Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2025 - 2030)

Market Report I 2025-04-28 I 100 Pages I Mordor Intelligence

The Data Center Construction Market size is estimated at USD 281.34 billion in 2025, and is expected to reach USD 400.16 billion by 2030, at a CAGR of 7.3% during the forecast period (2025-2030).

Key Highlights
- Under Construction IT Load Capacity: The upcoming IT load capacity of the Global data center market is expected to reach above 73,000 MW by 2029.
- Under Construction Raised Floor Space: The global construction of raised floor areas is expected to exceed 285 million sq. ft. by 2029.
- Planned Racks: The total number of racks to be installed is expected to reach more than 14 million units by 2029. North America is expected to house the maximum number of racks by 2029.
- Hyper-scale data centers are being built more often worldwide to store massive volumes of data, opening up lucrative opportunities for business players. Many industries use hyper-scale data centers to increase computing power, memory, networking capabilities, and storage resources. The ability to effectively scale up computer workloads at a large scale and the physical infrastructure and distribution systems supporting the data centers are two of the many components of hyper-scale data centers.
- Moreover, According to Flexera State of the Cloud Report 2023, 72% of companies' respondents stated they had deployed a hybrid cloud in their business. Migrating to hybrid cloud solutions often comes at the expense of operating private and public clouds.


Data Center Construction Market Trends

Growing Adoption of Tier 4 Data Center Facilities is Driving the Market's Growth


- The Tier-IV certification is currently the highest classification among data center facilities. These facilities are equivalent to data centers used by the US government. They are highly secure, reliable, and redundant. Tier-IV providers have redundancies (2N+1) for every process and the data protection stream. No single outage or error can shut down the system, and it provides 99.995% uptime per annum, which is the highest guaranteed uptime. However, the level IV infrastructure should have at least 96 hours of independent power to qualify for this tier. This power must not be connected with any outside source and is entirely proprietary.
- This tier also ensures optimized efficiency. The servers are housed in the most physically advantageous locations. This drastically extends the life of the hardware if temperature and humidity levels are kept consistent. Even the backups and dual power sources are treated like primaries. The Tier-IV data center can require up to 3 to 1 of the space required to facilitate the IT footprint. For tier IV, the kW Cost Component is USD 25,000/kW of redundant UPS capacity for IT.
- Moreover, market players are investing in hyperscale data centers, which is, in turn, driving segment growth. For instance, in May 2023, Kazuna Data Centers (Kazuna), the largest hyperscale Tier 4 data center network in the Middle East and North Africa, announced its plans to partner with Benya Group, a leading provider of integrated solutions, digital transformation, and ICT infrastructure in Egypt to enter the markets of the Middle East and Africa and Egypt region. The new USD 250 million state-of-the-art data center will be Egypt's first hyperscale data center built in Maadi Technology Park, Egypt's first dedicated investment area.
- In July 2023, Digital Realty, a leading provider of carrier- and cloud-neutral data center, interconnection, and colocation solutions, announced its partnership with GI Partners in order to start a corporation for the sale of a 65% interest in two hyperscale data Tier 4 center buildings, which are stabilized. The company will receive around USD 743 million in gross proceeds from the joint venture and the associated financing.
- As with technological advancements such as AI, IoT, and 5G leading the digital transformation, various industry sectors, such as government, finance, media, and manufacturing, are starting to demand advanced data centers with high reliability. A few prominent technological vendors in the region, leveraging their years of expertise, are launching services that allow the end user to manage data center operations better.


North America Accounts for a Major Share


- North America dominates the global market for building data centers. A strong economy and cutting-edge network infrastructure are critical drivers for the market's expansion. The United States dominates the regional market and has many significant cloud service providers, including Amazon.com, Google Inc., and Facebook. These businesses invest in building massive data centers and increased data storage and processing capabilities, which present enormous market prospects.
- Furthermore, the growing demand for data security and privacy is driving the demand for data centers. According to the Identity Theft Resource Center, the count of data breaches in the United States in 2022 was 1,802. However, around 422 million individuals were affected by data breaches in the same year, including data leaks, breaches, and exposures. Although these are three separate events, they have one feature. An unauthorized malicious actor can access sensitive data under three circumstances. With the rise of data breaches and cyber threats, organizations and businesses seek secure and reliable data handling and storage solutions that only advanced data centers can offer.
- The United States is analyzed to hold a significant share. The rise in the new data centers in the country would drive the market. For instance, in May 2023, Polish software organization Comarch launched a data center of around 32,000 square feet (3,000 sqm) in the city of Phoenix, Arizona. The new data center is anticipated to be fully active starting the year of its announcement. The proposed data center comprises four server rooms with 160 racks and is expected to offer services with managed services, colocation, cloud hosting, disaster recovery, and backup services. It is also projected to provide meet-me rooms (MMR). Such developments are creating growth opportunities for the data center power market in the United States.
- Moreover, in January 2024, Vertiv Group Corp. announced that it increased the production capacity of its switchgear, busway, and integrated modular solutions (IMS) business by more than 100% since it acquired E&I Engineering and PowerBar Gulf LLC, switchgear, busway, and IMS business in 2021 and further, it is planning to expand its existing facilities through the end of 2025.
- The demand for Unified Communications-as-a-Service (UCaaS) solutions from telecom and business technology resellers in North America is also a factor in the market's expansion. To maximize system resilience to MSPs, VARs, ISPs, and interconnects, a player like SkySwitch offers white-label UCaaS from geographically varied sites.


Data Center Construction Industry Overview

The data center construction market is fragmented, consisting of several major players. With technological advancements and product innovations, many companies are increasing their presence in the market by securing new contracts and tapping new markets that cater to an intense rivalry. A few of the key players are AECOM, Whiting-Turner Contracting Company, and DPR Construction.

May 2023: Data4 Group, the French leader in data center operations and investments in Europe, announced that it would build a new data center campus on the former Nokia site in Nosee, Essonne, France. The project, which plans to invest around EUR 1 billion by 2030, aims to revitalize 22 hectares of industrial and office land and underscore the Group's strong presence in Paris.

April 2023: Microsoft announced the opening of its newest trusted cloud center in Poland, which will be the first in Central and Eastern Europe. Microsoft Poland's cloud region consists of three physical locations around Warsaw, each consisting of a single or several data centers. It ensures that data are stored in a country that is in compliance with the highest standards of security, privacy, and regulatory compliance.

Additional Benefits:

- The market estimate (ME) sheet in Excel format
- 3 months of analyst support

1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study

2 RESEARCH METHODOLOGY
2.1 Research Framework
2.2 Secondary Research
2.3 Primary Research
2.4 Data Triangulation and Insight Generation

3 EXECUTIVE SUMMARY

4 MARKET INSIGHT
4.1 Market Overview
4.2 Market Dynamics
4.2.1 Market Drivers
4.2.1.1 Growing Cloud Applications, AI, and Big Data
4.2.1.2 Rising Adoption of Hyperscale Data Centers
4.2.2 Market Restraints
4.2.2.1 Rising Real Estate Cost Coupled with High Cost of Installment and Maintenance
4.3 Industry Attractiveness - Porter's Five Forces Analysis
4.3.1 Bargaining Power of Suppliers
4.3.2 Bargaining Power of Consumers
4.3.3 Threat of New Entrants
4.3.4 Threat of Substitutes
4.3.5 Intensity of Competitive Rivalry
4.4 Key Global Data Center Construction Statistics
4.4.1 Number of Data Centers, Global, 2023
4.4.2 Data Center Under Construction, Global, n MW, 2024 - 2029
4.4.3 Average Capex and Opex For the Global Data Center Construction
4.4.4 Data Center Power Capacity Absorption in MW, Selected Region, 2022 and 2023
4.4.5 The Top CAPEX Spenders on Data Center Infrastructure in the World

5 MARKET SEGMENTATION
5.1 Market Segmentation - By Infrastructure
5.1.1 Market Segmentation - Electrical Infrastructure
5.1.1.1 Power Distribution Solution
5.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions
5.1.1.1.2 Transfer Switches
5.1.1.1.2.1 Static
5.1.1.1.2.2 Automatic (ATS)
5.1.1.1.3 Switchgear
5.1.1.1.3.1 Low-voltage
5.1.1.1.3.2 Medium-voltage
5.1.1.1.4 Power Panels and Components
5.1.1.1.5 Others
5.1.1.2 Power Back up Solutions
5.1.1.2.1 UPS
5.1.1.2.2 Generators
5.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
5.1.2 Market Segmentation - By Mechanical Infrastructure
5.1.2.1 Cooling Systems
5.1.2.1.1 Immersion Cooling
5.1.2.1.2 Direct-To-Chip Cooling
5.1.2.1.3 Rear Door Heat Exchanger
5.1.2.1.4 In-row and In-rack Cooling
5.1.2.2 Racks
5.1.2.3 Other Mechanical Infrastructure
5.1.3 General Construction
5.2 Market Segmentation - By Tier Type
5.2.1 Tier-I and II
5.2.2 Tier-III
5.2.3 Tier-IV
5.3 Market Segmentation - By End User
5.3.1 Banking, Financial Services, and Insurance
5.3.2 IT and Telecommunications
5.3.3 Government and Defense
5.3.4 Healthcare
5.3.5 Other End Users
5.4 Market Segmentation - By Region
5.4.1 North America
5.4.2 Europe
5.4.3 Asia-Pacific
5.4.4 Middle East and Africa
5.4.5 Latin America

6 COMPETITIVE LANDSCAPE
6.1 Company Profiles
6.1.1 AECOM
6.1.2 Whiting-turner Contracting Company
6.1.3 Turner Construction Co.
6.1.4 Jacobs Solutions Inc.
6.1.5 DPR Construction
6.1.6 Skanska USA
6.1.7 Balfour Beatty US
6.1.8 Hensel Phelps
6.1.9 PT Jaya Obayashi
6.1.10 Hibiya Engineering Ltd
6.1.11 Goodman Group
6.1.12 Fortis Construction Inc.

7 INVESTMENTS ANALYSIS

8 MARKET OPPORTUNITIES AND FUTURE TRENDS

9 ABOUT US

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE
  • $4750.00
  • $5250.00
  • $6500.00
  • $8750.00
  • ADD TO BASKET
  • BUY NOW