Opportunities Preloader

Please Wait.....

Report

Philippines Data Centre Construction Market Report and Forecast 2025-2034

Market Report I 2025-06-06 I 109 Pages I EMR Inc.

The Philippines data centre construction market reached around USD 271.60 Million in 2024. The market is projected to grow at a CAGR of 11.80% between 2025 and 2034 to reach USD 828.61 Million by 2034.

Philippines Data Centre Construction Market Growth

The increasing focus on speed and creativity in modern data centres has expedited the demand for prefabricated data centre buildings, which lower construction costs by 10%-30% while reducing waste generation and energy consumption. For constructing hyperscale data centres, a hybrid approach of traditional building and construction of prefabricated modules is expected to become popular, due to its cost-effectiveness and quick completion time.

Digital project management platforms, big data analytics, and traditional building information modelling systems are expected to transform the market. Extended reality (58%) and artificial intelligence and machine learning (59%) are expected to witness widespread adoption among data centre construction companies in the Philippines, which can aid in optimum resource allocation, project scheduling, and site safety monitoring.

Advancements in the field of quantum computing are expected to accelerate the energy requirements of upcoming data centres over the forecast period. This is expected to prompt companies to deploy small-size nuclear power reactors, and other renewable energy sources like wind and solar power to ensure that high electricity requirements are met sustainably without compromising on the performance of data centre equipment. Data centre construction companies are expected to play a key role in driving sustainable change in the market.

Philippines Data Centre Construction Industry Segmentation

Philippines Data Centre Construction Market Report and Forecast 2025-2034 offers a detailed analysis of the market based on the following segments:

Market Breakup by Infrastructure

- Electrical Infrastructure_x000D_ _x000D_ UPS Systems _x000D_ Others _x000D_ _x000D_
- Electrical Infrastructure_x000D_ _x000D_ UPS Systems _x000D_ Others _x000D_ _x000D_
- Mechanical Infrastructure_x000D_ _x000D_ Cooling Systems _x000D_ Racks _x000D_ Others _x000D_ _x000D_
- General Infrastructure

- Mechanical Infrastructure_x000D_ _x000D_ Cooling Systems _x000D_ Racks _x000D_ Others _x000D_ _x000D_
- Electrical Infrastructure_x000D_ _x000D_ UPS Systems _x000D_ Others _x000D_ _x000D_
- Mechanical Infrastructure_x000D_ _x000D_ Cooling Systems _x000D_ Racks _x000D_ Others _x000D_ _x000D_
- General Infrastructure

- General Infrastructure

Market Breakup by Size

- Small and Medium-Size Data Center
- Large-Size Data Center

Market Breakup by Tier Type

- Tier I and II
- Tier III
- Tier IV

Market Breakup by End Use

- BFSI
- IT and Telecom
- Government and Defence
- Healthcare
- Others

Philippines Data Centre Construction Market Share

Based on end use, the market is segmented into BFSI, IT and telecom, government and defence, and healthcare, among others. Over the forecast period, IT and Telecom and BFSI are expected to grow at a CAGR of 13.2% and 12.3% respectively.

Leading Companies in the Philippines Data Centre Construction Market

Major data centre construction companies in the Philippines are boosting their investments in the adoption of digital technologies, to reduce their reliance on human labour, enhance productivity, and handle multiple construction projects simultaneously.

- AECOM

- EdgeConneX, Inc.

- Fujitsu Ltd.

- NTT Ltd.

- Schneider Electric SE

- Megawide Construction Corporation

- Space DC Pte Ltd.

- Vertiv Holdings Co.

- DataOne

- Others

Philippines Data Centre Construction MarketReport Snapshots

Philippines Data Centre ConstructionMarket Size

Philippines Data Centre Construction Market Growth

Philippines Data Centre ConstructionMarket Share

Philippines Data Centre ConstructionCompanies

1 Executive Summary
1.1 Market Size 2024-2025
1.2 Market Growth 2025(F)-2034(F)
1.3 Key Demand Drivers
1.4 Key Players and Competitive Structure
1.5 Industry Best Practices
1.6 Recent Trends and Developments
1.7 Industry Outlook
2 Market Overview and Stakeholder Insights
2.1 Market Trends
2.2 Key Verticals
2.3 Key Regions
2.4 Supplier Power
2.5 Buyer Power
2.6 Key Market Opportunities and Risks
2.7 Key Initiatives by Stakeholders
3 Economic Summary
3.1 GDP Outlook
3.2 GDP Per Capita Growth
3.3 Inflation Trends
3.4 Democracy Index
3.5 Gross Public Debt Ratios
3.6 Balance of Payment (BoP) Position
3.7 Population Outlook
3.8 Urbanisation Trends
4 Country Risk Profiles
4.1 Country Risk
4.2 Business Climate
5 Asia Pacific Data Center Construction Market Overview
5.1 Key Industry Highlights
5.2 Asia Pacific Data Center Construction Historical Market (2018-2024)
5.3 Asia Pacific Data Center Construction Market Forecast (2025-2034)
6 Philippines Data Center Construction Market Overview
6.1 Key Industry Highlights
6.2 Philippines Data Center Construction Historical Market (2018-2024)
6.3 Philippines Data Center Construction Market Forecast (2025-2034)
7 Philippines Data Center Construction Market by Infrastructure
7.1 Electrical Infrastructure
7.1.1 Historical Trend (2018-2024)
7.1.2 Forecast Trend (2025-2034)
7.1.3 Breakup by Type
7.1.3.1 UPS Systems
7.1.3.2 Others
7.2 Mechanical Infrastructure
7.2.1 Historical Trend (2018-2024)
7.2.2 Forecast Trend (2025-2034)
7.2.3 Breakup by Type
7.2.3.1 Cooling Systems
7.2.3.2 Racks
7.2.3.3 Others
7.3 General Infrastructure
7.3.1 Historical Trend (2018-2024)
7.3.2 Forecast Trend (2025-2034)
8 Philippines Data Center Construction Market by Size
8.1 Small and Medium-Size Data Center
8.1.1 Historical Trend (2018-2024)
8.1.2 Forecast Trend (2025-2034)
8.2 Large Data Center
8.2.1 Historical Trend (2018-2024)
8.2.2 Forecast Trend (2025-2034)
9 Philippines Data Center Construction Market by Tier Type
9.1 Tier I and II
9.1.1 Historical Trend (2018-2024)
9.1.2 Forecast Trend (2025-2034)
9.2 Tier III
9.2.1 Historical Trend (2018-2024)
9.2.2 Forecast Trend (2025-2034)
9.3 Tier IV
9.3.1 Historical Trend (2018-2024)
9.3.2 Forecast Trend (2025-2034)
10 Philippines Data Center Construction Market by End Use
10.1 BFSI
10.1.1 Historical Trend (2018-2024)
10.1.2 Forecast Trend (2025-2034)
10.2 IT and Telecom
10.2.1 Historical Trend (2018-2024)
10.2.2 Forecast Trend (2025-2034)
10.3 Government and Defense
10.3.1 Historical Trend (2018-2024)
10.3.2 Forecast Trend (2025-2034)
10.4 Healthcare
10.4.1 Historical Trend (2018-2024)
10.4.2 Forecast Trend (2025-2034)
10.5 Others
11 Market Dynamics
11.1 SWOT Analysis
11.1.1 Strengths
11.1.2 Weaknesses
11.1.3 Opportunities
11.1.4 Threats
11.2 Porter's Five Forces Analysis
11.2.1 Supplier's Power
11.2.2 Buyer's Power
11.2.3 Threat of New Entrants
11.2.4 Degree of Rivalry
11.2.5 Threat of Substitutes
11.3 Key Indicators for Demand
11.4 Key Indicators for Price
12 Competitive Landscape
12.1 Supplier Selection
12.2 Key Global Players
12.3 Key Regional Players
12.4 Key Player Strategies
12.5 Company Profiles
12.5.1 AECOM
12.5.1.1 Company Overview
12.5.1.2 Product Portfolio
12.5.1.3 Demographic Reach and Achievements
12.5.1.4 Certifications
12.5.2 EdgeConneX, Inc.
12.5.2.1 Company Overview
12.5.2.2 Product Portfolio
12.5.2.3 Demographic Reach and Achievements
12.5.2.4 Certifications
12.5.3 Fujitsu Ltd.
12.5.3.1 Company Overview
12.5.3.2 Product Portfolio
12.5.3.3 Demographic Reach and Achievements
12.5.3.4 Certifications
12.5.4 NTT Ltd.
12.5.4.1 Company Overview
12.5.4.2 Product Portfolio
12.5.4.3 Demographic Reach and Achievements
12.5.4.4 Certifications
12.5.5 Schneider Electric SE
12.5.5.1 Company Overview
12.5.5.2 Product Portfolio
12.5.5.3 Demographic Reach and Achievements
12.5.5.4 Certifications
12.5.6 Megawide Construction Corporation
12.5.6.1 Company Overview
12.5.6.2 Product Portfolio
12.5.6.3 Demographic Reach and Achievements
12.5.6.4 Certifications
12.5.7 Space DC Pte Ltd.
12.5.7.1 Company Overview
12.5.7.2 Product Portfolio
12.5.7.3 Demographic Reach and Achievements
12.5.7.4 Certifications
12.5.8 Vertiv Holdings Co.
12.5.8.1 Company Overview
12.5.8.2 Product Portfolio
12.5.8.3 Demographic Reach and Achievements
12.5.8.4 Certifications
12.5.9 DataOne
12.5.9.1 Company Overview
12.5.9.2 Product Portfolio
12.5.9.3 Demographic Reach and Achievements
12.5.9.4 Certifications
12.5.10 Others

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE