Peru Renewable Energy - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026 - 2031)

Market Report I 2026-01-16 I 110 Pages I Mordor Intelligence

Peru Renewable Energy Market Analysis

The Peru Renewable Energy Market was valued at 8.98 gigawatt in 2025 and estimated to grow from 10.39 gigawatt in 2026 to reach 21.56 gigawatt by 2031, at a CAGR of 15.72% during the forecast period (2026-2031).

This expansion comes at a moment when long-standing hydro dominance is giving way to a solar-centric build-out, thanks to solar levelized costs dipping below USD 30/MWh in the high-irradiance southern corridor. Wind assets still anchor installed capacity, but mining-sector corporate PPAs, an impending 500 kV Peru-Ecuador intertie, and a new green-hydrogen law together broaden demand sources, unlock export optionality, and open fresh investment avenues. The shift also draws in new capital: European incumbents are offloading mature portfolios to Chinese SOEs, while infrastructure funds such as Actis line up multi-gigawatt development pipelines. Short-term headwinds, namely the risk of an auction hiatus beyond 2027 and localized grid congestion, temper near-term growth; yet, policy signals such as annual technology-neutral tenders and World Bank-backed adaptation finance reinforce longer-term visibility.

Peru Renewable Energy Market Trends and Insights



Government-Backed RER Auctions Restart in 2025

The 2024 tender allocated 1,016 MW at an average solar price of USD 27.36/MWh, proving that auction reform, which separates capacity and energy payments, can unlock large-scale investment. Winning bids from Statkraft, Engie, Kallpa, and Luz del Sur secured 20-year PPAs; however, the absence of a multi-year calendar clouds revenue visibility for projects targeting post-2027 operations. Developers with stronger balance sheets can weather this uncertainty better than smaller independent power producers, raising barriers to entry. Unless MINEM publishes a predictable schedule, project finance costs could rise, diluting price competitiveness against gas. The 2025 auction announcement, therefore, remains a critical gating event for the Peru renewable energy market.

Sharp Solar-PV LCOE Decline Below USD 30/MWh in Moquegua & Arequipa

Irradiation exceeding 2,400 kWh/m and tariff-free module imports pushed solar LCOE to USD 27-30/MWh in 2024. Acciona's 225 MW La Joya project and Yinson's 97 MW Matarani plant illustrate how bifacial modules and single-axis trackers lift capacity factors above 30%. Mining operators are locking in long-dated PPAs at these tariffs to hedge against thermal volatility, underscoring the demand elasticity that occurs when prices breach the USD 30/MWh psychological threshold. Yet curtailed grid access in the southern corridor forces developers to price interconnection risk into bids, which could erode the headline cost advantage if transmission upgrades lag capacity growth.

Auction Hiatus & Regulatory Uncertainty Beyond 2027

The 2016-2024 procurement gap forced developers onto merchant or corporate power purchase agreement (PPA) paths, dampening investment diversity. Although December 2024 reforms separated capacity and energy payments, no binding calendar exists for 2026-2030 tenders, escalating revenue-certainty risk. Political turnover, five presidents since 2018, adds another layer of unpredictability. Lenders now demand higher equity cushions, which inflates the cost of capital and jeopardizes the 15.98% CAGR trajectory of the Peruvian renewable energy market.

Other drivers and restraints analyzed in the detailed report include:

Mining-Sector Corporate PPAs Accelerating Demand for RenewablesGreen-Hydrogen Law Catalyzing Electrolyser Projects at Southern PortsGrid Congestion in Southern Corridor Delays Project COD

For complete list of drivers and restraints, kindly check the Table Of Contents.

Segment Analysis

Solar additions accelerated after the 2024 auction, and utility-scale awards totaling 1,005 MW have lifted the segment to the forefront of the Peru renewable energy market. Statkraft's 336 MW Illpa complex, Engie's 172 MW Intipampa project, and Kallpa's 204 MW Sunny plant are slated for commissioning by 2027, jointly adding 712 MW of nameplate capacity. COES cleared 1,677 MW of new solar studies in Q1 2025, bringing the active pipeline above 3 GW, while LCOE parity with gas in peak hours cements solar's position as the cost leader. Hydropower still commands 74.10% of installed capacity, yet incremental growth is limited to 664 MW of run-of-river projects through 2027. Wind stands at 1,021 MW but faces siting and avian-impact challenges that elongate permitting timelines relative to solar.

Developers are banking on hybrid systems to offset intermittency, with Kallpa's La Joya project integrating a 4-hour battery to meet the needs of the mining sector. The Peru renewable energy market size for solar is forecast to expand at a 32.35% CAGR, outpacing all other technologies. Although wind projects such as Kallpa's 1,111 MW portfolio can achieve 25-30% capacity factors, curtailment risk remains elevated near congested coastal corridors, tempering near-term build-out. Bioenergy and geothermal remain niche due to feedstock constraints and drilling costs, while ocean energy remains commercially unviable under current tariff structures.

The Peru Renewable Energy Market Report is Segmented by Technology (Solar Energy, Wind Energy, Hydropower, Bioenergy, Geothermal, and Ocean Energy) and End-User (Utilities, Commercial and Industrial, and Residential). The Market Sizes and Forecasts are Provided in Terms of Installed Capacity (GW).

List of Companies Covered in this Report:

Acciona SA Enel Green Power Peru SAC Engie Energia Peru SA Vestas Wind Systems A/S Siemens Gamesa Renewable Energy SA Cobra Instalaciones y Servicios SA (ACS) Statkraft Peru SA ContourGlobal PLC Grenergy Renovables SL Brookfield Renewable Kallpa Generacion SA Elera Renovables (formerly Odebrecht Energy) SPIC Pacific Energy Iberdrola Renovables Peru SolarPack Peru Atlas Renewable Energy Fenix Power Peru Abo Wind Pacific Hydro Total Eren Grupo T-Solar

Additional Benefits:

The market estimate (ME) sheet in Excel format
3 months of analyst support

1 Introduction
1.1 Study Assumptions & Market Definition
1.2 Scope of the Study

2 Research Methodology

3 Executive Summary

4 Market Landscape
4.1 Market Overview
4.2 Market Drivers
4.2.1 Government-backed RER auctions restart in 2025
4.2.2 Sharp solar-PV LCOE decline below USD 30/MWh in Moquegua & Arequipa
4.2.3 New 500 kV Peru-Ecuador intertie unlocking export PPAs
4.2.4 Mining-sector corporate PPAs accelerating demand for renewables
4.2.5 Green-hydrogen law catalyzing electrolyser projects at southern ports
4.2.6 Rural micro-grid program electrifying 100 k off-grid homes
4.3 Market Restraints
4.3.1 Auction hiatus & regulatory uncertainty beyond 2027
4.3.2 Cheap Camisea gas keeps thermal generation cost-competitive
4.3.3 Grid congestion in southern corridor delays project COD
4.3.4 Local opposition to coastal wind farms over visual & avian impacts
4.4 Supply-Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook
4.7 Porters Five Forces
4.7.1 Threat of New Entrants
4.7.2 Bargaining Power of Suppliers
4.7.3 Bargaining Power of Buyers
4.7.4 Threat of Substitutes
4.7.5 Competitive Rivalry
4.8 PESTLE Analysis

5 Market Size & Growth Forecasts
5.1 By Technology
5.1.1 Solar Energy (PV and CSP)
5.1.2 Wind Energy (Onshore and Offshore)
5.1.3 Hydropower (Small, Large, PSH)
5.1.4 Bioenergy
5.1.5 Geothermal
5.1.6 Ocean Energy (Tidal and Wave)
5.2 By End-User
5.2.1 Utilities
5.2.2 Commercial and Industrial
5.2.3 Residential

6 Competitive Landscape
6.1 Market Concentration
6.2 Strategic Moves (M&A, JVs, Funding, PPAs)
6.3 Market Share Analysis (Market Rank/Share for key companies)
6.4 Company Profiles (includes Global-level Overview, Market-level Overview, Core Segments, Financials, Strategic Information, Products & Services, Recent Developments)
6.4.1 Acciona SA
6.4.2 Enel Green Power Peru SAC
6.4.3 Engie Energia Peru SA
6.4.4 Vestas Wind Systems A/S
6.4.5 Siemens Gamesa Renewable Energy SA
6.4.6 Cobra Instalaciones y Servicios SA (ACS)
6.4.7 Statkraft Peru SA
6.4.8 ContourGlobal PLC
6.4.9 Grenergy Renovables SL
6.4.10 Brookfield Renewable
6.4.11 Kallpa Generacion SA
6.4.12 Elera Renovables (formerly Odebrecht Energy)
6.4.13 SPIC Pacific Energy
6.4.14 Iberdrola Renovables Peru
6.4.15 SolarPack Peru
6.4.16 Atlas Renewable Energy
6.4.17 Fenix Power Peru
6.4.18 Abo Wind
6.4.19 Pacific Hydro
6.4.20 Total Eren
6.4.21 Grupo T-Solar

7 Market Opportunities & Future Outlook
7.1 White-space & Unmet-Need Assessment

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE
  • $4750.00
  • $5250.00
  • $6500.00
  • $8750.00
  • ADD TO BASKET
  • BUY NOW