Opportunities Preloader

Please Wait.....

Report

Oman Power - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026 - 2031)

Market Report I 2026-01-16 I 95 Pages I Mordor Intelligence

Oman Power Market Analysis

Oman Power Market size in 2026 is estimated at 13.99 gigawatt, growing from 2025 value of 12.87 gigawatt with 2031 projections showing 21.25 gigawatt, growing at 8.72% CAGR over 2026-2031.

Rising baseload demand from green-hydrogen electrolyzers, data-center expansions, and steady block-61 gas production underwrite near-term growth, while the 1 GW Manah solar complex and a 1 GW wind pipeline accelerate the renewable build-out. The North-South 400 kV interconnection reduces regional imbalances and unlocks export potential to the Gulf Cooperation Council grid. Policy moves such as APSR Decision 2024/43 begin to narrow subsidy gaps, incentivize private investment, and sharpen hourly price signals in the spot market. Developers continue to bid aggressively in tenders because long-term PPAs offer creditworthy offtake and regulated gas keeps levelized costs low.

Oman Power Market Trends and Insights



Accelerating Utility-Scale Solar PV Build-Out

Oman commissioned the 1 GW Manah I and II plants in January 2025, more than doubling installed renewable capacity and proving investor appetite for large projects at tariffs near USD 0.023 kWh. A Masdar-led consortium closed a PPA for the 500 MW Ibri III solar-plus-storage project in May 2024, setting the country's first utility-scale hybrid precedent. Nama PWP issued the 280 MW Al Kamil RfP in December 2024, confirming a visible pipeline through 2027. Compliance with IEC 61215 and IEC 61730 boosts lender confidence, and falling module prices widen project margins. Together, these factors position solar to deliver more than 30% of incremental generation by decade-end.

North-South 400 kV Interconnection Unlocking Renewables Corridors

Phase 1 of the 670 km North-South backbone entered service in 2024, stitching the MIS and Dhofar grids into a single synchronous area. Phase 2, a further 502 km, will reach Dhofar by 2027 and enable surplus midday solar from inland governorates to satisfy southern evening peaks. OETC is spending USD 2.2 billion on 41 transmission projects, including the USD 186 million Masirah Island link that replaces diesel generation. The corridor lays the electrical groundwork for a future Oman-UAE 400 kV tie, improving reserve sharing and boosting export prospects.

Limited Private-Equity Exits Due to Single-Buyer Model

Nama PWP's single-buyer structure locks most capacity into 20-25-year PPAs, leaving less than 5% of generation to spot trading in 2024 and constraining secondary-market liquidity. ACWA Power renewed its Barka 1 IWPP rather than divest because investor demand was thin. Funds chasing 5-7-year horizons find the Oman power market mismatched, lowering fresh equity inflows and slowing project recycle.

Other drivers and restraints analyzed in the detailed report include:

Green-Hydrogen Anchored Mega-Projects Driving New Electricity DemandRapid Data-Center & Bitcoin-Mining Load AdditionsProlonged Electricity-Tariff Subsidies Delaying Cost-Reflective Pricing

For complete list of drivers and restraints, kindly check the Table Of Contents.

Segment Analysis

Thermal assets, fueled largely by regulated-price natural gas, delivered 93.17% of generation in 2025, equating to the largest Oman power market share among power sources. Gas-fired plants will retain grid-stability duty through at least 2029 as the 2.4 GW Misfah-Duqm CCGT portfolio reaches COD. Even so, renewables are adding capacity faster than any other segment. Utility-scale solar alone contributed 1.855 TWh in 2025 and will exceed 6 TWh once Manah operates for a full year. Wind's 1 GW pipeline is slated for 2027, and green-hydrogen projects could catalyze 8-10 GW of captive renewables by 2031. The Oman power market size attributable to renewables is expected to expand at a 31.3% CAGR, lifting its slice toward 20% of total output by decade-end.

Nuclear, hydro, geothermal, biomass, and tidal remain negligible because Oman lacks suitable water bodies and high-grade geothermal reservoirs. Small diesel sets persist only on islands and remote oilfields, awaiting grid extensions such as the Masirah subsea cable. As LCOEs for solar plus storage keep falling, investors weigh hybrid bids with 4-hour batteries to monetize reserve and black-start services under OEMO's ancillary-market rules.

The Oman Power Market Report is Segmented by Power Source (Thermal, Nuclear, and Renewables) and End-User (Utilities, Commercial and Industrial, and Residential). The Market Sizes and Forecasts are Provided in Terms of Installed Capacity (GW).

List of Companies Covered in this Report:

Mazoon Electricity Distribution Company Muscat Electricity Distribution Company Majan Electricity Distribution Company Oman Electricity Transmission Company (OETC) Oman Power & Water Procurement Company (OPWP) ACWA Power Sohar Power Company United Power Company Dhofar Generation Company Tanweer (RAECO) OQ Alternative Energy Hydrogen Oman (Hydrom) BP Oman (Khazzan/Ghazeer) Shell Integrated Power Oman EDF Renewables Oman Jindal Shadeed Iron & Steel (Captive Power) Shams IPPs Consortium (Ibri II) SMN Barka Power Company Marubeni Oman Power ENGIE Oman

Additional Benefits:

The market estimate (ME) sheet in Excel format
3 months of analyst support

1 Introduction
1.1 Study Assumptions & Market Definition
1.2 Scope of the Study

2 Research Methodology

3 Executive Summary

4 Market Landscape
4.1 Market Overview
4.2 Market Drivers
4.2.1 Accelerating utility-scale solar PV build-out
4.2.2 North-South 400 kV interconnection unlocking renewables corridors
4.2.3 Green-hydrogen anchored mega-projects driving new electricity demand
4.2.4 Rapid data-center & Bitcoin-mining load additions
4.2.5 Distribution-level digitalisation & smart-meter roll-out
4.2.6 State-backed low-cost gas supplies for IPPs
4.3 Market Restraints
4.3.1 Limited private equity exits due to single-buyer model
4.3.2 Prolonged electricity-tariff subsidies delaying cost-reflective pricing
4.3.3 Grid-integration bottlenecks for wind resources
4.3.4 Slow execution of rooftop-solar (Sahim) scheme
4.4 Supply-Chain Analysis
4.5 Regulatory Landscape & Policy Outlook
4.6 Technological Outlook (Smart Grid, BESS, Green H?)
4.7 Porter's Five Forces
4.7.1 Threat of New Entrants
4.7.2 Bargaining Power of Suppliers
4.7.3 Bargaining Power of Buyers
4.7.4 Threat of Substitutes
4.7.5 Competitive Rivalry
4.8 PESTLE Analysis

5 Market Size & Growth Forecasts
5.1 By Power Source
5.1.1 Thermal (Coal, Natural Gas, Oil and Diesel)
5.1.2 Nuclear
5.1.3 Renewables (Solar, Wind, Hydro, Geothermal, Biomass & Waste, Tidal)
5.2 By End User
5.2.1 Utilities
5.2.2 Commercial and Industrial
5.2.3 Residential
5.3 By T&D Voltage Level (Qualitative Analysis only)
5.3.1 High-Voltage Transmission (Above 230 kV)
5.3.2 Sub-Transmission (69 to 161 kV)
5.3.3 Medium-Voltage Distribution (13.2 to 34.5 kV)
5.3.4 Low-Voltage Distribution (Up to 1 kV)

6 Competitive Landscape
6.1 Market Concentration
6.2 Strategic Moves (M&A, Partnerships, PPAs)
6.3 Market Share Analysis (Market Rank/Share for key companies)
6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Products & Services, and Recent Developments)
6.4.1 Mazoon Electricity Distribution Company
6.4.2 Muscat Electricity Distribution Company
6.4.3 Majan Electricity Distribution Company
6.4.4 Oman Electricity Transmission Company (OETC)
6.4.5 Oman Power & Water Procurement Company (OPWP)
6.4.6 ACWA Power
6.4.7 Sohar Power Company
6.4.8 United Power Company
6.4.9 Dhofar Generation Company
6.4.10 Tanweer (RAECO)
6.4.11 OQ Alternative Energy
6.4.12 Hydrogen Oman (Hydrom)
6.4.13 BP Oman (Khazzan/Ghazeer)
6.4.14 Shell Integrated Power Oman
6.4.15 EDF Renewables Oman
6.4.16 Jindal Shadeed Iron & Steel (Captive Power)
6.4.17 Shams IPPs Consortium (Ibri II)
6.4.18 SMN Barka Power Company
6.4.19 Marubeni Oman Power
6.4.20 ENGIE Oman

7 Market Opportunities & Future Outlook
7.1 White-Space & Unmet-Need Assessment

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE
  • $4750.00
  • $5250.00
  • $6500.00
  • $8750.00
  • ADD TO BASKET
  • BUY NOW