saving roughly USD 25,000 per rack annually and setting a cost-avoidance benchmark other operators now target. General construction remains a steady contributor driven by multi-story shells, seismic reinforcement, and blast-resistant facades required under Singapore's stringent codes. IT infrastructure-racks, network fabric, and cable management-captures incremental spend as high-density layouts demand thicker fiber trunks and AI-optimized topologies. Collectively, these shifts underscore how rising workload complexity expands wallet share for specialized subcontractors in the Singapore data center construction market.
Tier III facilities delivered 53.22% of the Singapore data center construction market share in 2025 thanks to their balanced cost-reliability proposition and 99.982% uptime guarantee. Enterprises and cloud providers value concurrently maintainable infrastructure that supports live upgrades without the doubled capex of 2N systems. Nevertheless, Tier IV pipelines are expanding at 5.03% CAGR, fueled by fintech, trading desks, and sovereign-cloud workloads that demand 99.995% availability. These fault-tolerant sites typically deploy 2N UPS, dual fuel farms, and independent chilled-water plants, doubling MEP scope relative to Tier III and lifting the Singapore data center construction market size for high-tier builds.
Iron Mountain's Singapore facility typifies Tier IV attributes with three geographically diverse meet-me-rooms and bio-protected access corridors. Although Tier I and II projects persist in edge or telco applications, their contribution to revenue remains marginal. Over time, regulatory and customer pressure for resilience is expected to pull Tier III specifications closer to Tier IV, blurring distinctions and increasing the baseline spend per megawatt across the Singapore data center construction market.
The Singapore Data Center Construction Market is Segmented by Infrastructure (Electrical Infrastructure, Mechanical Infrastructure, and More), Tier Standard (Tier I and II, Tier III, and More), Data Center Type (Colocation, Hyperscale, and More), End User Industry (Banking, Financial Services, Insurance, IT and Telecommunications, and More). The Market Forecasts are Provided in Terms of Value (USD).
List of Companies Covered in this Report:
Boustead Projects Dragages Singapore (Bouygues) Takenaka Corp. Gammon Pte Ltd (Balfour Beatty) Sato Kogyo Kajima Overseas Asia Woh Hup (Private) Ltd China Construction (South Pacific) Dev. SsangYong Engineering and Construction Hyundai Engineering and Construction Obayashi Singapore Lendlease Singapore Keppel Data Centre Development ST Telemedia Global DC Equinix Construction Services Digital Realty (Digital Singapore) AIMS APAC REIT (DC builder arm) NTT Global DC Singapore M1 Net / Keppel DC and M1 JV AirTrunk (Blackstone) EdgeConneX Princeton Digital Group Microsoft (self-build campus) Amazon Web Services - Construction Ops Google Singapore DC Projects
Additional Benefits:
1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study
2 RESEARCH METHODOLOGY
3 EXECUTIVE SUMMARY
4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Market Drivers
4.2.1 Power-allocation release under Green DC Roadmap (2024-)
4.2.2 Surge in AI / GPU-dense workloads requiring new build specs
4.2.3 Hyperscaler "Singapore-plus-Johor" twin-hub build strategies
4.2.4 Accelerating sovereign-cloud and MAS FSI localization rules
4.2.5 Investor appetite for DC-REIT conversions (Keppel DC, NTT DC REIT)
4.2.6 Modular prefabrication to compress build-times amid land caps
4.3 Market Restraints
4.3.1 Tight 300 MW annual power quota and moratorium legacy
4.3.2 Highest APAC construction cost US USD 11.7 m/MW and 19/kWh tariffs
4.3.3 Scarce brown-field plots; feasibility of underground / high-rise still unproven
4.3.4 Skilled MEP labour crunch inflating project timelines
4.4 Value / Supply-Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook
4.7 Porter's Five Forces
4.7.1 Bargaining Power of Suppliers
4.7.2 Bargaining Power of Buyers
4.7.3 Threat of New Entrants
4.7.4 Threat of Substitutes
4.7.5 Intensity of Competitive Rivalry
4.8 Key Singapore Data-Center Construction Statistics
4.8.1 Data Centers Total Installed Capacity (MW) in the Singapore , 2023 and 2024
4.8.2 Total IT Load Under Construction in the Singapore, MW, 2025 - 2030
4.8.3 Average Capex and Opex for the Singapore Data Center Construction
4.8.4 Top Capex Spenders on Data Center Infrastructure in the Singapore
5 MARKET SIZE AND GROWTH FORECASTS
5.1 By Infrastructure
5.1.1 Electrical Infrastructure
5.1.1.1 Power Distribution Solutions
5.1.1.1.1 Power Distribution Units
5.1.1.1.2 Switchgears
5.1.1.1.3 Others
5.1.1.2 Power Backup Solutions
5.1.1.2.1 UPS
5.1.1.2.2 Generators
5.1.2 Mechanical Infrastructure
5.1.2.1 Cooling Systems
5.1.2.1.1 Liquid-based Cooling
5.1.2.1.2 Air-based Cooling
5.1.2.2 Racks and Cabinets
5.1.2.3 Other Mechanical Infrastructure
5.1.3 IT Infrastructure
5.1.3.1 Servers
5.1.3.2 Storage
5.1.3.3 Other IT Infrastructure
5.1.4 General Construction
5.1.5 Services
5.1.5.1 Design and Consulting
5.1.5.2 Integration
5.1.5.3 Support and Maintenance
5.2 By Tier Standard
5.2.1 Tier I and II
5.2.2 Tier III
5.2.3 Tier IV
5.3 By End-User Industry
5.3.1 Banking, Financial Services and Insurance
5.3.2 IT and Telecommunications
5.3.3 Government and Defense
5.3.4 Healthcare
5.3.5 Other End Users
5.4 By Data Center Type
5.4.1 Colocation Facilities
5.4.2 Hyperscale / Self-built
5.4.3 Enterprise / Edge / Modular
6 COMPETITIVE LANDSCAPE
6.1 Market Share Analysis
6.2 Company Profiles (includes Global-level Overview, Market-level Overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)
6.2.1 Boustead Projects
6.2.2 Dragages Singapore (Bouygues)
6.2.3 Takenaka Corp.
6.2.4 Gammon Pte Ltd (Balfour Beatty)
6.2.5 Sato Kogyo
6.2.6 Kajima Overseas Asia
6.2.7 Woh Hup (Private) Ltd
6.2.8 China Construction (South Pacific) Dev.
6.2.9 SsangYong Engineering and Construction
6.2.10 Hyundai Engineering and Construction
6.2.11 Obayashi Singapore
6.2.12 Lendlease Singapore
6.2.13 Keppel Data Centre Development
6.2.14 ST Telemedia Global DC
6.2.15 Equinix Construction Services
6.2.16 Digital Realty (Digital Singapore)
6.2.17 AIMS APAC REIT (DC builder arm)
6.2.18 NTT Global DC Singapore
6.2.19 M1 Net / Keppel DC and M1 JV
6.2.20 AirTrunk (Blackstone)
6.2.21 EdgeConneX
6.2.22 Princeton Digital Group
6.2.23 Microsoft (self-build campus)
6.2.24 Amazon Web Services - Construction Ops
6.2.25 Google Singapore DC Projects
7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK
7.1 White-space and Unmet-Need Assessment
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.