Philippines Data Center Construction Market, By Tier Type (Tier 1 & 2, Tier 3 & Tier 4), By Data Center Size (Small, Medium, Large, Massive, Mega), By Infrastructure (Cooling Infrastructure, Power Infrastructure, Others), By End User (IT & Telecommunication, BFSI, Government, Healthcare, Others) By Region, Competition, Forecast & Opportunities, 2019-2029F

Market Report I 2024-09-29 I 85 Pages I TechSci Research

Philippines Data Center Construction Market was valued at USD 298 Million in 2023 and is expected to reach USD 539 Million by 2029 with a CAGR of 10.25% during the forecast period. The Data Center Construction market encompasses the industry involved in the design, planning, and building of facilities that house critical computing infrastructure and data storage systems. Data centers are pivotal for managing and processing vast amounts of data and are essential for supporting a range of services, including cloud computing, web hosting, and enterprise applications. The market includes activities related to the construction of both new data centers and the expansion or renovation of existing facilities. Key components of data center construction involve structural design, electrical and mechanical systems, cooling solutions, and network connectivity. The market is influenced by factors such as the growing demand for data storage and processing capabilities, advancements in technology, and the need for increased energy efficiency and security measures. Companies in this sector typically include construction firms, engineering consultants, and specialized contractors. As digital transformation accelerates across various industries, the data center construction market continues to expand, driven by the need for more robust, scalable, and reliable data infrastructure solutions.
Key Market Drivers
Increasing Digital Transformation
The Philippines' data center construction market is experiencing robust growth due to the accelerating digital transformation across various sectors. As businesses and government agencies increasingly adopt digital technologies, there is a heightened demand for sophisticated data management and processing solutions. This transformation is driven by the proliferation of cloud computing, big data analytics, and the Internet of Things (IoT), all of which necessitate substantial data storage and processing capabilities.
Organizations are investing in data centers to support their digital strategies, enabling them to handle large volumes of data efficiently and securely. The rise of e-commerce, online banking, and digital communication platforms further fuels the demand for data center infrastructure, as these services require reliable and scalable data storage solutions. Furthermore, the Philippines' growing tech startup ecosystem contributes to this demand, with new companies emerging that require robust data infrastructure to operate effectively. Additionally, the Philippine government has been actively promoting digital transformation initiatives as part of its broader economic development plans. Policies aimed at enhancing the country's digital infrastructure and encouraging technological innovation are contributing to the increased construction of data centers. As businesses and public institutions adopt new technologies, the need for modern, high-capacity data centers to support these advancements becomes critical.
The combination of private sector investment and government support creates a favorable environment for the growth of the data center construction market. Companies are increasingly recognizing the strategic importance of investing in data center infrastructure to maintain competitive advantages and ensure business continuity. Consequently, the demand for new data centers and the expansion of existing ones are expected to remain strong, driving market growth in the Philippines.
Growing Demand for Cloud Services
The expansion of cloud computing services is a significant driver of the Philippines' data center construction market. Cloud services, including Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS), are becoming increasingly popular among businesses of all sizes. This growing adoption of cloud solutions necessitates a corresponding increase in data center infrastructure to support the storage, processing, and management of vast amounts of data.
As organizations transition from traditional on-premises IT systems to cloud-based solutions, they require data centers that can provide the high levels of scalability, flexibility, and security that cloud services demand. Cloud service providers are expanding their data center footprints to meet the needs of their clients, driving significant investments in new construction projects. The rise of hybrid and multi-cloud environments also contributes to this demand, as businesses seek data centers that can seamlessly integrate with various cloud platforms. Moreover, the increasing reliance on cloud-based applications for business operations, customer interactions, and data analytics highlights the critical need for robust and reliable data center infrastructure. The Philippines' growing digital economy is a key factor in the expansion of cloud services, as more businesses and individuals embrace digital tools and platforms.
The demand for cloud services is also being driven by the need for cost efficiency and operational flexibility. Cloud solutions offer businesses the ability to scale resources up or down as needed, reducing the need for significant capital investment in physical IT infrastructure. This shift towards cloud-based models is prompting a surge in data center construction to accommodate the growing requirements of cloud service providers.
In response to this trend, data center operators are focusing on developing state-of-the-art facilities with advanced technologies to support the evolving needs of cloud services. The expansion of cloud services in the Philippines is expected to continue driving the growth of the data center construction market, as businesses and cloud providers seek to build and maintain high-performance data centers.
Increasing Internet Penetration and Digital Connectivity
The rapid growth in internet penetration and digital connectivity in the Philippines is a major driver of the data center construction market. As more individuals and businesses gain access to high-speed internet and digital technologies, the demand for data center infrastructure to support these digital activities is rising.
The expansion of internet connectivity is facilitating the growth of various online services, including social media, streaming platforms, and e-commerce. This increased online activity generates vast amounts of data that need to be stored, processed, and managed effectively. Data centers play a crucial role in handling this data and ensuring that digital services run smoothly and efficiently. Additionally, the Philippine government's efforts to improve digital infrastructure and expand internet access across the country are contributing to the growth of the data center market. Initiatives aimed at enhancing broadband coverage and promoting digital inclusivity are driving increased internet usage and connectivity. As more regions and communities gain access to high-speed internet, the demand for local data center facilities to support these new users and businesses grows.
The rise in digital connectivity is also supporting the development of smart cities and IoT applications, which rely on data centers to manage and analyze data from connected devices. Smart city projects and IoT initiatives are becoming more prevalent in the Philippines, creating additional demand for data center infrastructure to support these technologies. Moreover, the growth of mobile internet usage and the increasing number of internet-enabled devices contribute to the need for expanded data center capacity. As the digital landscape evolves, data centers are essential for ensuring reliable and high-performance connectivity for users and businesses across the country.
The combination of increased internet penetration, government initiatives, and the rise of digital technologies is driving significant growth in the data center construction market in the Philippines. Data center operators are investing in new facilities to meet the demands of a rapidly evolving digital environment and ensure that connectivity needs are met.
Strategic Location and Investment Opportunities
The strategic geographic location of the Philippines, coupled with its growing economy and favorable investment climate, is a key driver of the data center construction market. The country's position as a gateway between major Asian markets makes it an attractive destination for data center operators looking to establish a presence in the region.
The Philippines offers several advantages for data center investment, including its stable political environment, relatively low cost of doing business, and competitive energy prices. These factors make it an appealing location for both local and international data center operators seeking to expand their operations in Southeast Asia. Furthermore, the government's proactive approach to promoting foreign investment and supporting infrastructure development contributes to the growth of the data center market. Policies and incentives aimed at attracting investment in critical infrastructure, including data centers, help create a favorable environment for construction and development.
The increasing interest from global technology companies and cloud service providers in establishing data centers in the Philippines is also driving market growth. These companies recognize the strategic value of the Philippines as a hub for regional operations and are investing in data center facilities to support their expansion plans. Additionally, the growth of the Philippine economy and the increasing demand for digital services are creating opportunities for data center development. As businesses and organizations in the country seek to enhance their IT infrastructure and improve their digital capabilities, the need for modern, high-performance data centers becomes more pronounced.
The combination of strategic location, favorable investment conditions, and economic growth makes the Philippines an attractive market for data center construction. The influx of investment and the establishment of new data centers are expected to continue driving the growth of the market in the coming years.
Key Market Challenges
Infrastructure and Utility Constraints
One of the significant challenges facing the data center construction market in the Philippines is the limitations and constraints related to infrastructure and utility services. Data centers require a reliable and robust infrastructure to operate efficiently, including stable power supply, adequate cooling systems, and high-speed network connectivity. However, the country faces several issues in these areas that impact the development and operation of data centers.
Power supply is a critical concern, as data centers are highly energy-intensive and require continuous, uninterrupted electricity to ensure optimal performance and avoid downtime. In the Philippines, while there have been improvements in the power sector, issues such as power outages, voltage fluctuations, and the high cost of electricity can pose challenges. Data center operators often need to invest in backup power solutions, such as generators and uninterruptible power supplies (UPS), which can increase the overall cost of construction and operation.
Cooling systems are another vital component of data center infrastructure, as they are necessary to maintain optimal operating temperatures for servers and other equipment. The Philippines' tropical climate presents challenges for cooling systems, requiring more energy to manage heat compared to temperate regions. This increased energy consumption can further strain the power supply and elevate operational costs for data centers.
In terms of network connectivity, while the Philippines has made strides in expanding its internet infrastructure, there are still areas where connectivity is inconsistent or limited. Data centers rely on high-speed, reliable network connections to support data transfer and communication. In regions with underdeveloped connectivity infrastructure, data center operators may face difficulties in ensuring the necessary network performance and redundancy.
Addressing these infrastructure and utility constraints requires coordinated efforts between data center operators, government authorities, and utility providers. Investments in upgrading power infrastructure, improving cooling technologies, and enhancing network connectivity are essential to overcoming these challenges and supporting the growth of the data center construction market in the Philippines.
Regulatory and Permitting Challenges
Another significant challenge in the Philippines' data center construction market is navigating the complex regulatory and permitting landscape. The process of obtaining the necessary approvals and permits for data center construction can be time-consuming and challenging, impacting project timelines and increasing costs.
The regulatory environment in the Philippines includes various national and local regulations that govern land use, building codes, environmental compliance, and other aspects of data center construction. Navigating these regulations requires careful planning and coordination with multiple government agencies. The need to comply with different regulatory requirements can lead to delays in obtaining permits and approvals, which can affect project schedules and budgets.
One of the key regulatory challenges is the need to secure environmental clearances. Data centers are subject to environmental regulations to ensure that their operations do not negatively impact the surrounding environment. This includes compliance with regulations related to waste management, energy consumption, and emissions. The process of obtaining environmental clearances can be complex and may require detailed impact assessments and consultations with environmental authorities. Additionally, zoning and land use regulations can pose challenges for data center construction. In some areas, there may be restrictions on the types of developments allowed or specific requirements for land use that need to be addressed. Securing the appropriate zoning approvals and ensuring that the proposed data center aligns with local land use plans can be a lengthy and intricate process.
To mitigate these regulatory and permitting challenges, data center operators need to engage with experienced legal and regulatory experts who can navigate the complexities of the permitting process. Building strong relationships with government agencies and staying informed about regulatory changes are also crucial for ensuring compliance and minimizing delays. Despite these challenges, addressing regulatory and permitting issues is essential for successful data center construction and operation in the Philippines.
Key Market Trends
Rise of Hyperscale Data Centers
The Philippines data center construction market is witnessing a significant trend towards the development of hyperscale data centers. Hyperscale data centers are large-scale facilities designed to support the massive data storage and processing needs of major cloud service providers, internet giants, and large enterprises. These data centers are characterized by their extensive physical size, high-density computing environments, and large-scale infrastructure.
The demand for hyperscale data centers in the Philippines is driven by the rapid growth of cloud computing services and the increasing need for scalable and flexible IT infrastructure. As businesses and consumers increasingly rely on cloud-based applications, data storage, and processing, hyperscale data centers are becoming essential for managing and supporting these services. The Philippines, with its strategic location in Southeast Asia, is emerging as a key hub for these large-scale facilities, attracting investments from major global tech companies seeking to expand their operations in the region.
The construction of hyperscale data centers involves significant investments in advanced technologies, including state-of-the-art cooling systems, energy-efficient designs, and high-capacity power supply solutions. These facilities are designed to accommodate the growing demand for data and provide high levels of redundancy and reliability to ensure uninterrupted service. The trend towards hyperscale data centers is expected to continue as the digital economy expands and the need for robust data infrastructure increases.
In response to this trend, data center operators in the Philippines are focusing on developing large-scale facilities that can support the needs of hyperscale clients. This includes investing in cutting-edge technologies, optimizing space and resource utilization, and ensuring that facilities are capable of handling high-density workloads. The rise of hyperscale data centers represents a significant shift in the market, driving innovation and investment in data center construction.
Focus on Energy Efficiency and Sustainability
Energy efficiency and sustainability are becoming increasingly important trends in the Philippines' data center construction market. As data centers are energy-intensive facilities, there is a growing emphasis on implementing energy-efficient designs and sustainable practices to reduce operational costs and environmental impact.
The push towards energy efficiency is driven by several factors, including rising energy costs, regulatory pressures, and corporate sustainability goals. Data center operators are investing in technologies and strategies to minimize energy consumption and improve operational efficiency. This includes adopting advanced cooling systems, optimizing power usage effectiveness (PUE), and implementing energy-saving technologies such as LED lighting and smart building management systems.
Sustainability is also a key consideration in data center construction. Operators are focusing on incorporating green building practices and renewable energy sources into their facilities. This includes using renewable energy sources such as solar or wind power to reduce reliance on traditional energy grids and lower carbon emissions. Additionally, data center operators are exploring opportunities for energy recovery and waste heat utilization to further enhance sustainability.
The trend towards energy efficiency and sustainability is not only driven by environmental considerations but also by economic factors. Energy-efficient data centers can result in significant cost savings over time, making them more attractive to investors and operators. Furthermore, regulatory frameworks and industry standards are increasingly requiring data centers to meet specific sustainability criteria, further reinforcing the importance of these practices.
The focus on energy efficiency and sustainability is shaping the data center construction market in the Philippines, leading to the development of more environmentally responsible and cost-effective facilities. This trend is expected to continue as both regulatory requirements and market demands drive the adoption of green technologies and practices.
Segmental Insights
Data Center Size Insights
Large segment held the largest market share in 2023. The Philippines is experiencing a surge in digital transformation, with businesses and government entities increasingly relying on cloud services, data analytics, and digital platforms. Large data centers are well-suited to meet the substantial data processing and storage needs of these growing sectors. They offer the necessary capacity and scalability to support the expanding digital economy.
Building and operating a large data center often provides economies of scale that are advantageous for both operators and tenants. Large facilities can offer more competitive pricing compared to smaller data centers, which is appealing to businesses looking to manage costs while accessing robust IT infrastructure. This cost efficiency makes large data centers an attractive option for enterprises and service providers seeking to optimize their IT expenditures.
The development of large data centers in the Philippines benefits from the country's strategic location and improving infrastructure. These facilities are often positioned in key areas with strong connectivity to major telecommunications networks and international internet exchanges. This enhances their appeal as central hubs for data traffic and connectivity, catering to both local and regional clients.
Large data centers are essential for accommodating the needs of major cloud service providers and large enterprises, which require substantial space and power for their operations. The rise of cloud computing and the expansion of digital services drive the demand for such facilities, leading to their dominance in the market.
The Philippine government's supportive policies and incentives for infrastructure development also contribute to the prevalence of large data centers. These policies help attract investment and facilitate the construction of sizable facilities, reinforcing their dominance in the market.
Regional Insights
National Capital Region (NCR) held the largest market share in 2023. NCR, particularly Metro Manila, is the country's economic and business center, hosting a substantial portion of the Philippines' corporate and financial activities. Major enterprises, banks, and multinational companies are headquartered here, driving the demand for robust data infrastructure to support their operations. The concentration of businesses necessitates advanced data centers to manage and process extensive volumes of data efficiently.
NCR benefits from superior infrastructure and connectivity compared to other regions. It has well-developed transportation networks, high-speed internet connectivity, and reliable power supply, which are crucial for data center operations. The availability of infrastructure reduces operational challenges and enhances the attractiveness of NCR for data center development.
Significant investments from both domestic and international data center operators have been concentrated in NCR. The region's strategic location and established business environment attract substantial capital, leading to the development of large-scale, state-of-the-art data centers. This influx of investment reinforces NCR's dominance by expanding its data center capacity and capabilities.
NCR has a well-established talent pool with expertise in IT and data center management. The availability of skilled professionals and technical experts supports the efficient operation and maintenance of data centers, making the region more appealing for data center development.
The Philippine government has implemented policies and incentives to attract investment in data center infrastructure. NCR benefits from these supportive measures, which include tax incentives and streamlined regulatory processes, further promoting its growth as a data center hub.
Key Market Players
AECOM
Fortis Construction Inc.
Turner Construction Company
DPR Construction
Schneider Electric SE
Cisco Systems Inc.
Arista Networks, Inc.
SAS Institute Inc.
Report Scope:
In this report, the Philippines Data Center Construction Market has been segmented into the following categories, in addition to the industry trends which have also been detailed below:
Philippines Data Center Construction Market, By Tier Type:
o Tier 1 & 2
o Tier 3 & Tier 4
Philippines Data Center Construction Market, By Data Center Size:
o Small
o Medium
o Large
o Massive
o Mega
Philippines Data Center Construction Market, By Infrastructure:
o Cooling Infrastructure
o Power Infrastructure
o Others
Philippines Data Center Construction Market, By End User:
o IT & Telecommunication
o BFSI
o Government
o Healthcare
o Others
Philippines Data Center Construction Market, By Region:
o National Capital Region
o Cordillera Administrative Region
o Ilocos Region
o Cagayan Valley
o Central Luzon
o Southern Tagalog
o Mimaropa
o Rest of Philippines
Competitive Landscape
Company Profiles: Detailed analysis of the major companies present in the Philippines Data Center Construction Market.
Available Customizations:
Philippines Data Center Construction Market report with the given market data, TechSci Research offers customizations according to a company's specific needs. The following customization options are available for the report:
Company Information
Detailed analysis and profiling of additional market players (up to five).

1. Product Overview
1.1. Market Definition
1.2. Scope of the Market
1.2.1. Markets Covered
1.2.2. Years Considered for Study
1.3. Key Market Segmentations
2. Research Methodology
2.1. Objective of the Study
2.2. Baseline Methodology
2.3. Formulation of the Scope
2.4. Assumptions and Limitations
2.5. Sources of Research
2.5.1. Secondary Research
2.5.2. Primary Research
2.6. Approach for the Market Study
2.6.1. The Bottom-Up Approach
2.6.2. The Top-Down Approach
2.7. Methodology Followed for Calculation of Market Size & Market Shares
2.8. Forecasting Methodology
2.8.1. Data Triangulation & Validation
3. Executive Summary
4. Voice of Customer
5. Philippines Data Center Construction Market Outlook
5.1. Market Size & Forecast
5.1.1. By Value
5.2. Market Share & Forecast
5.2.1. By Tier Type (Tier 1 & 2, Tier 3 & Tier 4)
5.2.2. By Data Center Size (Small, Medium, Large, Massive, Mega)
5.2.3. By Infrastructure (Cooling Infrastructure, Power Infrastructure, Others)
5.2.4. By End User (IT & Telecommunication, BFSI, Government, Healthcare, Others)
5.2.5. By Region (National Capital Region, Cordillera Administrative Region, llocos Region, Cagayan Valley, Central Luzon, Southern Tagalog, Mimaropa, Rest of Philippines)
5.2.6. By Company (2023)
5.3. Market Map
6. National Capital Region Data Center Construction Market Outlook
6.1. Market Size & Forecast
6.1.1. By Value
6.2. Market Share & Forecast
6.2.1. By Tier Type
6.2.2. By Data Center Size
6.2.3. By Infrastructure
6.2.4. By End User
7. Cordillera Administrative Region Data Center Construction Market Outlook
7.1. Market Size & Forecast
7.1.1. By Value
7.2. Market Share & Forecast
7.2.1. By Tier Type
7.2.2. By Data Center Size
7.2.3. By Infrastructure
7.2.4. By End User
8. llocos Region Data Center Construction Market Outlook
8.1. Market Size & Forecast
8.1.1. By Value
8.2. Market Share & Forecast
8.2.1. By Tier Type
8.2.2. By Data Center Size
8.2.3. By Infrastructure
8.2.4. By End User
9. Cagayan Valley Data Center Construction Market Outlook
9.1. Market Size & Forecast
9.1.1. By Value
9.2. Market Share & Forecast
9.2.1. By Tier Type
9.2.2. By Data Center Size
9.2.3. By Infrastructure
9.2.4. By End User
10. Central Luzon Data Center Construction Market Outlook
10.1. Market Size & Forecast
10.1.1. By Value
10.2. Market Share & Forecast
10.2.1. By Tier Type
10.2.2. By Data Center Size
10.2.3. By Infrastructure
10.2.4. By End User
11. Southern Tagalog Data Center Construction Market Outlook
11.1. Market Size & Forecast
11.1.1. By Value
11.2. Market Share & Forecast
11.2.1. By Tier Type
11.2.2. By Data Center Size
11.2.3. By Infrastructure
11.2.4. By End User
12. Mimaropa Data Center Construction Market Outlook
12.1. Market Size & Forecast
12.1.1. By Value
12.2. Market Share & Forecast
12.2.1. By Tier Type
12.2.2. By Data Center Size
12.2.3. By Infrastructure
12.2.4. By End User
13. Market Dynamics
13.1. Drivers
13.2. Challenges
14. Market Trends & Developments
15. Philippines Economic Profile
16. Company Profiles
16.1. AECOM
16.1.1. Business Overview
16.1.2. Key Revenue and Financials
16.1.3. Recent Developments
16.1.4. Key Personnel/Key Contact Person
16.1.5. Key Product/Services Offered
16.2. Fortis Construction Inc.
16.2.1. Business Overview
16.2.2. Key Revenue and Financials
16.2.3. Recent Developments
16.2.4. Key Personnel/Key Contact Person
16.2.5. Key Product/Services Offered
16.3. Turner Construction Company
16.3.1. Business Overview
16.3.2. Key Revenue and Financials
16.3.3. Recent Developments
16.3.4. Key Personnel/Key Contact Person
16.3.5. Key Product/Services Offered
16.4. DPR Construction
16.4.1. Business Overview
16.4.2. Key Revenue and Financials
16.4.3. Recent Developments
16.4.4. Key Personnel/Key Contact Person
16.4.5. Key Product/Services Offered
16.5. Schneider Electric SE
16.5.1. Business Overview
16.5.2. Key Revenue and Financials
16.5.3. Recent Developments
16.5.4. Key Personnel/Key Contact Person
16.5.5. Key Product/Services Offered
16.6. Cisco Systems Inc.
16.6.1. Business Overview
16.6.2. Key Revenue and Financials
16.6.3. Recent Developments
16.6.4. Key Personnel/Key Contact Person
16.6.5. Key Product/Services Offered
16.7. Arista Networks, Inc.
16.7.1. Business Overview
16.7.2. Key Revenue and Financials
16.7.3. Recent Developments
16.7.4. Key Personnel/Key Contact Person
16.7.5. Key Product/Services Offered
16.8. SAS Institute Inc.
16.8.1. Business Overview
16.8.2. Key Revenue and Financials
16.8.3. Recent Developments
16.8.4. Key Personnel/Key Contact Person
16.8.5. Key Product/Services Offered
17. Strategic Recommendations
18. About Us & Disclaimer

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE