Latin America Data Center Construction Market - Industry Outlook & Forecast 2024-2029
Market Report I 2024-04-08 I 354 Pages I Arizton Advisory & Intelligence
The Latin America data center construction market is expected to grow at a CAGR of 9.25% during the forecast period.
KEY TRENDS
Surge of 5G Connectivity in Edge Data Center Investments
- In Latin America, 5G will account for nearly 60% of the total mobile connections by 2030. The deployment of 5G networks is fueling modern edge devices, remote working, and the application of advanced technologies. Brazil is leading the way in 5G technology deployments. Other countries, including Mexico, Argentina, Colombia, and Peru, are in the trial stage.
- In December 2023, Colombia's Ministry of Information Technologies and Communications (MinTIC) authorized Claro, Partners Telecom Colombia (WOM), Union Temporal Colombia Movil-Telefonica, and Sociedad Futura Telecall Colombia to participate in the 5G auction, which is expected to generate around USD 500 million.
- The rising deployment of 5G services and the growth in demand for connectivity in new locations and Tier I and II cities are attracting investments from edge data center operators. For instance, edge operators, including Surfix Data Center, Brisanet, V.tal, and EdgeUno, are investing in establishing multiple edge data centers across Brazil, Chile, Colombia, and Mexico.
Increase In Sustainable Initiatives
Latin American governments, such as Brazil, Chile, Mexico, and Colombia, have set sustainability targets. They are working together to diversify their electrical networks to support the policy and regulatory changes that encourage using renewable energy sources. Brazil, Chile, and Mexico have tremendous influence among neighboring countries, allowing them to present their renewable energy policies as viable models for the other countries in the region.
Digital Economy
Governments and organizations are taking initiatives to develop and grow the digital economy. These initiatives are slated to increase the region's digital transactions and smart payment technologies. According to the World Bank, around 75% of the Latin American population has internet connectivity, and 35% of individuals still prefer cash to digital payment methods.
- In January 2024, Amazon customers in Mexico could choose Kueski Pay, a Buy Now Pay Later (BNPL) option. This provides the purchase plans of 12 bi-weekly installments through linked bank accounts, debit cards, or cash under respective networks.
SEGMENTATION INSIGHTS
- The data centers in Latin America are increasingly adopting advanced techniques such as air and liquid-based cooling. This includes innovations such as liquid-based immersion cooling and the incorporation of inventive air conditioning technology by Google in its latest data center in Uruguay.
- Eaton, Caterpillar, Cummins, Legrand, ABB, Rolls Royce, and Schneider Electric are some of the significant electrical infrastructure providers in the Latin America data center construction market that are collaborating with operators for installing electrical infrastructure, such as UPS systems and generators, with a minimum of N+1 redundancy. For instance, the KIO Networks BOG 1 data center facility is installed with Cummins diesel generators.
- Data centers are investing in cooling infrastructure due to the high-temperature climate in some Latin American countries. In 2023, cooling systems will account for a market share of more than 65% of the total mechanical infrastructure in data centers.
Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgear
- PDUs
- Other Electrical Infrastructure
Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
Cooling Systems
- CRAC & CRAH Units
- Chillers Units
- Cooling Towers, Condensers, and Dry Coolers
- Economizers & Evaporative Coolers
- Other Cooling Units
Cooling Technique
- Air-based Cooling
- Liquid-based Cooling
General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Fire Detection & Suppression
- Physical Security
- DCIM/BMS Solutions
Tier Standard
- Tier I & Tier II
- Tier III
- Tier IV
GEOGRAPHICAL ANALYSIS
- Brazil led the Latin America data center construction market in 2023, accounting for over 40% of the market share in investments. Mexico, Chile, and Colombia followed this country.
- In Latin America, several countries are actively establishing Special Economic Zones (SEZs), Free Trade Zones (FTZs), Export Processing Zones (EPZs), business parks, and industrial zones, which provide attractive benefits such as tax incentives for international businesses. In 2023, Google started the construction of the Teros data center facility in Uruguay. The company acquired a property of around 30 hectares within the Parque de las Ciencias Free Trade Zone (FTZ) in the Canelones department of Uruguay.
Geography
- Brazil
- Chile
- Colombia
- Mexico
- Argentina
- Rest of Latin America
VENDOR LANDSCAPE
- AECOM, Aceco TI, Afonso Franca Engenharia, Fluor Corporation, Jacobs Engineering, Constructora Sudamericana, Quark, Zeittec, Modular Data Centers, Soben, KMD Architects, Syska Hennessey Group, Quark, Gensler, Turner Construction, and ZFB Group are some of the key players in Latin America data center construction market. For instance, Afonso Franca Engenharia is involved in the ODATA RJ1 data center phase expansion in Rio de Janeiro as well as the development of the CloudHQ data center campus in Paulinia and the V.tal data centers in Fortaleza and Porto Alegre.
Key Data Center Support Infrastructure Providers
- ABB
- Alfa Laval
- Assa Abloy
- Axis Communications
- Bosch Security Systems (Robert Bosch)
- Caterpillar
- Cummins
- Daikin Applied
- Delta Electronics
- EATON
- Honeywell
- Johnson Controls
- Legrand
- Munters
- Mitsubishi Electric
- Piller Power Systems
- Panduit
- Rittal
- Rolls-Royce
- Schneider Electric
- Siemens
- STULZ
- Vertiv
Prominent Construction Contractors
- AECOM
- Aceco TI
- Afonso Franca Engenharia
- Constructora Sudamericana
- Cundall
- Fluor Corporation
- Gensler
- HDOS
- Hyphen
- Holder Construction
- Jacobs Engineering
- KMD Architects
- Modular Data Centers
- PQC
- Quark
- Syska Hennessey Group
- Soben
- Turner Construction
- Turner & Townsend
- The Weitz Company
- ZFB Group
- Zeittec
Prominent Data Center Investors
- Amazon Web Services (AWS)
- Ascenty
- Angola Cables
- Ava Telecom
- Blue NAP Americas
- Cirion Technologies
- ClaroVTR
- Digicel
- Entel
- Equinix
- EdgeUno
- EdgeConneX
- Elea Digital
- Gtd Peru
- HostDime
- IPXON Networks
- InterNexa
- KIO Networks
- Microsoft
- Millicom (Tigo Panama)
- Nabiax
- Oxygen
- Onex
- ODATA (Aligned Data Centers)
- Quantico
- Scala Data Centers
- SONDA
- Telecom Italia Sparkle
- V.tal
New Entrants
- CloudHQ
- DHAmericas
- EVEO
- Layer 9 Data Centers
- Surfix Data Center
KEY QUESTIONS ANSWERED:
1. How big is the Latin America data center construction market?
2. What is the growth rate of the Latin America data center construction market?
3. What is the estimated market size in terms of area in the Latin America data center construction market by 2029?
4. What are the key trends in the Latin America data center construction market?
5. How many MW of power capacity is expected to reach the Latin America data center construction market by 2029?
1. REPORT COVERAGE
1.1. WHAT'S INCLUDED
1.2. SEGMENTAL COVERAGE
1.2.1. Market Segmentation by Infrastructure
1.2.2. Market Segmentation by Electrical Infrastructure
1.2.3. Market Segmentation by Mechanical Infrastructure
1.2.4. Market Segmentation by Cooling System
1.2.5. Market Segmentation by Cooling Technique
1.2.6. Market Segmentation by General Construction
1.2.7. Market Segmentation by Tier Standard
2. MARKET AT A GLANCE
3. PREMIUM INSIGHTS
3.1. MARKET OVERVIEW
3.2. KEY TRENDS
3.2.1. The surge of 5G connectivity in edge data center investments
3.2.2. Increase in sustainable initiatives
3.2.3. Digital Economy
3.3. SEGMENTATION ANALYSIS
3.4. GEOGRAPHICAL ANALYSIS
3.5. VENDOR ANALYSIS
4. INTRODUCTION
4.1. HISTORICAL MARKET OVERVIEW
4.2. INTERNET & DATA GROWTH
4.3. DATA CENTER DESIGN CERTIFICATIONS
4.3.1. Uptime Institute Tier Standards
4.3.2. LEED Certification
4.3.3. TIA 942 Certification
5. MARKET OPPORTUNITIES & TRENDS
5.1. EDGE DATA CENTER DEPLOYMENTS FUELED BY 5G LAUNCH
5.2. GROWTH IN THE PROCUREMENT OF RENEWABLE ENERGY
5.3. DEPLOYMENT OF ARTIFICIAL INTELLIGENCE (AI) WORKLOADS IN DATA CENTERS
5.4. GROWTH IN THE DEPLOYMENT OF SUBMARINE CABLES
6. MARKET GROWTH ENABLERS
6.1. INCREASE IN DEMAND FOR CLOUD-BASED DATA CENTERS
6.2. BIG DATA & IOT BOOSTING DATA CENTER INVESTMENTS
6.3. IMPLEMENTATION OF TAX INCENTIVES APPEALS TO DATA CENTER INVESTMENTS
6.4. GROWTH IN DIGITAL ECONOMY
7. MARKET RESTRAINTS
7.1. LOCATION CONSTRAINTS
7.2. DEARTH OF SKILLED WORKFORCE
7.3. INCREASE IN CARBON EMISSIONS FROM DATA CENTERS
7.4. DATA CENTER SECURITY CHALLENGES
8. MARKET LANDSCAPE
8.1. MARKET OVERVIEW
8.2. INVESTMENT: MARKET SIZE & FORECAST
8.3. AREA: MARKET SIZE & FORECAST
8.4. POWER CAPACITY: MARKET SIZE & FORECAST
9. INFRASTRUCTURE
9.1. MARKET SNAPSHOT
9.2. ELECTRICAL INFRASTRUCTURE
9.2.1. Market Overview
9.2.2. Investment: Market Size & Forecast
9.3. MECHANICAL INFRASTRUCTURE
9.3.1. Market Overview
9.3.2. Investment: Market Size & Forecast
9.4. GENERAL CONSTRUCTION
9.4.1. Market Overview
9.4.2. Investment: Market Size & Forecast
10. ELECTRICAL INFRASTRUCTURE
10.1. MARKET SNAPSHOT
10.2. MARKET OVERVIEW
10.3. UPS SYSTEMS
10.3.1. Market Overview
10.3.2. Market Size & Forecast
10.4. GENERATORS
10.4.1. Market Overview
10.4.2. Market Size & Forecast
10.5. TRANSFER SWITCHES & SWITCHGEARS
10.5.1. Market Overview
10.5.2. Market Size & Forecast
10.6. PDUS
10.6.1. Market Overview
10.6.2. Market Size & Forecast
10.7. OTHER ELECTRICAL INFRASTRUCTURE
10.7.1. Market Overview
10.7.2. Market Size & Forecast
11. MECHANICAL INFRASTRUCTURE
11.1. MARKET SNAPSHOT
11.2. MARKET OVERVIEW
11.3. COOLING SYSTEMS
11.3.1. Market Overview
11.3.2. Market Size & Forecast
11.4. RACKS
11.4.1. Market Overview
11.4.2. Market Size & Forecast
11.5. OTHER MECHANICAL INFRASTRUCTURE
11.5.1. Market Overview
11.5.2. Market Size & Forecast
12. COOLING SYSTEMS
12.1. MARKET SNAPSHOT
12.2. MARKET OVERVIEW
12.3. CRAC & CRAH UNITS
12.3.1. Market Overview
12.3.2. Market Size & Forecast
12.4. CHILLER UNITS
12.4.1. Market Overview
12.4.2. Market Size & Forecast
12.5. COOLING TOWERS, CONDENSERS, and DRY COOLERS
12.5.1. Market Overview
12.5.2. Market Size & Forecast
12.6. ECONOMIZERS & EVAPORATIVE COOLERS
12.6.1. Market Overview
12.6.2. Market Size & Forecast
12.7. OTHER COOLING UNITS
12.7.1. Market Overview
12.7.2. Market Size & Forecast
13. COOLING TECHNIQUE
13.1. MARKET SNAPSHOT & GROWTH ENGINE
13.2. MARKET OVERVIEW
13.3. AIR-BASED COOLING
13.3.1. Market Overview
13.3.2. Market Size & Forecast
13.4. LIQUID-BASED COOLING
13.4.1. Market Overview
13.4.2. Market Size & Forecast
14. GENERAL CONSTRUCTION
14.1. MARKET SNAPSHOT
14.2. MARKET OVERVIEW
14.3. CORE & SHELL DEVELOPMENT
14.3.1. Market Overview
14.3.2. Market Size & Forecast
14.4. INSTALLATION & COMMISSIONING SERVICES
14.4.1. Market Overview
14.4.2. Market Size & Forecast
14.5. ENGINEERING & BUILDING DESIGN
14.5.1. Market Overview
14.5.2. Market Size & Forecast
14.6. FIRE DETECTION & SUPPRESSION
14.6.1. Market Overview
14.6.2. Market Size & Forecast
14.7. PHYSICAL SECURITY
14.7.1. Market Overview
14.7.2. Market Size & Forecast
14.8. DCIM/BMS SOLUTIONS
14.8.1. Market Overview
14.8.2. Market Size & Forecast
15. TIER STANDARD
15.1. MARKET SNAPSHOT
15.2. MARKET OVERVIEW
15.3. TIER I & II
15.3.1. Market Overview
15.3.2. Market Size & Forecast
15.4. TIER III
15.4.1. Market Overview
15.4.2. Market Size & Forecast
15.5. TIER IV
15.5.1. Market Overview
15.5.2. Market Size & Forecast
16. GEOGRAPHY
16.1. MARKET SNAPSHOT
17. BRAZIL
17.1. MARKET OVERVIEW
17.2. INVESTMENT: MARKET SIZE & FORECAST
17.3. AREA: MARKET SIZE & FORECAST
17.4. POWER CAPACITY: MARKET SIZE & FORECAST
17.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
18. CHILE
18.1. MARKET OVERVIEW
18.2. INVESTMENT: MARKET SIZE & FORECAST
18.3. AREA: MARKET SIZE & FORECAST
18.4. POWER CAPACITY: MARKET SIZE & FORECAST
18.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
19. COLOMBIA
19.1. MARKET OVERVIEW
19.2. INVESTMENT: MARKET SIZE & FORECAST
19.3. AREA: MARKET SIZE & FORECAST
19.4. POWER CAPACITY: MARKET SIZE & FORECAST
19.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
20. MEXICO
20.1. MARKET OVERVIEW
20.2. INVESTMENT: MARKET SIZE & FORECAST
20.3. AREA: MARKET SIZE & FORECAST
20.4. POWER CAPACITY: MARKET SIZE & FORECAST
20.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
21. ARGENTINA
21.1. MARKET OVERVIEW
21.2. INVESTMENT: MARKET SIZE & FORECAST
21.3. AREA: MARKET SIZE & FORECAST
21.4. POWER CAPACITY: MARKET SIZE & FORECAST
21.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
22. REST OF LATIN AMERICA
22.1. MARKET OVERVIEW
22.2. INVESTMENT: MARKET SIZE & FORECAST
22.3. AREA: MARKET SIZE & FORECAST
22.4. POWER CAPACITY: MARKET SIZE & FORECAST
22.5. INFRASTRUCTURE: MARKET SIZE & FORECAST
23. COMPETITIVE LANDSCAPE
23.1. SUPPORT INFRASTRUCTURE
23.1.1. Electrical infrastructure
23.1.2. Mechanical infrastructure
23.1.3. General Construction
23.2. DATA CENTER INVESTORS
24. KEY DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
24.1. ABB
24.1.1. Business Overview
24.1.2. Product Offerings
24.2. ALFA LAVAL
24.2.1. Business Overview
24.2.2. Product Offerings
24.3. ASSA ABLOY
24.3.1. Business Overview
24.3.2. Product Offerings
24.4. AXIS COMMUNICATIONS
24.4.1. Business Overview
24.4.2. Product Offerings
24.5. BOSCH SECURITY SYSTEMS (ROBERT BOSCH)
24.5.1. Business Overview
24.5.2. Product Offerings
24.6. CATERPILLAR
24.6.1. Business Overview
24.6.2. Product Offerings
24.7. CUMMINS
24.7.1. Business Overview
24.7.2. Product Offerings
24.8. DAIKIN APPLIED
24.8.1. Business Overview
24.8.2. Product Offerings
24.9. DELTA ELECTRONICS
24.9.1. Business Overview
24.9.2. Product Offerings
24.10. EATON
24.10.1. Business Overview
24.10.2. Product Offerings
24.11. HONEYWELL
24.11.1. Business Overview
24.11.2. Product Offerings
24.12. JOHNSON CONTROLS
24.12.1. Business Overview
24.12.2. Product Offerings
24.13. LEGRAND
24.13.1. Business Overview
24.13.2. Product Offerings
24.14. MUNTERS
24.14.1. Business Overview
24.14.2. Product Offerings
24.15. MITSUBISHI ELECTRIC
24.15.1. Business Overview
24.15.2. Product Offerings
24.16. PILLER POWER SYSTEMS
24.16.1. Business Overview
24.16.2. Product Offerings
24.17. PANDUIT
24.17.1. Business overview
24.17.2. Product Offerings
24.18. RITTAL
24.18.1. Business Overview
24.18.2. Product Offerings
24.19. ROLLS-ROYCE
24.19.1. Business Overview
24.19.2. Product Offerings
24.20. SCHNEIDER ELECTRIC
24.20.1. Business Overview
24.20.2. Product Offerings
24.21. SIEMENS
24.21.1. Business Overview
24.21.2. Product Offerings
24.22. STULZ
24.22.1. Business Overview
24.22.2. Product Offerings
24.23. VERTIV
24.23.1. Business Overview
24.23.2. Product Offerings
25. PROMINENT CONSTRUCTION CONTRACTORS
25.1. AECOM
25.1.1. Business Overview
25.1.2. Service Offerings
25.2. ACECO TI
25.2.1. Business Overview
25.2.2. Service Offerings
25.3. AFONSO FRANCA ENGENHARIA
25.3.1. Business Overview
25.3.2. Service Offerings
25.4. CONSTRUCTORA SUDAMERICANA
25.4.1. Business Overview
25.4.2. Service Offerings
25.5. CUNDALL
25.5.1. Business Overview
25.5.2. Service Offerings
25.6. FLUOR CORPORATION
25.6.1. Business Overview
25.6.2. Service Offerings
25.7. GENSLER
25.7.1. Business Overview
25.7.2. Service Offerings
25.8. HDOS
25.8.1. Business Overview
25.8.2. Service Offerings
25.9. HYPHEN
25.9.1. Business Overview
25.9.2. Service Offerings
25.10. HOLDER CONSTRUCTION
25.10.1. Business Overview
25.10.2. Service Offerings
25.11. JACOBS ENGINEERING
25.11.1. Business Overview
25.11.2. Service Offerings
25.12. KMD ARCHITECTS
25.12.1. Business Overview
25.12.2. Service Offerings
25.13. MODULAR DATA CENTERS
25.13.1. Business Overview
25.13.2. Service Offerings
25.14. PQC
25.14.1. Business Overview
25.14.2. Service Offerings
25.15. QUARK
25.15.1. Business Overview
25.15.2. Service Offerings
25.16. SYSKA HENNESSEY GROUP
25.16.1. Business Overview
25.16.2. Service Offerings
25.17. SOBEN
25.17.1. Business Overview
25.17.2. Service Offerings
25.18. TURNER CONSTRUCTION
25.18.1. Business Overview
25.18.2. Service Offerings
25.19. TURNER & TOWNSEND
25.19.1. Business Overview
25.19.2. Service Offerings
25.20. THE WEITZ COMPANY
25.20.1. Business Overview
25.20.2. Service Offerings
25.21. ZFB GROUP
25.21.1. Business Overview
25.21.2. Service Offerings
25.22. ZEITTEC
25.22.1. Business Overview
25.22.2. Service Offerings
26. PROMINENT DATA CENTER INVESTORS
26.1. AMAZON WEB SERVICES
26.1.1. Business Overview
26.1.2. Service Offerings
26.2. ASCENTY
26.2.1. Business Overview
26.2.2. Service Offerings
26.3. ANGOLA CABLES
26.3.1. Business Overview
26.3.2. Service Offerings
26.4. AVA TELECOM
26.4.1. Business Overview
26.4.2. Service Offerings
26.5. BLUE NAP AMERICAS
26.5.1. Business Overview
26.5.2. Service Offerings
26.6. CIRION TECHNOLOGIES
26.6.1. Business Overview
26.6.2. Service Offerings
26.7. CLAROVTR
26.7.1. Business Overview
26.7.2. Service Offerings
26.8. DIGICEL
26.8.1. Business Overview
26.8.2. Service Offerings
26.9. ENTEL
26.9.1. Business Overview
26.9.2. Service Offerings
26.10. EQUINIX
26.10.1. Business Overview
26.10.2. Service Offerings
26.11. EDGEUNO
26.11.1. Business Overview
26.11.2. Service Offerings
26.12. EDGECONNEX
26.12.1. Business Overview
26.12.2. Service Offerings
26.13. ELEA DIGITAL
26.13.1. Business Overview
26.13.2. Service Offerings
26.14. GTD PERU
26.14.1. Business Overview
26.14.2. Service Offerings
26.15. HOSTDIME
26.15.1. Business Overview
26.15.2. Service Offerings
26.16. IPXON NETWORKS
26.16.1. Business Overview
26.16.2. Service Offerings
26.17. INTERNEXA
26.17.1. Business Overview
26.17.2. Service Offerings
26.18. KIO NETWORKS
26.18.1. Business Overview
26.18.2. Service Offerings
26.19. MICROSOFT
26.19.1. Business Overview
26.19.2. Service Offerings
26.20. MILLICOM (TIGO PANAMA)
26.20.1. Business Overview
26.20.2. Service Offerings
26.21. NABIAX
26.21.1. Business Overview
26.21.2. Service Offerings
26.22. OXYGEN
26.22.1. Business Overview
26.22.2. Service Offerings
26.23. ONEX
26.23.1. Business Overview
26.23.2. Service Offerings
26.24. ODATA (ALIGNED DATA CENTERS)
26.24.1. Business Overview
26.24.2. Service Offerings
26.25. QUANTICO
26.25.1. Business Overview
26.25.2. Service Offerings
26.26. SCALA DATA CENTERS
26.26.1. Business Overview
26.26.2. Service Offerings
26.27. SONDA
26.27.1. Business Overview
26.27.2. Service Offerings
26.28. TELECOM ITALIA SPARKLE
26.28.1. Business Overview
26.28.2. Service Offerings
26.29. V.TAL
26.29.1. Business Overview
26.29.2. Service Offerings
27. NEW ENTRANTS
27.1. CLOUDHQ
27.1.1. Business Overview
27.1.2. Service Offerings
27.2. DHAMERICAS
27.2.1. Business Overview
27.2.2. Service Offerings
27.3. EVEO
27.3.1. Business Overview
27.3.2. Service Offerings
27.4. LAYER 9 DATA CENTERS
27.4.1. Business Overview
27.4.2. Service Offerings
27.5. SURFIX DATA CENTER
27.5.1. Business Overview
27.5.2. Service Offerings
28. QUANTITATIVE SUMMARY
28.1. LATIN AMERICA DATA CENTER CONSTRUCTION MARKET
28.1.1. Investment: Market Size & Forecast
28.1.2. Infrastructure: Market Size & Forecast
28.1.3. Electrical Infrastructure: Market Size & Forecast
28.1.4. Mechanical Infrastructure: Market Size & Forecast
28.1.5. Cooling Systems: Market Size & Forecast
28.1.6. Cooling Technique: Market Size & Forecast
28.1.7. General Construction: Market Size & Forecast
28.1.8. Tier Standards: Market Size & Forecast
28.2. GEOGRAPHY: MARKET SIZE & FORECAST
28.2.1. Investment: Market Size & Forecast
28.2.2. Area: Market Size & Forecast
28.2.3. Power Capacity: Market Size & Forecast
28.3. BRAZIL
28.3.1. Investment: Market Size & Forecast
28.3.2. Infrastructure: Market Size & Forecast
28.4. CHILE
28.4.1. Investment: Market Size & Forecast
28.4.2. Infrastructure: Market Size & Forecast
28.5. MEXICO
28.5.1. Investment: Market Size & Forecast
28.5.2. Infrastructure: Market Size & Forecast
28.6. COLOMBIA
28.6.1. Investment: Market Size & Forecast
28.6.2. Infrastructure: Market Size & Forecast
28.7. ARGENTINA
28.7.1. Investment: Market Size & Forecast
28.7.2. Infrastructure: Market Size & Forecast
28.8. REST OF LATIN AMERICA
28.8.1. Investment: Market Size & Forecast
28.8.2. Infrastructure: Market Size & Forecast
29. APPENDIX
29.1. LIST OF ABBREVIATIONS
29.2. SITE SELECTION CRITERIA
29.3. CURRENCY CONVERSION
LIST OF EXHIBITS
Exhibit 1: Market Derivation
Exhibit 2: Carbon Neutrality Goals
Exhibit 3: Power Purchase Agreements (PPA)
Exhibit 4: Segment Split of Latin America Data Center Construction Market ($ million)
Exhibit 5: Market Overview
Exhibit 6: Latin America Data Center Constrcution Market Historical Market Overview
Exhibit 7: Overview of Internet Penetration
Exhibit 8: Impact of Key Opportunities & Trends Factors 2023 & 2029
Exhibit 9: 5G Network Deployments by Telecommunication Operators in 2023
Exhibit 10: Latin America 5G Development Interests by Sectors in 2023
Exhibit 11: Renewable Energy Tragets by Colocation Operators
Exhibit 12: Impact of Key Driving Factors 2023 & 2029
Exhibit 13: Latin America Cloud Expenditure by Country
Exhibit 14: Big Data and IoT Use Cases Across Industries
Exhibit 15: Impact of Key Restraints 2023 & 2029
Exhibit 16: Data Center Skilled Workforce
Exhibit 17: Latin America Ranking of STEM Students by Country
Exhibit 18: Root Causes of Data Center Issues
Exhibit 19: Carbon Neutrality Goals of Colocation and Hyperscale Data Center Opertaors
Exhibit 20: Latin America Data Center Market Overview
Exhibit 21: Latin America Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 22: Latin America Data Center Construction Market by Investment
Exhibit 23: Latin America Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 24: Latin America Data Center Construction Market by Area
Exhibit 25: Latin America Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 26: Latin America Data Center Construction Market by Power Capacity
Exhibit 27: Market Snapshot
Exhibit 28: Latin America Data Center Construction Market by Electrical Infrastructure 2020-2029 ($ million)
Exhibit 29: Latin America Data Center Construction Market by Mechanical Infrastructure 2020-2029 ($ million)
Exhibit 30: Data Center Construction Components
Exhibit 31: Latin America Data Center Construction Market by General Construction 2020-2029 ($ million)
Exhibit 32: Cumulative Investment Opportunities by Electrical Infrastructure (2024-2029)
Exhibit 33: Electrical Infrastructure
Exhibit 34: Latin America Data Center Construction Market by UPS Systems 2020-2029 ($ million)
Exhibit 35: Types of Generators
Exhibit 36: Latin America Data Center Construction Market by Generators 2020-2029 ($ million)
Exhibit 37: Latin America Data Center Construction Market by Trasnfer Switches & Switchgears 2020- 2029 ($ million)
Exhibit 38: PDU Product Families
Exhibit 39: Latin America Data Center Construction Market by PDUs 2020-2029 ($ million)
Exhibit 40: Latin America Data Center Construction Market by Other Electrical Infrastrcuture 2020-2029 ($ million)
Exhibit 41: Cumulative Investment Opportunities by Mechanical Infrastructure (2024-2029)
Exhibit 42: Mechanical Infrastructure
Exhibit 43: Latin America Data Center Construction Market by Cooling Systems 2020-2029 ($ million)
Exhibit 44: Latin America Data Center Construction Market by Racks 2020-2029 ($ million)
Exhibit 45: Latin America Data Center Construction Market by Other Mechanical Infrastructure 2020-2029 ($ million)
Exhibit 46: Cumulative Investment Opportunities by Cooling Systems (2024-2029)
Exhibit 47: Cooling Systems
Exhibit 48: Latin America Data Center Construction Market by CRAC & CRAH Units 2020-2029 ($ million)
Exhibit 49: Latin America Data Center Construction Market by Chiller Units 2020-2029 ($ million)
Exhibit 50: Latin America Data Center Construction Market by Cooling Towers, Condensors & Dry Coolers 2020-2029 ($ million)
Exhibit 51: Latin America Data Center Construction Market by Economizers & Evaporative Coolers 2020-2029 ($ million)
Exhibit 52: Latin America Data Center Construction Market by Other Cooling Units 2020-2029 ($ million)
Exhibit 53: Cumulative Investment Opportunities by Cooling Technique (2024-2029)
Exhibit 54: Cooling Techniques
Exhibit 55: Latin America Data Center Construction Market by Air-Based Cooling 2020-2029 ($ million)
Exhibit 56: Latin America Data Center Construction Market by Liquid-Based Cooling 2020-2029 ($ million)
Exhibit 57: Cumulative Investment Opportunities by General Construction (2024-2029)
Exhibit 58: General Construction
Exhibit 59: Latin America Data Center Construction Market by Core & Shell Development 2020-2029 ($ million)
Exhibit 60: Latin America Data Center Construction Market by Installation & Commissioning Services 2020-2029 ($ million)
Exhibit 61: Data Center Satandards
Exhibit 62: Latin America Data Center Construction Market by Engineering & Building Design 2020-2029 ($ million)
Exhibit 63: Latin America Data Center Construction Market by Fire Detection & Suppression 2020-2029 ($ million)
Exhibit 64: Layers of Physical Security
Exhibit 65: Latin America Data Center Construction Market by Physical Security 2020-2029 ($ million)
Exhibit 66: Latin America Data Center Construction Market by DCIM/BMS Solutions 2020-2029 ($ million)
Exhibit 67: Cumulative Investment Opportunities by Tier Standard (2024-2029)
Exhibit 68: Tier Standards
Exhibit 69: Latin America Data Center Construction Market by Tier I & II 2020-2029 ($ million)
Exhibit 70: Latin America Data Center Construction Market by Tier III 2020-2029 ($ million)
Exhibit 71: Latin America Data Center Construction Market by Tier IV 2020-2029 ($ million)
Exhibit 72: Latin Amrica Data Center Market
Exhibit 73: Brazil Data Center Construction Market Overview
Exhibit 74: Brazil Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 75: Brazil Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 76: Brazil Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 77: Brazil Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 78: Chile Data Center Construction Market Overview
Exhibit 79: Chile Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 80: Chile Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 81: Chile Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 82: Chile Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 83: Colombia Data Center Construction Market Overview
Exhibit 84: Colombia Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 85: Columbia Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 86: Columbia Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 87: Colombia Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 88: Mexico Data Center Construction Market Overview
Exhibit 89: Mexico Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 90: Mexico Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 91: Mexico Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 92: Mexico Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 93: Argentina Data Center Construction Market Overview
Exhibit 94: Argentina Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 95: Argentina Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 96: Argentina Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 97: Argentina Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 98: Rest of Latin America Data Center Construction Market Overview
Exhibit 99: Rest of Latin America Data Center Construction Market by Investment 2020-2029 ($ million)
Exhibit 100: Rest of Latin America Data Center Construction Market by Area 2020-2029 (thousand square feet)
Exhibit 101: Rest of Latin America Data Center Construction Market by Power Capacity 2020-2029 (MW)
Exhibit 102: Rest of Latin America Data Center Construction Market by Infrastructure 2020-2029 ($ million)
Exhibit 103: Site Selection Criteria
LIST OF TABLES
Table 1: List of Existing Submarine Cables by Country in Latin America
Table 2: List of Upcoming Submarine Cables in Latin America
Table 3: List of Upcoming Projects across Latin America (2024 onwards)
Table 4: Difference Between the Air-based and Liquid-based Cooling
Table 5: Latin America Data Center Construction Market 2020 - 2029
Table 6: Latin America Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 7: Latin America Data Center Construction Market by Electrical Infrastructure 2020 - 2029 ($ Million)
Table 8: Latin America Data Center Construction Market by Mechanical Infrastructure 2020 - 2029 ($ Million)
Table 9: Latin America Data Center Construction Market by Cooling Systems 2020 - 2029 ($ Million)
Table 10: Latin America Data Center Construction Market by Cooling Technique 2020 - 2029 ($ Million)
Table 11: Latin America Data Center Construction Market by General Construction 2020 - 2029 ($ Million)
Table 12: Latin America Data Center Construction Market by Tier Standards 2020 - 2029 ($ Million)
Table 13: Latin America Data Center Construction Market 2020 - 2029 ($ Million)
Table 14: Latin America Data Center Construction Market by Area 2020 - 2029 (thousand square feet)
Table 15: Latin America Data Center Construction Market by Power Capacity 2020 - 2029 (MW)
Table 16: Brazil Data Center Construction Market 2020 - 2029
Table 17: Brazil Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 18: Chile Data Center Construction Market 2020 - 2029
Table 19: Chile Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 20: Mexico Data Center Construction Market 2020 - 2029
Table 21: Mexico Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 22: Colombia Data Center Construction Market 2020 - 2029
Table 23: Colombia Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 24: Argentina Data Center Construction Market 2020 - 2029
Table 25: Argentina Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 26: Rest of Latin America Data Center Construction Market 2020 - 2029
Table 27: Rest of Latin America Data Center Construction Market by Infrastructure 2020 - 2029 ($ Million)
Table 28: Currency Conversion Table (2016-2023)
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.