Latin America Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026 - 2031)
Market Report I 2026-01-16 I 180 Pages I Mordor Intelligence
Latin America Data Center Construction Market Analysis
The Latin America Data Center Construction market is expected to grow from USD 5.59 billion in 2025 to USD 6.05 billion in 2026 and is forecast to reach USD 8.96 billion by 2031 at 8.19% CAGR over 2026-2031. Robust investment momentum stems from sovereign-cloud mandates, hyperscale campus build-outs by United States cloud majors, and mounting artificial-intelligence workloads that require specialized, high-density facilities. Brazil leads regional spending with 40% of total 2024 investments, while Mexico's Queretaro corridor attracts fresh capital thanks to proximity to U.S. demand and state incentives. Mechanical infrastructure dominated 2024 spending at 38% because tropical heat loads elevate cooling requirements, yet IT infrastructure posts the quickest gains at an 8.52% CAGR through 2030. Tier III sites prevailed with 62% share in 2024, but Tier IV projects advance at an 8.90% CAGR as hyperscalers insist on fault-tolerant uptime. Supply-chain bottlenecks and grid constraints lengthen project cycles; however, sweeping deregulation in Chile and abundant renewable-energy opportunities across Brazil, Chile, and Colombia sustain a positive investment outlook.
Latin America Data Center Construction Market Trends and Insights
Accelerating cloud, AI and big-data workloads
Artificial-intelligence applications now demand three to five times the power density of legacy computing, compelling operators to redesign thermal architectures and electrical topologies. Microsoft's USD 2.7 billion Brazil investment and Scala's USD 50 billion AI City illustrate the scale of new requirements. Liquid-cooling adoption accelerates, with locally manufactured Delta Cube systems reducing energy usage in ODATA sites. Regional policy makers regard AI infrastructure as a pillar of digital competitiveness, prompting expedited permits and targeted tax breaks. Contractors report surging bids for high-density MEP packages, and suppliers of busway, pumps, and plate-heat exchangers scale up regional production footprints.
Hyperscale campus build-outs by U.S. cloud majors
Amazon Web Services, Microsoft Azure, and Google Cloud collectively earmark more than USD 10 billion for Latin America by 2030. Multi-gigawatt campuses in Sao Paulo, Queretaro, and Bogota require redundant 400 kV utility feeds, advanced fire suppression, and prefabricated power rooms that cut commissioning cycles to 12-18 months. Regional fiber conglomerate V.tal alone budgets USD 1 billion to deliver hyperscale-ready shells in Brazil. The build-to-suit model favors EPC firms proficient in integrated design-build, and demand spills into secondary metros as power availability tightens in first-tier cities.
Grid-power bottlenecks and surging electricity tariffs
Mexico struggles with 18-month utility-interconnection queues, pushing developers to procure diesel generation that adds up to 25% to project CAPEX and inflates operating expenses. Argentina's macro-economic volatility amplifies tariff risk, while localized transmission congestion in Sao Paulo forces developers toward Campinas and Porto Alegre. AI workloads multiply power density, stressing grids originally designed for commercial office loads. Operators increasingly sign 15-year renewable PPAs to secure predictable pricing, but smaller enterprises lack the balance-sheet to pursue such deals, slowing adoption in mid-market segments.
Other drivers and restraints analyzed in the detailed report include:
5G-driven edge-DC demand in secondary LATAM metrosSovereign-cloud and data-residency regulationsScarcity of Tier-III/IV-certified MEP labor
For complete list of drivers and restraints, kindly check the Table Of Contents.
Segment Analysis
Mechanical infrastructure contributed 37.35% to the Latin America Data Center Construction market size in 2025, as hot-humid conditions across Brazil, Peru, and Colombia require robust chilled-water loops, evaporative cooling, and custom containment systems. Power distribution units, switchgear, and UPS arrays within electrical infrastructure stay essential for banking and telecom uptime mandates. General construction captures resilient shell-and-core outlays, including seismic bracing and hurricane-rated envelopes that safeguard mission-critical halls.
IT infrastructure is the fastest-growing category with an 8.16% CAGR, driven by servers optimized for AI inference, NVMe storage arrays, and 400 Gbps networking fabric. Hyperscale clients standardize on high-density racks requiring direct-to-chip liquid manifolds, which boosts demand for stainless-steel piping and redundant coolant pumps. Services such as consulting, commissioning, and facility management add value by ensuring regulation compliance and PUE optimization. The Latin America Data Center Construction market share within energy-efficiency consulting rises as carbon disclosure norms tighten in stock exchanges across the region.
Tier III sites held 61.10% of the Latin America Data Center Construction market share in 2025, balancing 99.982% availability against manageable capex. Banks, insurers, and public clouds select this level for core workloads that tolerate brief maintenance windows. Conversely, content-delivery networks and regional edge nodes often deploy Tier II to limit cost while placing nodes closer to users.
Tier IV construction will grow 8.55% CAGR through 2031 on the back of hyperscalers and fintech platforms seeking 99.995% service-level commitments. Multiple independent distribution paths, fault-tolerant chillers, and concurrently maintainable generators inflate capital budgets by up to 60%, yet clients accept the premium to satisfy uptime-linked revenue clauses. Builders partner with certification bodies early in design to avoid late-stage retrofit costs that have plagued first-time entrants.
The Latin America Data Center Construction Market is Segmented by Infrastructure (Electrical Infrastructure, Mechanical Infrastructure, and More), Tier Standard (Tier I and II, Tier III, and More), End User (Banking Financial Services & Insurance, IT & Telecommunications, and More), Data Center Type (Colocation, Hyperscale, and More), and Geography (Brazil, Mexico, and More). Forecasts are in USD.
List of Companies Covered in this Report:
AECOM Turner Construction Company DPR Construction Jacobs Solutions Inc. Fluor Corporation Skanska AB (Latin America) Ferrovial S.A. Grupo ACS (Dragados) ACCIONA Construccion Andrade Gutierrez Engenharia Camargo Correa Infra Novonor (Odebrecht Engenharia) Queiroz Galvao S.A. Techint EandC Sacyr Ingenieria e Infraestructuras Mota-Engil LATAM Constructora Norberto Odebrecht LatAm Grupo Carso Infraestructura COSAPI Ingenieria y Construccion Constructora Colpatria Grupo Marhnos Constructora Sudamericana Ghella S.p.A. Besix Watpac
Additional Benefits:
The market estimate (ME) sheet in Excel format
3 months of analyst support
1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study
2 RESEARCH METHODOLOGY
3 EXECUTIVE SUMMARY
4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Market Drivers
4.2.1 Accelerating cloud, AI and big-data workloads
4.2.2 Hyperscale campus build-outs by US cloud majors
4.2.3 5G-driven edge-DC demand in secondary LATAM metros
4.2.4 Sovereign-cloud and data-residency regulations
4.2.5 Power-purchase-agreement (PPA) availability for renewables
4.2.6 Modular and prefabricated construction adoption
4.3 Market Restraints
4.3.1 Grid-power bottlenecks and surging electricity tariffs
4.3.2 Scarcity of Tier-III/IV-certified MEP labour
4.3.3 Water-stress curbing liquid-cooling deployments
4.3.4 Lengthy environmental licensing and community opposition
4.4 Value / Supply-Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook
4.7 Porter's Five Forces
4.7.1 Bargaining Power of Suppliers
4.7.2 Bargaining Power of Consumers
4.7.3 Threat of New Entrants
4.7.4 Threat of Substitutes
4.7.5 Intensity of Competitive Rivalry
4.8 Key Latin America Data Center Construction Statistics
4.8.1 Data Centers Total Installed Capacity (MW) in the Latin America, 2023 and 2024
4.8.2 Total IT Load Under Construction in the Latin America, MW, 2025 - 2030
4.8.3 Average Capex and Opex for the Latin America Data Center Construction
4.8.4 Top Capex Spenders on Data Center Infrastructure in Latin America
5 MARKET SIZE AND GROWTH FORECASTS
5.1 By Infrastructure
5.1.1 By Electrical Infrastructure
5.1.1.1 Power Distribution Solutions
5.1.1.1.1 Power Distribution Unit
5.1.1.1.2 Switchgears
5.1.1.1.3 Others Electrical Infrastructure
5.1.1.2 Power Backup Solutions
5.1.1.2.1 UPS
5.1.1.2.2 Generators
5.1.2 By Mechanical Infrastructure
5.1.2.1 Cooling Systems
5.1.2.1.1 Liquid-based Cooling
5.1.2.1.2 Air-based Cooling
5.1.2.2 Racks and Cabinets
5.1.2.3 Other Mechanical Infrastructure
5.1.3 By IT Infrastructure
5.1.3.1 Servers
5.1.3.2 Storage
5.1.3.3 Other IT Infrastructure
5.1.4 General Construction
5.1.5 Services
5.1.5.1 Design and Consulting
5.1.5.2 Integration
5.1.5.3 Support and Maintenance
5.2 By Tier Standard
5.2.1 Tier I and II
5.2.2 Tier III
5.2.3 Tier IV
5.3 By End-User Industry
5.3.1 Banking, Financial Services and Insurance
5.3.2 IT and Telecommunications
5.3.3 Government and Defense
5.3.4 Healthcare
5.3.5 Other End Users
5.4 By Data Center Type
5.4.1 Colocation Data Centers
5.4.2 Hyperscale / Self-built Data Centers
5.4.3 Others (Enterprise / Edge / Modular)
5.5 By Geography
5.5.1 Brazil
5.5.2 Chile
5.5.3 Argentina
5.5.4 Rest of Latin America
6 COMPETITIVE LANDSCAPE
6.1 Market Share Analysis
6.2 Company Profiles (includes Global-level Overview, Market-level Overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)
6.2.1 AECOM
6.2.2 Turner Construction Company
6.2.3 DPR Construction
6.2.4 Jacobs Solutions Inc.
6.2.5 Fluor Corporation
6.2.6 Skanska AB (Latin America)
6.2.7 Ferrovial S.A.
6.2.8 Grupo ACS (Dragados)
6.2.9 ACCIONA Construccion
6.2.10 Andrade Gutierrez Engenharia
6.2.11 Camargo Correa Infra
6.2.12 Novonor (Odebrecht Engenharia)
6.2.13 Queiroz Galvao S.A.
6.2.14 Techint EandC
6.2.15 Sacyr Ingenieria e Infraestructuras
6.2.16 Mota-Engil LATAM
6.2.17 Constructora Norberto Odebrecht LatAm
6.2.18 Grupo Carso Infraestructura
6.2.19 COSAPI Ingenieria y Construccion
6.2.20 Constructora Colpatria
6.2.21 Grupo Marhnos
6.2.22 Constructora Sudamericana
6.2.23 Ghella S.p.A.
6.2.24 Besix Watpac
7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK
7.1 White-space and Unmet-Need Assessment
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.