Nordic Data Center Construction Market - Industry Outlook & Forecast 2023-2028
Market Report I 2023-05-17 I 295 Pages I Arizton Advisory & Intelligence
The Nordic data center construction market is expected to grow at a CAGR of 7.33% during 2023-2028.
KEY HIGHLIGHTS
- Denmark has topped the list amongst Nordic countries, investing more than USD 500 million in 2022. Sweden and Norway followed Denmark in terms of high investments in 2022.
- Operators are signing PPA with renewable energy providers to increase sustainability by decreasing their carbon footprint. For instance, Telia and Telenor signed a PPA with Better Energy for a solar park construction in Denmark.
- There is increased growth in cloud regions set up by multiple hyperscale data centers operators, such as Google, Microsoft, AWS, Oracle, and Meta.
- There is an increase in initiatives being taken by various governments across the regions to make the respective countries carbon-neutral in the future. Operators are moving through more sustainable construction methods like wood and mycelium.
- Supply chain disruptions, increasing inflation rates, shortage of skilled workforce, and political disturbances in Russia will likely hurt the market.
5G DEPLOYMENTS FUELING DATA CENTER INVESTMENTS
- Nordic countries are deploying 5G rapidly, driving investments in data centers, especially edge data centers.
- In July 2022, Eltel and Telenor Norway signed an agreement for USD 36-40 million for 2023-2024 for upgrading and strengthening the telecommunication network of Telenor 5G in Denmark.
- Telenor and Tele2 combined to form a joint venture known as Net4Mobility which expects to cover 90% Swedish population with 5G by the end of the year 2023 and 100% by 2024.
- Iceland is showing tremendous signs of 5G progression. Siminn, an Icelandic network operator, has targets for nationwide 5G coverage by the end of 2022.
INCREASING CLOUD SERVICES ADOPTION IS BOOSTING THE MARKET GROWTH
Nordic companies mainly opt for a hybrid cloud approach by enjoying public and private cloud benefits such as enhanced security. Companies across Nordics are shifting their workloads to the cloud to strengthen their digitalization goals and enjoy cloud advantages. For instance, a Swedish bank migrated its services to the AWS cloud to analyze customer behavior and make data-driven decisions effectively. Hyperscale cloud services providers such as AWS, Google, Microsoft, Oracle, and Meta are increasing their service capabilities for supporting businesses.
RISING AWARENESS OF CARBON-NEUTRALITY
In Nordics, renewable energy sources such as wind, geothermal, and hydro are abundant. Operators are aligning their goals with the carbon-neutral goals of the respective countries. For instance, Green Mountain, a colocation operator, uses 100% of renewable energy in its data center operations.
Denmark is setting up energy islands to harness the resources in the Baltics and will be the first in the world. They will have the capacity to not only supply Denmark but also supply neighboring countries. Also, Nordic Governments are releasing policies relating to sustainability and energy reuse. For instance, the Swedish Government released energy policies such as the Electricity Certificate System to ensure energy is used through renewable energy sources such as solar, wind, hydro, or geothermal.
Tax Incentives Boosting Data Center Construction
Various countries are providing tax incentives for investors based locally or even globally, which will aid in constructing data centers. The Government of Denmark launched a Green Tax Reform and green R&D, which falls under the Danish Recovery and Resilience Plan, for which a USD 250 million investment is planned. Further, Norway has an abundance of hydropower supply; therefore, the government provides favorable and flexible tax rates on the consumed electricity to the industries which are energy intensive.
The report includes the investment in the following areas:
Facility
- Hyperscale Data Centers
- Enterprise Data Centers
- Colocation Data Centers
Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgear
- PDUs
- Other Electrical Infrastructure
Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
Cooling Systems
- CRAC and CRAH Units
- Chillers Units
- Cooling Towers, Condensers, and Dry Coolers
- Economizers & Evaporative Coolers
- Other Cooling Units
Cooling Techniques
- Air-based Cooling
- Liquid-based Cooling
General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Fire Detection & Suppression
- Physical Security
- DCIM/BMS Solutions
Tier Standard
- Tier I & Tier II
- Tier III
- Tier IV
Geography
- Denmark
- Sweden
- Norway
- Finland & Iceland
COMPETITIVE ANALYSIS
- Some major Nordic data center construction market vendors include companies Arup, Caverion, Cowi, Designer Group, RED, and Granlund Group.
- These vendors are collaborating with operators to provide reliable construction solutions. For instance, Keysource provided its planning, engineering, and construction services to Namsos Datasenter (NDS) for edge data center construction.
MAJOR VENDORS
Prominent Support Infrastructure
- ABB
- Alfa Laval
- Carrier
- Caterpillar
- Cummins
- Eaton
- HITEC Power Protection
- Legrand
- NetNordic
- Reillo Elettronica
- Rittal
- Rolls-Royce Power Systems
- Schneider Electric
- Socomec
- STULZ
- Trane Technologies
- Vertiv
Prominent Construction Contractors
- Arup
- Coromatic
- Caverion
- COWI
- Designer Group
- RED
- Dornan
- EXYTE (M+W GROUP)
- Gottlieb Paludan Architects
- Granlund Group
- MT Hojgaard
- Mace Group
- ISG
- Sweco
- Mercury
- Ramboll Group
- YIT
Prominent Data Center Investors
- Apple
- AQ Compute
- atNorth
- Bahnhof
- DigiPlex (IPI Partners)
- Digital Realty
- EcoDataCenter
- Equinix
- Green Mountain
- Hyperco
- Verne Global
- Google
- Meta
- Microsoft
KEY QUESTIONS ANSWERED
1. How big is the Nordic data center construction market?
2. What is the growth rate of the Nordic data center construction market?
3. What is the estimated market size in terms of area in the Nordic data center construction market by 2028?
4. What factors drive the Nordic data center construction market growth?
5. How many MW of power capacity is expected to reach the Nordic data center construction market by 2028?
1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 SCOPE & COVERAGE
4.1 MARKET DEFINITION
4.2 BASE YEAR
4.3 SCOPE OF THE STUDY
4.3.1 MARKET SEGMENTATION BY FACILITY TYPE
4.3.2 MARKET SEGMENTATION BY INFRASTRUCTURE
4.3.3 MARKET SEGMENTATION BY ELECTRICAL INFRASTRUCTURE
4.3.4 MARKET SEGMENTATION BY MECHANICAL INFRASTRUCTURE
4.3.5 MARKET SEGMENTATION BY COOLING SYSTEM
4.3.6 MARKET SEGMENTATION BY COOLING TECHNIQUES
4.3.7 MARKET SEGMENTATION BY GENERAL CONSTRUCTION
4.3.8 MARKET SEGMENTATION BY TIER STANDARDS
4.3.9 MARKET SEGMENTATION BY GEOGRAPHY
5 REPORT ASSUMPTIONS & CAVEATS
5.1 KEY CAVEATS
5.2 CURRENCY CONVERSION
5.3 MARKET DERIVATION
6 MARKET AT A GLANCE
7 PREMIUM INSIGHTS
7.1 KEY MARKET HIGHLIGHTS
7.2 KEY TRENDS IN THE NORDICS DATA CENTER CONSTRUCTION MARKET
8 INTRODUCTION
8.1 MARKET OVERVIEW
8.2 DATA CENTER DESIGN CERTIFICATIONS
8.2.1 UPTIME INSTITUTE TIER STANDARDS
8.2.2 LEED CERTIFICATION
8.2.3 TIA 942 CERTIFICATION
9 MARKET OPPORTUNITIES & TRENDS
9.1 5G DEPLOYMENTS FUELING DATA CENTER INVESTMENTS
9.2 DISTRICT HEATING GROWTH
9.3 INCREASING ADVANCES IN AI
9.4 GOVERNMENT SUPPORT/INITIATIVES FOR DATA CENTER CONSTRUCTION
9.5 INNOVATIONS IN DATA CENTER CONSTRUCTION
10 MARKET GROWTH ENABLERS
10.1 RISING AWARENESS OF CARBON NEUTRALITY
10.2 INCREASING CLOUD SERVICES ADOPTION
10.3 BIG DATA & IOT DRIVING DATA CENTER INVESTMENTS
10.4 USE OF FREE COOLING TO REDUCE PUE
11 MARKET RESTRAINTS
11.1 DEARTH OF SKILLED WORKFORCE
11.2 SECURITY ISSUES IMPACTING DATA CENTER DEVELOPMENTS
11.3 SUPPLY CHAIN ISSUES
12 MARKET LANDSCAPE
12.1 MARKET OVERVIEW
12.2 MARKET SIZE & FORECAST
12.3 AREA: MARKET SIZE & FORECAST
12.4 POWER CAPACITY: MARKET SIZE & FORECAST
12.5 FIVE FORCES ANALYSIS
12.5.1 THREAT OF NEW ENTRANTS
12.5.2 BARGAINING POWER OF SUPPLIERS
12.5.3 BARGAINING POWER OF BUYERS
12.5.4 THREAT OF SUBSTITUTES
12.5.5 COMPETITIVE RIVALRY
13 FACILITY TYPE
13.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
13.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
13.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
13.4 HYPERSCALE DATA CENTERS
13.4.1 MARKET OVERVIEW
13.4.2 INVESTMENT: MARKET SIZE & FORECAST
13.4.3 AREA: MARKET SIZE & FORECAST
13.4.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.5 COLOCATION DATA CENTERS
13.5.1 MARKET OVERVIEW
13.5.2 INVESTMENT: MARKET SIZE & FORECAST
13.5.3 AREA: MARKET SIZE & FORECAST
13.5.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.6 ENTERPRISE DATA CENTERS
13.6.1 MARKET OVERVIEW
13.6.2 INVESTMENT: MARKET SIZE & FORECAST
13.6.3 AREA: MARKET SIZE & FORECAST
13.6.4 POWER CAPACITY: MARKET SIZE & FORECAST
14 INFRASTRUCTURE
14.1 MARKET SNAPSHOT & GROWTH ENGINE
14.2 ELECTRICAL INFRASTRUCTURE
14.2.1 MARKET OVERVIEW
14.2.2 MARKET SIZE & FORECAST
14.3 MECHANICAL INFRASTRUCTURE
14.3.1 MARKET OVERVIEW
14.3.2 MARKET SIZE & FORECAST
14.4 GENERAL CONSTRUCTION
14.4.1 MARKET OVERVIEW
14.4.2 MARKET SIZE & FORECAST
15 ELECTRICAL INFRASTRUCTURE
15.1 MARKET SNAPSHOT & GROWTH ENGINE
15.2 UPS SYSTEMS
15.2.1 MARKET OVERVIEW
15.2.2 MARKET SIZE & FORECAST
15.3 GENERATORS
15.3.1 MARKET OVERVIEW
15.3.2 MARKET SIZE & FORECAST
15.4 TRANSFER SWITCHES & SWITCHGEAR
15.4.1 MARKET OVERVIEW
15.4.2 MARKET SIZE & FORECAST
15.5 POWER DISTRIBUTION UNITS
15.5.1 MARKET OVERVIEW
15.5.2 MARKET SIZE & FORECAST
15.6 OTHER ELECTRICAL INFRASTRUCTURE
15.6.1 MARKET OVERVIEW
15.6.2 MARKET SIZE & FORECAST
16 MECHANICAL INFRASTRUCTURE
16.1 MARKET SNAPSHOT & GROWTH ENGINE
16.2 COOLING SYSTEMS
16.2.1 MARKET OVERVIEW
16.2.2 MARKET SIZE & FORECAST
16.3 RACKS
16.3.1 MARKET OVERVIEW
16.3.2 MARKET SIZE & FORECAST
16.4 OTHER MECHANICAL INFRASTRUCTURE
16.4.1 MARKET OVERVIEW
16.4.2 MARKET SIZE & FORECAST
17 COOLING SYSTEMS
17.1 MARKET SNAPSHOT & GROWTH ENGINE
17.2 CRAC & CRAH UNITS
17.2.1 MARKET OVERVIEW
17.2.2 MARKET SIZE & FORECAST
17.3 CHILLER UNITS
17.3.1 MARKET OVERVIEW
17.3.2 MARKET SIZE & FORECAST
17.4 COOLING TOWERS, CONDENSERS & DRY COOLERS
17.4.1 MARKET OVERVIEW
17.4.2 MARKET SIZE & FORECAST
17.5 ECONOMIZERS & EVAPORATIVE COOLERS
17.5.1 MARKET OVERVIEW
17.5.2 MARKET SIZE & FORECAST
17.6 OTHER COOLING UNITS
17.6.1 MARKET OVERVIEW
17.6.2 MARKET SIZE & FORECAST
18 COOLING TECHNIQUE
18.1 MARKET SNAPSHOT & GROWTH ENGINE
18.2 AIR-BASED COOLING TECHNIQUES
18.2.1 MARKET OVERVIEW
18.2.2 MARKET SIZE & FORECAST
18.3 LIQUID-BASED COOLING TECHNIQUES
18.3.1 MARKET OVERVIEW
18.3.2 MARKET SIZE & FORECAST
19 GENERAL CONSTRUCTION
19.1 MARKET SNAPSHOT & GROWTH ENGINE
19.2 CORE & SHELL DEVELOPMENT
19.2.1 MARKET OVERVIEW
19.2.2 MARKET SIZE & FORECAST
19.3 INSTALLATION & COMMISSIONING SERVICES
19.3.1 MARKET OVERVIEW
19.3.2 MARKET SIZE & FORECAST
19.4 ENGINEERING & BUILDING DESIGN
19.4.1 MARKET OVERVIEW
19.4.2 MARKET SIZE & FORECAST
19.5 FIRE DETECTION & SUPPRESSION
19.5.1 MARKET OVERVIEW
19.5.2 MARKET SIZE & FORECAST
19.6 PHYSICAL SECURITY
19.6.1 MARKET OVERVIEW
19.6.2 MARKET SIZE & FORECAST
19.7 DCIM/BMS SOLUTIONS
19.7.1 MARKET OVERVIEW
19.7.2 MARKET SIZE & FORECAST
20 TIER STANDARDS
20.1 MARKET SNAPSHOT & GROWTH ENGINE
20.2 OVERVIEW OF TIER STANDARDS
20.3 TIER I & II
20.3.1 MARKET OVERVIEW
20.3.2 MARKET SIZE & FORECAST
20.4 TIER III
20.4.1 MARKET OVERVIEW
20.4.2 MARKET SIZE & FORECAST
20.5 TIER IV
20.5.1 MARKET OVERVIEW
20.5.2 MARKET SIZE & FORECAST
21 GEOGRAPHY
21.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
21.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
21.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
22 DENMARK
22.1 MARKET SNAPSHOT
22.1.1 MARKET OVERVIEW
22.2 INVESTMENT: MARKET SIZE & FORECAST
22.3 AREA: MARKET SIZE & FORECAST
22.4 POWER CAPACITY: MARKET SIZE & FORECAST
22.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
23 SWEDEN
23.1 MARKET SNAPSHOT
23.1.1 MARKET OVERVIEW
23.2 INVESTMENT: MARKET SIZE & FORECAST
23.3 AREA: MARKET SIZE & FORECAST
23.4 POWER CAPACITY: MARKET SIZE & FORECAST
23.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24 NORWAY
24.1 MARKET SNAPSHOT
24.1.1 MARKET OVERVIEW
24.2 INVESTMENT: MARKET SIZE & FORECAST
24.3 AREA: MARKET SIZE & FORECAST
24.4 POWER CAPACITY: MARKET SIZE & FORECAST
24.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
25 FINLAND & ICELAND
25.1 MARKET SNAPSHOT
25.1.1 MARKET OVERVIEW
25.2 INVESTMENT: MARKET SIZE & FORECAST
25.3 AREA: MARKET SIZE & FORECAST
25.4 POWER CAPACITY: MARKET SIZE & FORECAST
25.5 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26 COMPETITIVE LANDSCAPE
26.1 ELECTRICAL INFRASTRUCTURE
26.2 MECHANICAL INFRASTRUCTURE
26.3 GENERAL CONSTRUCTION
26.1 DATA CENTER INVESTORS
27 PROMINENT SUPPORT INFRASTRUCTURE
27.1 ABB
27.1.1 BUSINESS OVERVIEW
27.1.2 PRODUCT OFFERINGS
27.2 ALFA LAVAL
27.2.1 BUSINESS OVERVIEW
27.2.2 PRODUCT OFFERINGS
27.3 CARRIER
27.3.1 BUSINESS OVERVIEW
27.3.2 PRODUCT OFFERINGS
27.4 CATERPILLAR
27.4.1 BUSINESS OVERVIEW
27.4.2 PRODUCT OFFERINGS
27.5 CUMMINS
27.5.1 BUSINESS OVERVIEW
27.5.2 PRODUCT OFFERINGS
27.6 EATON
27.6.1 BUSINESS OVERVIEW
27.6.2 PRODUCT OFFERINGS
27.7 HITEC-POWER PROTECTION
27.7.1 BUSINESS OVERVIEW
27.7.2 PRODUCT OFFERINGS
27.8 LEGRAND
27.8.1 BUSINESS OVERVIEW
27.8.2 PRODUCT OFFERINGS
27.9 NETNORDIC
27.9.1 BUSINESS OVERVIEW
27.9.2 PRODUCT OFFERINGS
27.10 RIELLO ELETTRONICA (RIELLO UPS)
27.10.1 BUSINESS OVERVIEW
27.10.2 PRODUCT OFFERINGS
27.11 RITTAL
27.11.1 BUSINESS OVERVIEW
27.11.2 PRODUCT OFFERINGS
27.12 ROLLS-ROYCE POWER SYSTEMS
27.12.1 BUSINESS OVERVIEW
27.12.2 PRODUCT OFFERINGS
27.13 SCHNEIDER ELECTRIC
27.13.1 BUSINESS OVERVIEW
27.13.2 PRODUCT OFFERINGS
27.14 SOCOMEC
27.14.1 BUSINESS OVERVIEW
27.14.2 PRODUCT OFFERINGS
27.15 STULZ
27.15.1 BUSINESS OVERVIEW
27.15.2 PRODUCT OFFERINGS
27.16 TRANE TECHNOLOGIES (INGERSOLL RAND)
27.16.1 BUSINESS OVERVIEW
27.16.2 PRODUCT OFFERINGS
27.17 VERTIV
27.17.1 BUSINESS OVERVIEW
27.17.2 PRODUCT OFFERINGS
28 PROMINENT CONSTRUCTION CONTRACTORS
28.1 ARUP
28.1.1 BUSINESS OVERVIEW
28.1.2 SERVICE OFFERINGS
28.2 COROMATIC (E.ON)
28.2.1 BUSINESS OVERVIEW
28.2.2 SERVICE OFFERINGS
28.3 CAVERION
28.3.1 BUSINESS OVERVIEW
28.3.2 SERVICE OFFERINGS
28.4 COWI
28.4.1 BUSINESS OVERVIEW
28.4.2 SERVICE OFFERINGS
28.5 DESIGNER GROUP
28.5.1 BUSINESS OVERVIEW
28.5.2 SERVICE OFFERINGS
28.6 RED
28.6.1 BUSINESS OVERVIEW
28.6.2 SERVICE OFFERINGS
28.7 DORNAN
28.7.1 BUSINESS OVERVIEW
28.7.2 SERVICE OFFERINGS
28.8 EXYTE (M+W GROUP)
28.8.1 BUSINESS OVERVIEW
28.8.2 SERVICE OFFERINGS
28.9 GOTTLIEB PALUDAN ARCHITECTS
28.9.1 BUSINESS OVERVIEW
28.9.2 SERVICE OFFERINGS
28.10 GRANLUND GROUP
28.10.1 BUSINESS OVERVIEW
28.10.2 SERVICE OFFERINGS
28.11 MT HOJGAARD
28.11.1 BUSINESS OVERVIEW
28.11.2 SERVICE OFFERINGS
28.12 MACE GROUP
28.12.1 BUSINESS OVERVIEW
28.12.2 SERVICE OFFERINGS
28.13 ISG
28.13.1 BUSINESS OVERVIEW
28.13.2 SERVICE OFFERINGS
28.14 SWECO
28.14.1 BUSINESS OVERVIEW
28.14.2 SERVICE OFFERINGS
28.15 MERCURY
28.15.1 BUSINESS OVERVIEW
28.15.2 SERVICE OFFERINGS
28.16 RAMBOLL GROUP
28.16.1 BUSINESS OVERVIEW
28.16.2 SERVICE OFFERINGS
28.17 YIT
28.17.1 BUSINESS OVERVIEW
28.17.2 SERVICE OFFERINGS
29 PROMINENT DATA CENTER INVESTORS
29.1 APPLE
29.1.1 BUSINESS OVERVIEW
29.1.2 SERVICE OFFERINGS
29.2 AQ COMPUTE
29.2.1 BUSINESS OVERVIEW
29.2.2 SERVICE OFFERINGS
29.3 ATNORTH (PARTNERS GROUP)
29.3.1 BUSINESS OVERVIEW
29.3.2 SERVICE OFFERINGS
29.4 BAHNHOF
29.4.1 BUSINESS OVERVIEW
29.4.2 SERVICE OFFERINGS
29.5 DIGIPLEX (IPI PARTNERS)
29.5.1 BUSINESS OVERVIEW
29.5.2 SERVICE OFFERINGS
29.6 DIGITAL REALTY
29.6.1 BUSINESS OVERVIEW
29.6.2 SERVICE OFFERINGS
29.7 ECODATACENTER
29.7.1 BUSINESS OVERVIEW
29.7.2 SERVICE OFFERINGS
29.8 EQUINIX
29.8.1 BUSINESS OVERVIEW
29.8.2 SERVICE OFFERINGS
29.9 GREEN MOUNTAIN
29.9.1 BUSINESS OVERVIEW
29.9.2 SERVICE OFFERINGS
29.10 HYPERCO
29.10.1 BUSINESS OVERVIEW
29.10.2 SERVICE OFFERINGS
29.11 VERNE GLOBAL
29.11.1 BUSINESS OVERVIEW
29.11.2 SERVICE OFFERINGS
29.12 GOOGLE
29.12.1 BUSINESS OVERVIEW
29.12.2 SERVICE OFFERINGS
29.13 META (FACEBOOK)
29.13.1 BUSINESS OVERVIEW
29.13.2 SERVICE OFFERINGS
29.14 MICROSOFT
29.14.1 BUSINESS OVERVIEW
29.14.2 SERVICE OFFERINGS
30 REPORT SUMMARY
30.1 KEY TAKEAWAYS
31 QUANTITATIVE SUMMARY
31.1 NORDIC DATA CENTER CONSTRUCTION MARKET
31.1.1 INVESTMENT: MARKET SIZE & FORECAST
31.1.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
31.2 MARKET SEGMENTATION
31.2.1 ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
31.2.2 MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
31.2.3 COOLING SYSTEMS: MARKET SIZE & FORECAST
31.2.4 COOLING TECHNIQUES: MARKET SIZE & FORECAST
31.2.5 GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
31.2.6 TIER STANDARDS: MARKET SIZE & FORECAST
31.2.7 FACILITY TYPE: MARKET SIZE & FORECAST BY INVESTMENT
31.2.8 FACILITY TYPE: MARKET SIZE & FORECAST BY AREA
31.2.9 FACILITY TYPE: MARKET SIZE & FORECAST BY POWER CAPACITY
31.3 MARKET BY GEOGRAPHY
31.3.1 INVESTMENT: MARKET SIZE & FORECAST
31.3.2 AREA: MARKET SIZE & FORECAST
31.3.3 POWER CAPACITY: MARKET SIZE & FORECAST
31.4 DENMARK
31.4.1 INVESTMENT: MARKET SIZE & FORECAST
31.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
31.5 SWEDEN
31.5.1 INVESTMENT: MARKET SIZE & FORECAST
31.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
31.6 NORWAY
31.6.1 INVESTMENT: MARKET SIZE & FORECAST
31.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
31.7 FINLAND & ICELAND
31.7.1 INVESTMENT: MARKET SIZE & FORECAST
31.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
32 APPENDIX
32.1 ABBREVIATIONS
LIST OF EXHIBITS
EXHIBIT 1 NORDICS DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
EXHIBIT 2 MARKET SIZE CALCULATION APPROACH 2022
EXHIBIT 3 BUILDING STRATEGIES OF LEED
EXHIBIT 4 IMPACT OF 5G DEPLOYMENTS FUELING DATA CENTER INVESTMENTS
EXHIBIT 5 IMPACT OF DISTRICT HEATING GROWTH
EXHIBIT 6 IMPACT OF INCREASING ADVANCES IN AI
EXHIBIT 7 IMPACT OF GOVERNMENT SUPPORT/INITIATIVES FOR DATA CENTER CONSTRUCTION
EXHIBIT 8 IMPACT OF INNOVATIONS IN DATA CENTER CONSTRUCTION
EXHIBIT 9 IMPACT OF RISING AWARENESS OF CARBON NEUTRALITY
EXHIBIT 10 NORWAY ENERGY USAGE 2021 (% SHARE)
EXHIBIT 11 DENMARK ENERGY USAGE 2021 (% SHARE)
EXHIBIT 12 SWEDEN ENERGY USAGE 2021 (% SHARE)
EXHIBIT 13 ENERGY USAGE IN FINLAND 2021 (% SHARE)
EXHIBIT 14 ICELAND ENERGY USAGE 2021 (% SHARE)
EXHIBIT 15 IMPACT OF INCREASING CLOUD SERVICES ADOPTION
EXHIBIT 16 IMPACT OF BIG DATA & IOT DRIVING DATA CENTER INVESTMENTS
EXHIBIT 17 USE OF IOT & BIG DATA ACROSS INDUSTRIES
EXHIBIT 18 IMPACT OF USE OF FREE COOLING TO REDUCE PUE
EXHIBIT 19 IMPACT OF DEARTH OF SKILLED WORKFORCE
EXHIBIT 20 IMPACT OF SECURITY ISSUES IMPACTING DATA CENTER DEVELOPMENTS
EXHIBIT 21 IMPACT OF SUPPLY CHAIN ISSUES
EXHIBIT 22 NORDIC DATA CENTER CONSTRUCTION MARKET BY INVESTMENT 2022-2028 ($ MILLION)
EXHIBIT 23 NORDIC DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 24 NORDIC DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 25 FIVE FORCES ANALYSIS 2022
EXHIBIT 26 INCREMENTAL GROWTH OF INVESTMENT BY FACILITY TYPE 2022 & 2028
EXHIBIT 27 INCREMENTAL GROWTH OF AREA BY FACILITY TYPE 2022 & 2028
EXHIBIT 28 INCREMENTAL GROWTH OF POWER CAPACITY BY FACILITY TYPE 2022 & 2028
EXHIBIT 29 NORDIC HYPERSCALE DATA CENTER CONSTRUCTION MARKET BY INVESTMENT 2022?2028 ($ MILLION)
EXHIBIT 30 NORDIC HYPERSCALE DATA CENTER MARKET BY AREA 2022?2028 (THOUSAND SQUARE FEET)
EXHIBIT 31 NORDIC COLOCATION DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022?2028 (MW)
EXHIBIT 32 NORDIC COLOCATION DATA CENTER CONSTRUCTION MARKET BY INVESTMENT 2022?2028 ($ MILLION)
EXHIBIT 33 NORDIC COLOCATION DATA CENTER CONSTRUCTION MARKET BY AREA 2022?2028 (THOUSAND SQUARE FEET)
EXHIBIT 34 NORDIC COLOCATION DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022?2028 (MW)
EXHIBIT 35 NORDIC ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY INVESTMENT 2022?2028 ($ MILLION)
EXHIBIT 36 NORDIC ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY AREA 2022?2028 (THOUSAND SQUARE FEET)
EXHIBIT 37 NORDIC ENTERPRISE DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022?2028 (MW)
EXHIBIT 38 INCREMENTAL GROWTH BY INFRASTRUCTURE 2022 & 2028
EXHIBIT 39 NORDIC DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022?2028 ($ MILLION)
EXHIBIT 40 NORDIC DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022?2028 ($ MILLION)
EXHIBIT 41 NORDIC DATA CENTER CONSTRUCTION MARKET BY GENERAL CONSTRUCTION 2022?2028 ($ MILLION)
EXHIBIT 42 INCREMENTAL GROWTH BY ELECTRIC INFRASTRUCTURE 2022 & 2028
EXHIBIT 43 NORDIC DATA CENTER CONSTRUCTION MARKET BY UPS SYSTEMS 2022?2028 ($ MILLION)
EXHIBIT 44 NORDIC DATA CENTER CONSTRUCTION MARKET BY GENERATORS 2022?2028 ($ MILLION)
EXHIBIT 45 NORDIC DATA CENTER CONSTRUCTION MARKET BY TRANSFER SWITCHES & SWITCHGEAR 2022?2028 ($ MILLION)
EXHIBIT 46 NORDIC DATA CENTER CONSTRUCTION MARKET BY POWER DISTRIBUTION UNIT 2022?2028 ($ MILLION)
EXHIBIT 47 NORDIC DATA CENTER CONSTRUCTION MARKET BY OTHER ELECTRICAL INFRASTRUCTURE 2022?2028 ($ MILLION)
EXHIBIT 48 INCREMENTAL GROWTH BY MECHANICAL INFRASTRUCTURE 2022 & 2028
EXHIBIT 49 NORDIC DATA CENTER CONSTRUCTION MARKET BY COOLING SYSTEMS 2022?2028 ($ MILLION)
EXHIBIT 50 NORDIC DATA CENTER CONSTRUCTION MARKET BY RACKS 2022?2028 ($ MILLION)
EXHIBIT 51 NORDIC DATA CENTER CONSTRUCTION MARKET BY OTHER MECHANICAL INFRASTRUCTURE 2022?2028 ($ MILLION)
EXHIBIT 52 INCREMENTAL GROWTH BY COOLING SYSTEMS 2022 & 2028
EXHIBIT 53 NORDIC DATA CENTER CONSTRUCTION MARKET BY CRAC & CRAH UNITS 2022?2028 ($ MILLION)
EXHIBIT 54 NORDIC DATA CENTER CONSTRUCTION MARKET BY CHILLER UNITS 2022?2028 ($ MILLION)
EXHIBIT 55 NORDIC DATA CENTER CONSTRUCTION MARKET BY COOLING TOWERS, CONDENSERS & DRY COOLERS 2022?2028 ($ MILLION)
EXHIBIT 56 NORDIC DATA CENTER CONSTRUCTION MARKET BY ECONOMIZERS & EVAPORATIVE COOLERS 2022?2028 ($ MILLION)
EXHIBIT 57 NORDIC DATA CENTER CONSTRUCTION MARKET BY OTHER COOLING UNITS 2022?2028 ($ MILLION)
EXHIBIT 58 INCREMENTAL GROWTH BY COOLING TECHNIQUE 2022 & 2028
EXHIBIT 59 NORDIC DATA CENTER CONSTRUCTION MARKET BY AIR-BASED COOLING 2022?2028 ($ MILLION)
EXHIBIT 60 NORDIC DATA CENTER CONSTRUCTION MARKET BY LIQUID-BASED COOLING 2022?2028 ($ MILLION)
EXHIBIT 61 INCREMENTAL GROWTH BY GENERAL CONSTRUCTION 2022 & 2028
EXHIBIT 62 NORDIC DATA CENTER CONSTRUCTION MARKET BY CORE & SHELL DEVELOPMENT 2022?2028 ($ MILLION)
EXHIBIT 63 NORDIC DATA CENTER CONSTRUCTION MARKET BY INSTALLATION & COMMISSIONING SERVICES 2022?2028 ($ MILLION)
EXHIBIT 64 NORDIC DATA CENTER CONSTRUCTION MARKET BY ENGINEERING & BUILDING DESIGN 2022?2028 ($ MILLION)
EXHIBIT 65 NORDIC DATA CENTER CONSTRUCTION MARKET BY FIRE DETECTION & SUPPRESSION 2022?2028 ($ MILLION)
EXHIBIT 66 NORDIC DATA CENTER CONSTRUCTION MARKET BY PHYSICAL SECURITY 2022?2028 ($ MILLION)
EXHIBIT 67 NORDIC DATA CENTER CONSTRUCTION MARKET BY DCIM/BMS 2022?2028 ($ MILLION)
EXHIBIT 68 INCREMENTAL GROWTH BY TIER STANDARD 2022 & 2028
EXHIBIT 69 DATA CENTER TIER STANDARDS
EXHIBIT 70 NORDIC TIER I & II DATA CENTER CONSTRUCTION MARKET 2022?2028 ($ MILLION)
EXHIBIT 71 NORDIC TIER III DATA CENTER CONSTRUCTION MARKET 2022?2028 ($ MILLION)
EXHIBIT 72 NORDIC TIER IV DATA CENTER CONSTRUCTION MARKET 2022?2028 ($ MILLION)
EXHIBIT 73 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 74 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 75 INCREMENTAL GROWTH BY GEOGRAPHY 2022 & 2028
EXHIBIT 76 DENMARK DATA CENTER CONSTRUCTION MARKET SNAPSHOT
EXHIBIT 77 DENMARK DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 78 DENMARK DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 79 DENMARK DATA CENTER MARKET BY AREA 2022-2028 (THOUSAND SQUARE FEET)
EXHIBIT 80 DENMARK DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 81 DENMARK DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 82 SWEDEN DATA CENTER CONSTRUCTION MARKET SNAPSHOT
EXHIBIT 83 SWEDEN DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 84 SWEDEN DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 85 SWEDEN DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 ($ MILLION)
EXHIBIT 86 SWEDEN DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 ($ MILLION)
EXHIBIT 87 SWEDEN DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 88 NORWAY DATA CENTER CONSTRUCTION MARKET SNAPSHOT
EXHIBIT 89 NORWAY DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 90 NORWAY DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 91 NORWAY DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 ($ MILLION)
EXHIBIT 92 NORWAY DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 ($ MILLION)
EXHIBIT 93 NORWAY DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
EXHIBIT 94 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET SNAPSHOT
EXHIBIT 95 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET OVERVIEW
EXHIBIT 96 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET 2022-2028 ($ MILLION)
EXHIBIT 97 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET BY AREA 2022-2028 ($ MILLION)
EXHIBIT 98 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY 2022-2028 (MW)
EXHIBIT 99 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET BY SUPPORT INFRASTRUCTURE 2022-2028 ($ MILLION)
LIST OF TABLES
TABLE 1 KEY CAVEATS
TABLE 2 CURRENCY CONVERSION 2015?2022
TABLE 3 DENMARK DATA CENTER INVESTMENTS 2022-2028
TABLE 4 SWEDEN DATA CENTER INVESTMENTS 2022-2028
TABLE 5 NORWAY DATA CENTER INVESTMENTS 2022-2028
TABLE 6 FINLAND & ICELAND DATA CENTER INVESTMENTS 2022-2028
TABLE 7 NORDIC DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2022-2028
TABLE 8 NORDIC DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 9 NORDIC DATA CENTER CONSTRUCTION MARKET BY ELECTRICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 10 NORDIC DATA CENTER CONSTRUCTION MARKET BY MECHANICAL INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 11 NORDIC DATA CENTER CONSTRUCTION MARKET BY COOLING SYSTEMS 2022-2028 ($ MILLION)
TABLE 12 NORDIC DATA CENTER CONSTRUCTION MARKET BY COOLING TECHNIQUES 2022-2028 ($ MILLION)
TABLE 13 NORDIC DATA CENTER CONSTRUCTION MARKET BY GENERAL CONSTRUCTION 2022-2028 ($ MILLION)
TABLE 14 NORDIC DATA CENTER CONSTRUCTION MARKET BY TIER STANDARDS 2022-2028 ($ MILLION)
TABLE 15 NORDIC DATA CENTER CONSTRUCTION MARKET BY FACILITY TYPE 2022-2028 ($ MILLION)
TABLE 16 NORDIC DATA CENTER CONSTRUCTION MARKET BY AREA BY FACILITY TYPE 2022-2028 (THOUSAND SQUARE FEET)
TABLE 17 NORDIC DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY BY FACILITY TYPE 2022-2028 (MW)
TABLE 18 NORDIC DATA CENTER CONSTRUCTION MARKET BY GEOGRAPHY 2022-2028 ($ MILLION)
TABLE 19 NORDIC DATA CENTER CONSTRUCTION MARKET BY AREA BY GEOGRAPHY 2022-2028 (THOUSAND SQUARE FEET)
TABLE 20 NORDIC DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY BY GEOGRAPHY 2022-2028 (MW)
TABLE 21 DENMARK DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 22 DENMARK DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 23 SWEDEN DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 24 SWEDEN DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 25 NORWAY DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 26 NORWAY DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
TABLE 27 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET 2022-2028
TABLE 28 FINLAND & ICELAND DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE 2022-2028 ($ MILLION)
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.