Data Center Construction Market - Global Outlook & Forecast 2023-2028

Market Report I 2023-06-06 I 1143 Pages I Arizton Advisory & Intelligence

The global data center construction market is expected to grow at a CAGR of 6.50% from 2022-2028.

KEY HIGHLIGHTS/ TRENDS

Shift Towards Sustainable Measures to Reduce Carbon Emissions

The increasing data center power consumption and the need to decrease carbon emissions have prompted many service providers to purchase clean, renewable energy sources to power their current and new facilities. There is a high interest in adopting renewable power sources among global and local operators. Also, many smaller operators are installing solar panels on the rooftops of their facilities to power the data centers.

Innovative and Sustainable Data Center Power Technologies

Several operators are upgrading their data centers from traditional technologies to new ones. Such new technologies will also help the companies focus on sustainability. Some such innovations are as follows:

- Adoption of advanced UPS batteries such as Lithium-ion, Nickle-Zinc, and Prussian Blue sodium-ion batteries replacing lead-acid batteries
- Software-Defined Data Centers (SDDC) and AI in power monitoring
- Microgrid adoption in data centers, majorly among hyperscalers
- Floating data centers, underwater data centers, snow-cooled data centers, and boiling liquid for cooling data centers
- Replacing Diesel Generators with naturally Gas-Powered Hydrogen Fuel Cells & Hydrotreated Vegetable Oil (HVO).

AI to Boost Liquid-Cooling Adoption

Liquid cooling will rapidly grow among data centers deploying AI & ML workloads. For instance, most upcoming facilities will include at least one data hall to support the deployment of advanced two-phase immersion cooling and direct-to-chip cooling solutions. Meta (Facebook) has announced its plan to pause several new and expansion projects across the U.S., as it wants to create a new AI design for the data center facilities.

Government Support to Develop Data Centers

Over the past few years, data center growth has focused on countries offering tax incentives. Many state and local governments provide investments and sales tax incentives to attract operators. The U.S. is leading in providing tax incentives to data center operators. Several states in the U.S. provide tax incentives to data centers for investments, job opportunities, and compensation for employees.

Impact of Supply Chain Disruption

Supply chain disruptions are a major challenge faced by data center developers recently. With the onset of COVID-19, supply chain disruptions increased, leading to a shortage of infrastructure such as power equipment, cooling infrastructure, chips, and other infrastructure. Also, political instability and disturbances between Russia and Ukraine led to a price hike in energy and fuel costs. One of the major shortages faced in the data center construction market was chip shortage, which led to a decline in manufacturing several infrastructures.

SEGMENTATION INSIGHTS

Facility Type

- In 2022, over 31.5% of the overall power capacity addition in the global data center market was carried out by hyperscalers such as Meta (Facebook), Google, Microsoft, and Amazon Web Services.
- The investment by hyperscalers such as AWS, Google, Meta (Facebook), and Microsoft are majorly concentrated in the US region. However, the operators are moving from the US to the European and APAC regions.
- The colocation operators are continuously expanding their presence across the existing markets and are also involved in entering several new markets.

Data Center Electrical Infrastructure

- The emergence of microgrids and on-site power generation systems has led to increased energy storage and sustainable energy, thereby leading to increased savings and improved resiliency.
- The global data center construction market operators are focused on adopting advanced UPS batteries such as Lithium-ion, Nickle-Zinc, and Prussian Blue sodium-ion batteries. The adoption of Lithium-ion batteries is witnessing strong demand among operators.

Data Center Mechanical Infrastructure

- In terms of cooling systems, free cooling techniques have grown significantly over the last few years across regions with favorable climatic conditions that can use evaporative/adiabatic coolers for data center cooling purposes.
- Innovative designs such as district heating are expected to grow among data centers developed in states with colder climatic conditions.
- Procurement of 45U-48U rack cabinets to increase, with an increase in the design of the OCP-Ready Colocation facility supporting OCP-Rack Architecture

Data Center General Construction Services

- Apart from the construction, installation, and commissioning services, data centers also invest in improving physical security, monitoring, and management of facilities through data center infrastructure management (DCIM) on a real-time basis.
- The importance of monitoring is growing with the adoption of intelligent real-time monitoring software with automation, and AI features that can predict maintenance requirements, component failures, and automatic switchovers for uninterrupted operations.
- Supply chain constraints have increased the data center construction and procurement cost by an average of USD 2 - 3 million per MW. However, vendors and developers have successfully aided in this.

GEOGRAPHICAL ANALYSIS

Americas Region

- The availability of tax incentives, free cooling solutions, renewable energy, and low cost of industrial land and power will drive the operators to invest in the Americas region.
- The Americas region is among the most matured data center markets. The North American region, which includes the U.S. and Canada, leads the market in terms of investment, white floor addition, and power capacity addition.

European Region

- The presence of data protection laws such as the implementation of GDPR, availability of free cooling solutions, district heating systems, availability of renewable energy, and others are among the major factors that will attract operators to invest in the European region.
- The FLAP-D markets are developed and established data center markets in Western Europe. However, implementing a moratorium across the Netherlands and Ireland region might slow the investment in the next 2-3 years.
- Spain, Italy, Switzerland, and Belgium are among the region's emerging locations for data center investment. These countries have a higher potential to attract hyperscalers to invest in the market.

Middle East & Africa (MEA) Region

- Increased internet & social media penetration, digitalization initiatives, migration from on-premise to cloud, colocation, and managed services are among the factors driving the data center market in the MEA region.
- UAE and Saudi Arabia are the top destinations for the data center market in the Middle East region. Gulf Data Hub and Khazna Data Centers are among the top colocation operators investing in the industry. Other countries such as Israel, Kuwait, Qatar, Oman, and Bahrain are also witnessing investment and are among the emerging locations in the Middle East region.

APAC Region

- The APAC region is among the world's most dynamic and fastest-growing data center markets. The region has established and developed markets such as China, Australia, Japan, and Singapore.
- India is likely to be among the top destinations for the data center market in the APAC region owing to the deployment of 5G and the surge in internet & social media penetration aided by several digitalization initiatives.

VENDOR LANDSCAPE

Data Center Support Infrastructure Providers
- Vendors such as Schneider Electric, Rittal, Hewlett Packard Enterprise, and Delta Power Solutions provide infrastructure based on OCP design. This will aid in market revenue growth for these vendors, as many organizations prefer solutions such as 48V DC UPS systems.

Data Center Construction Contractors
- The surge in data center activities worldwide will be a major source of revenue for construction contractors. Some prominent construction contractors include AECOM, Arup, Corgan, DPR Construction, Fortis Construction, Holder Construction, Jacobs, Turner Construction, Syska Hennessy Group, RED Engineering, and Turner & Townsend.

Data Center Investors/ Operators
- The major hyperscale operators investing in the data center construction market include Amazon Web Services (AWS), Microsoft, Meta (Facebook), and Google.

KEY QUESTIONS ANSWERED:

1. How big is the data center construction market?
2. What is the growth rate of the data center construction market?
3. What is the estimated market size in terms of area in the global data center construction market by 2028?
4. What are the key trends in the data center construction industry?
5. How many MW of power capacity is expected to reach the global data center construction market by 2028?

1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS

4 SCOPE & COVERAGE
4.1 MARKET DEFINITION
4.2 BASE YEAR
4.3 SCOPE OF THE STUDY
4.4 MARKET SEGMENTS
4.4.1 MARKET SEGMENTATION BY FACILITY TYPE
4.4.2 MARKET SEGMENTATION BY INFRASTRUCTURE
4.4.3 MARKET SEGMENTATION BY ELECTRICAL INFRASTRUCTURE
4.4.4 MARKET SEGMENTATION BY MECHANICAL INFRASTRUCTURE
4.4.5 MARKET SEGMENTATION BY COOLING SYSTEM
4.4.6 MARKET SEGMENTATION BY COOLING TECHNIQUE
4.4.7 MARKET SEGMENTATION BY GENERAL CONSTRUCTION
4.4.8 MARKET SEGMENTATION BY TIER STANDARDS
4.4.9 MARKET SEGMENTATION BY GEOGRAPHY

5 REPORT ASSUMPTIONS & CAVEATS
5.1 KEY CAVEATS
5.2 CURRENCY CONVERSION
5.3 MARKET DERIVATION

6 MARKET AT A GLANCE
7 PREMIUM INSIGHTS
7.1 MARKET OVERVIEW
7.2 KEY HIGHLIGHTS/ TRENDS
7.2.1 SHIFT TOWARD SUSTAINABLE MEASURES TO REDUCE CARBON EMISSIONS
7.2.2 INNOVATIVE AND SUSTAINABLE DATA CENTER POWER TECHNOLOGIES
7.2.3 AI TO BOOST LIQUID-COOLING ADOPTION
7.2.4 GOVERNMENT SUPPORT TO DEVELOP DATA CENTERS
7.2.5 IMPACT OF SUPPLY CHAIN DISRUPTIONS
7.3 SEGMENTATION ANALYSIS
7.3.1 FACILITY TYPE
7.3.2 DATA CENTER ELECTRICAL INFRASTRUCTURE
7.3.3 DATA CENTER MECHANICAL INFRASTRUCTURE
7.3.4 DATA CENTER GENERAL CONSTRUCTION SERVICES
7.4 GEOGRAPHICAL ANALYSIS
7.4.1 AMERICAS REGION
7.4.2 EUROPEAN REGION
7.4.3 MIDDLE EAST & AFRICA (MEA) REGION
7.4.4 APAC REGION
7.5 VENDOR ANALYSIS
7.5.1 DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
7.5.2 DATA CENTER CONSTRUCTION CONTRACTORS
7.5.3 DATA CENTER INVESTORS/OPERATORS

8 INTRODUCTION
8.1 INTERNET & DATA GROWTH
8.2 DATA CENTER SITE SELECTION CRITERIA
8.2.1 KEY

9 MARKET OPPORTUNITIES & TRENDS
9.1 SUSTAINABILITY INITIATIVES BY DATA CENTER OPERATORS
9.2 5G DEPLOYMENTS FUELING EDGE DATA CENTER INVESTMENTS
9.3 SURGE IN RACK POWER DENSITY
9.4 SUSTAINABLE INNOVATIONS IN DATA CENTER POWER TECHNOLOGY
9.4.1 ECODIESEL GENERATORS
9.4.2 NATURAL GAS GENERATORS
9.4.3 FUEL CELLS (HYDROGEN)
9.4.4 HYDROTREATED VEGETABLE OIL (HVO) FUEL
9.4.5 NUCLEAR ENERGY GENERATION
9.4.6 OTHER INNOVATIONS
9.5 INNOVATIVE DATA CENTER POWER TECHNOLOGIES
9.5.1 ADOPTION OF ADVANCED UPS BATTERIES
9.5.2 SOFTWARE-DEFINED DATA CENTERS & AI IN POWER MONITORING
9.5.3 MICROGRIDS
9.6 AUTOMATION & INTELLIGENT MONITORING SOLUTIONS
9.7 ADOPTION OF AI-BASED INFRASTRUCTURE DRIVING LIQUID IMMERSION & DIRECT-TO-CHIP COOLING

10 MARKET GROWTH ENABLERS
10.1 GROWING SUBMARINE & INLAND CONNECTIVITY
10.2 INCREASING M&AS AND JVS ACROSS THE INDUSTRY
10.3 BIG DATA & IOT FUELING DATA CENTER INVESTMENTS
10.4 GOVERNMENT SUPPORT FOR DATA CENTER INVESTMENTS
10.5 INCREASING DEMAND FOR CLOUD-BASED SERVICES

11 MARKET RESTRAINTS
11.1 RISING CARBON EMISSIONS FROM DATA CENTERS
11.2 SITE SELECTION HINDRANCES TO DATA CENTER DEVELOPMENT
11.3 LACK OF SKILLED DATA CENTER PROFESSIONALS & DISCRIMINATION
11.4 SECURITY CHALLENGES IMPACTING DATA CENTER GROWTH
11.5 HIGH MAINTENANCE COSTS & INEFFICIENCIES
11.6 SUPPLY CHAIN DISRUPTIONS HAMPERING GROWTH

12 MARKET LANDSCAPE
12.1 MARKET OVERVIEW
12.2 INVESTMENT: MARKET SIZE & FORECAST
12.3 AREA: MARKET SIZE & FORECAST
12.4 POWER CAPACITY: MARKET SIZE & FORECAST
12.5 FIVE FORCES ANALYSIS
12.5.1 THREAT OF NEW ENTRANTS
12.5.2 BARGAINING POWER OF SUPPLIERS
12.5.3 BARGAINING POWER OF BUYERS
12.5.4 THREAT OF SUBSTITUTES
12.5.5 COMPETITIVE RIVALRY

13 FACILITY TYPE
13.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
13.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
13.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
13.4 HYPERSCALE DATA CENTERS
13.4.1 MARKET OVERVIEW
13.4.2 INVESTMENT: MARKET SIZE & FORECAST
13.4.3 AREA: MARKET SIZE & FORECAST
13.4.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.5 COLOCATION DATA CENTERS
13.5.1 MARKET OVERVIEW
13.5.2 INVESTMENT: MARKET SIZE & FORECAST
13.5.3 AREA: MARKET SIZE & FORECAST
13.5.4 POWER CAPACITY: MARKET SIZE & FORECAST
13.6 ENTERPRISE DATA CENTERS
13.6.1 MARKET OVERVIEW
13.6.2 INVESTMENT: MARKET SIZE & FORECAST
13.6.3 AREA: MARKET SIZE & FORECAST
13.6.4 POWER CAPACITY: MARKET SIZE & FORECAST

14 INFRASTRUCTURE
14.1 MARKET SNAPSHOT & GROWTH ENGINE
14.2 MARKET OVERVIEW
14.3 ELECTRICAL INFRASTRUCTURE
14.3.1 MARKET OVERVIEW
14.3.2 MARKET SIZE & FORECAST
14.4 MECHANICAL INFRASTRUCTURE
14.4.1 MARKET OVERVIEW
14.4.2 INVESTMENT: MARKET SIZE & FORECAST
14.5 GENERAL CONSTRUCTION
14.5.1 MARKET OVERVIEW
14.5.2 INVESTMENT: MARKET SIZE & FORECAST

15 ELECTRICAL INFRASTRUCTURE
15.1 MARKET SNAPSHOT & GROWTH ENGINE
15.2 MARKET OVERVIEW
15.3 UPS SYSTEMS
15.3.1 MARKET OVERVIEW
15.3.2 INVESTMENT: MARKET SIZE & FORECAST
15.4 GENERATORS
15.4.1 MARKET OVERVIEW
15.4.2 INVESTMENT: MARKET SIZE & FORECAST
15.5 TRANSFER SWITCHES & SWITCHGEAR
15.5.1 MARKET OVERVIEW
15.5.2 INVESTMENT: MARKET SIZE & FORECAST
15.6 PDUS
15.6.1 MARKET OVERVIEW
15.6.2 INVESTMENT: MARKET SIZE & FORECAST
15.7 OTHER ELECTRICAL INFRASTRUCTURE
15.7.1 MARKET OVERVIEW
15.7.2 INVESTMENT: MARKET SIZE & FORECAST

16 MECHANICAL INFRASTRUCTURE
16.1 MARKET SNAPSHOT & GROWTH ENGINE
16.2 MARKET OVERVIEW
16.3 COOLING SYSTEMS
16.3.1 MARKET OVERVIEW
16.3.2 MARKET SIZE & FORECAST
16.4 RACKS
16.4.1 MARKET OVERVIEW
16.4.2 INVESTMENT: MARKET SIZE & FORECAST
16.5 OTHER MECHANICAL INFRASTRUCTURE
16.5.1 MARKET OVERVIEW
16.5.2 INVESTMENT: MARKET SIZE & FORECAST

17 COOLING SYSTEMS
17.1 MARKET SNAPSHOT & GROWTH ENGINE
17.2 MARKET OVERVIEW
17.3 CRAC & CRAH UNITS
17.3.1 MARKET OVERVIEW
17.3.2 MARKET SIZE & FORECAST
17.4 CHILLER UNITS
17.4.1 MARKET OVERVIEW
17.4.2 INVESTMENT: MARKET SIZE & FORECAST
17.5 COOLING TOWERS, CONDENSERS & DRY COOLERS
17.5.1 MARKET OVERVIEW
17.5.2 INVESTMENT: MARKET SIZE & FORECAST
17.6 ECONOMIZERS & EVAPORATIVE COOLERS
17.6.1 MARKET OVERVIEW
17.6.2 INVESTMENT: MARKET SIZE & FORECAST
17.7 OTHER COOLING UNITS
17.7.1 MARKET OVERVIEW
17.7.2 INVESTMENT: MARKET SIZE & FORECAST

18 COOLING TECHNIQUE
18.1 MARKET SNAPSHOT & GROWTH ENGINE
18.2 MARKET OVERVIEW
18.3 AIR-BASED COOLING
18.3.1 MARKET OVERVIEW
18.3.2 MARKET SIZE & FORECAST
18.4 LIQUID-BASED COOLING
18.4.1 MARKET OVERVIEW
18.4.2 INVESTMENT: MARKET SIZE & FORECAST

19 GENERAL CONSTRUCTION
19.1 MARKET SNAPSHOT & GROWTH ENGINE
19.2 MARKET OVERVIEW
19.3 CORE & SHELL DEVELOPMENT
19.3.1 MARKET OVERVIEW
19.3.2 MARKET SIZE & FORECAST
19.4 INSTALLATION & COMMISSIONING SERVICES
19.4.1 MARKET OVERVIEW
19.4.2 INVESTMENT: MARKET SIZE & FORECAST
19.5 ENGINEERING & BUILDING DESIGN
19.5.1 MARKET OVERVIEW
19.5.2 INVESTMENT: MARKET SIZE & FORECAST
19.6 FIRE DETECTION & SUPPRESSION
19.6.1 MARKET OVERVIEW
19.6.2 INVESTMENT: MARKET SIZE & FORECAST
19.7 PHYSICAL SECURITY
19.7.1 MARKET OVERVIEW
19.7.2 INVESTMENT: MARKET SIZE & FORECAST
19.8 DCIM/BMS SOLUTIONS
19.8.1 MARKET OVERVIEW
19.8.2 INVESTMENT: MARKET SIZE & FORECAST

20 TIER STANDARD
20.1 MARKET SNAPSHOT & GROWTH ENGINE
20.2 MARKET OVERVIEW
20.3 TIER I & II
20.3.1 MARKET OVERVIEW
20.3.2 MARKET SIZE & FORECAST
20.4 TIER III
20.4.1 MARKET OVERVIEW
20.4.2 INVESTMENT: MARKET SIZE & FORECAST
20.5 TIER IV
20.5.1 MARKET OVERVIEW
20.5.2 INVESTMENT: MARKET SIZE & FORECAST

21 GEOGRAPHY
21.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
21.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
21.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
21.4 SUPPORT INFRASTRUCTURE: MARKET SNAPSHOT & GROWTH ENGINE

22 NORTH AMERICA
22.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
22.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
22.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
22.4 SUPPORT INFRASTRUCTURE: MARKET SNAPSHOT & GROWTH ENGINE
22.5 MARKET OVERVIEW
22.6 INVESTMENT: MARKET SIZE & FORECAST
22.6.1 MARKET SIZE & FORECAST
22.7 AREA: MARKET SIZE & FORECAST
22.7.1 MARKET SIZE & FORECAST
22.8 POWER CAPACITY: MARKET SIZE & FORECAST
22.8.1 MARKET SIZE & FORECAST
22.9 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
22.9.1 MARKET SIZE & FORECAST
22.10 US
22.10.1 MARKET SNAPSHOT & GROWTH ENGINE
22.10.2 MARKET OVERVIEW
22.10.3 INVESTMENT: MARKET SIZE & FORECAST
22.10.4 AREA: MARKET SIZE & FORECAST
22.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
22.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
22.11 CANADA
22.11.1 MARKET SNAPSHOT & GROWTH ENGINE
22.11.2 MARKET OVERVIEW
22.11.3 INVESTMENT: MARKET SIZE & FORECAST
22.11.4 AREA: MARKET SIZE & FORECAST
22.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
22.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

23 LATIN AMERICA
23.1 INVESTMENT: SNAPSHOT & GROWTH ENGINE
23.2 AREA: SNAPSHOT & GROWTH ENGINE
23.3 POWER CAPACITY: SNAPSHOT & GROWTH ENGINE
23.4 MARKET OVERVIEW
23.5 INVESTMENT: MARKET SIZE & FORECAST
23.1 AREA: MARKET SIZE & FORECAST
23.2 POWER CAPACITY: MARKET SIZE & FORECAST
23.3 BRAZIL
23.3.1 MARKET SNAPSHOT & GROWTH ENGINE
23.3.2 MARKET OVERVIEW
23.3.3 INVESTMENT: MARKET SIZE & FORECAST
23.3.4 AREA: MARKET SIZE & FORECAST
23.3.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.3.6 INFRASTRUCTURE: MARKET SIZE & FORECAST
23.4 CHILE
23.4.1 MARKET SNAPSHOT & GROWTH ENGINE
23.4.2 MARKET OVERVIEW
23.4.3 INVESTMENT: MARKET SIZE & FORECAST
23.4.4 AREA: MARKET SIZE & FORECAST
23.4.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.4.6 INFRASTRUCTURE: MARKET SIZE & FORECAST
23.5 COLOMBIA
23.5.1 MARKET SNAPSHOT & GROWTH ENGINE
23.5.2 MARKET OVERVIEW
23.5.3 INVESTMENT: MARKET SIZE & FORECAST
23.5.4 AREA: MARKET SIZE & FORECAST
23.5.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.5.6 INFRASTRUCTURE: MARKET SIZE & FORECAST
23.6 MEXICO
23.6.1 MARKET SNAPSHOT & GROWTH ENGINE
23.6.2 MARKET OVERVIEW
23.6.3 INVESTMENT: MARKET SIZE & FORECAST
23.6.4 AREA: MARKET SIZE & FORECAST
23.6.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.6.6 INFRASTRUCTURE: MARKET SIZE & FORECAST
23.7 REST OF LATIN AMERICA
23.7.1 MARKET SNAPSHOT & GROWTH ENGINE
23.7.2 MARKET OVERVIEW
23.7.3 INVESTMENT: MARKET SIZE & FORECAST
23.7.4 AREA: MARKET SIZE & FORECAST
23.7.5 POWER CAPACITY: MARKET SIZE & FORECAST
23.7.6 INFRASTRUCTURE: MARKET SIZE & FORECAST

24 WESTERN EUROPE
24.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
24.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
24.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
24.4 UK
24.4.1 MARKET SNAPSHOT & GROWTH ENGINE
24.4.2 MARKET OVERVIEW
24.4.3 INVESTMENT: MARKET SIZE & FORECAST
24.4.4 AREA: MARKET SIZE & FORECAST
24.4.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.4.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.5 GERMANY
24.5.1 MARKET SNAPSHOT & GROWTH ENGINE
24.5.2 MARKET OVERVIEW
24.5.3 INVESTMENT: MARKET SIZE & FORECAST
24.5.4 AREA: MARKET SIZE & FORECAST
24.5.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.5.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.6 FRANCE
24.6.1 MARKET SNAPSHOT & GROWTH ENGINE
24.6.2 MARKET OVERVIEW
24.6.3 INVESTMENT: MARKET SIZE & FORECAST
24.6.4 AREA: MARKET SIZE & FORECAST
24.6.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.6.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.7 NETHERLANDS
24.7.1 MARKET SNAPSHOT & GROWTH ENGINE
24.7.2 MARKET OVERVIEW
24.7.3 INVESTMENT: MARKET SIZE & FORECAST
24.7.4 AREA: MARKET SIZE & FORECAST
24.7.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.7.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.8 IRELAND
24.8.1 MARKET SNAPSHOT & GROWTH ENGINE
24.8.2 MARKET OVERVIEW
24.8.3 INVESTMENT: MARKET SIZE & FORECAST
24.8.4 AREA: MARKET SIZE & FORECAST
24.8.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.8.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.9 SWITZERLAND
24.9.1 MARKET SNAPSHOT & GROWTH ENGINE
24.9.2 MARKET OVERVIEW
24.9.3 INVESTMENT: MARKET SIZE & FORECAST
24.9.4 AREA: MARKET SIZE & FORECAST
24.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.10 ITALY
24.10.1 MARKET SNAPSHOT & GROWTH ENGINE
24.10.2 MARKET OVERVIEW
24.10.3 INVESTMENT: MARKET SIZE & FORECAST
24.10.4 AREA: MARKET SIZE & FORECAST
24.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.11 SPAIN
24.11.1 MARKET SNAPSHOT & GROWTH ENGINE
24.11.2 MARKET OVERVIEW
24.11.3 INVESTMENT: MARKET SIZE & FORECAST
24.11.4 AREA: MARKET SIZE & FORECAST
24.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.12 BELGIUM
24.12.1 MARKET SNAPSHOT & GROWTH ENGINE
24.12.2 MARKET OVERVIEW
24.12.3 INVESTMENT: MARKET SIZE & FORECAST
24.12.4 AREA: MARKET SIZE & FORECAST
24.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.13 PORTUGAL
24.13.1 MARKET SNAPSHOT & GROWTH ENGINE
24.13.2 MARKET OVERVIEW
24.13.3 INVESTMENT: MARKET SIZE & FORECAST
24.13.4 AREA: MARKET SIZE & FORECAST
24.13.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.13.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
24.14 OTHER WESTERN EUROPEAN COUNTRIES
24.14.1 MARKET SNAPSHOT & GROWTH ENGINE
24.14.2 MARKET OVERVIEW
24.14.3 INVESTMENT: MARKET SIZE & FORECAST
24.14.4 AREA: MARKET SIZE & FORECAST
24.14.5 POWER CAPACITY: MARKET SIZE & FORECAST
24.14.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

25 NORDIC
25.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
25.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
25.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
25.4 DENMARK
25.4.1 MARKET SNAPSHOT
25.4.2 MARKET OVERVIEW
25.4.3 INVESTMENT: MARKET SIZE & FORECAST
25.4.4 AREA: MARKET SIZE & FORECAST
25.4.5 POWER CAPACITY: MARKET SIZE & FORECAST
25.4.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
25.5 SWEDEN
25.5.1 MARKET SNAPSHOT
25.5.2 MARKET OVERVIEW
25.5.3 INVESTMENT: MARKET SIZE & FORECAST
25.5.4 AREA: MARKET SIZE & FORECAST
25.5.5 POWER CAPACITY: MARKET SIZE & FORECAST
25.5.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
25.6 NORWAY
25.6.1 MARKET SNAPSHOT
25.6.2 MARKET OVERVIEW
25.6.3 INVESTMENT: MARKET SIZE & FORECAST
25.6.4 AREA: MARKET SIZE & FORECAST
25.6.5 POWER CAPACITY: MARKET SIZE & FORECAST
25.6.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
25.7 FINLAND & ICELAND
25.7.1 MARKET SNAPSHOT
25.7.2 MARKET OVERVIEW
25.7.3 INVESTMENT: MARKET SIZE & FORECAST
25.7.4 AREA: MARKET SIZE & FORECAST
25.7.5 POWER CAPACITY: MARKET SIZE & FORECAST
25.7.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

26 CENTRAL & EASTERN EUROPE
26.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
26.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
26.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
26.4 MARKET OVERVIEW
26.5 INVESTMENT: MARKET SIZE & FORECAST
26.6 AREA: MARKET SIZE & FORECAST
26.7 POWER CAPACITY: MARKET SIZE & FORECAST
26.8 RUSSIA
26.8.1 MARKET SNAPSHOT & GROWTH ENGINE
26.8.2 MARKET OVERVIEW
26.8.3 INVESTMENT: MARKET SIZE & FORECAST
26.8.4 AREA: MARKET SIZE & FORECAST
26.8.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.8.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26.9 POLAND
26.9.1 MARKET SNAPSHOT & GROWTH ENGINE
26.9.2 MARKET OVERVIEW
26.9.3 INVESTMENT: MARKET SIZE & FORECAST
26.9.4 AREA: MARKET SIZE & FORECAST
26.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26.10 AUSTRIA
26.10.1 MARKET SNAPSHOT & GROWTH ENGINE
26.10.2 MARKET OVERVIEW
26.10.3 INVESTMENT: MARKET SIZE & FORECAST
26.10.4 AREA: MARKET SIZE & FORECAST
26.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26.11 CZECH REPUBLIC
26.11.1 MARKET SNAPSHOT & GROWTH ENGINE
26.11.2 MARKET OVERVIEW
26.11.3 INVESTMENT: MARKET SIZE & FORECAST
26.11.4 AREA: MARKET SIZE & FORECAST
26.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
26.12 OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
26.12.1 MARKET SNAPSHOT & GROWTH ENGINE
26.12.2 MARKET OVERVIEW
26.12.3 INVESTMENT: MARKET SIZE & FORECAST
26.12.4 AREA: MARKET SIZE & FORECAST
26.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
26.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

27 MIDDLE EAST
27.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
27.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
27.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
27.4 MARKET OVERVIEW
27.5 INVESTMENT: MARKET SIZE & FORECAST
27.6 AREA: MARKET SIZE & FORECAST
27.7 POWER CAPACITY: MARKET SIZE & FORECAST
27.8 UAE
27.8.1 MARKET SNAPSHOT & GROWTH ENGINE
27.8.2 MARKET OVERVIEW
27.8.3 INVESTMENT: MARKET SIZE & FORECAST
27.8.4 AREA: MARKET SIZE AND FORECAST
27.8.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.8.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.9 SAUDI ARABIA
27.9.1 MARKET SNAPSHOT & GROWTH ENGINE
27.9.2 MARKET OVERVIEW
27.9.3 INVESTMENT: MARKET SIZE & FORECAST
27.9.4 AREA: MARKET SIZE & FORECAST
27.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.10 ISRAEL
27.10.1 MARKET SNAPSHOT & GROWTH ENGINE
27.10.2 MARKET OVERVIEW
27.10.3 INVESTMENT: MARKET SIZE & FORECAST
27.10.4 AREA: MARKET SIZE & FORECAST
27.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.11 OMAN
27.11.1 MARKET SNAPSHOT & GROWTH ENGINE
27.11.2 MARKET OVERVIEW
27.11.3 INVESTMENT: MARKET SIZE & FORECAST
27.11.4 AREA: MARKET SIZE & FORECAST
27.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.12 QATAR
27.12.1 MARKET SNAPSHOT & GROWTH ENGINE
27.12.2 MARKET OVERVIEW
27.12.3 INVESTMENT: MARKET SIZE & FORECAST
27.12.4 AREA: MARKET SIZE & FORECAST
27.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.13 KUWAIT
27.13.1 MARKET SNAPSHOT & GROWTH ENGINE
27.13.2 MARKET OVERVIEW
27.13.3 INVESTMENT: MARKET FORECAST & FORECAST
27.13.4 AREA: MARKET SIZE & FORECAST
27.13.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.13.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.14 JORDAN
27.14.1 MARKET SNAPSHOT & GROWTH ENGINE
27.14.2 MARKET OVERVIEW
27.14.3 INVESTMENT: MARKET SIZE & FORECAST
27.14.4 AREA: MARKET SIZE & FORECAST
27.14.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.14.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.15 BAHRAIN
27.15.1 MARKET SNAPSHOT & GROWTH ENGINE
27.15.2 MARKET OVERVIEW
27.15.3 INVESTMENT: MARKET SIZE & FORECAST
27.15.4 AREA: MARKET SIZE & FORECAST
27.15.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.15.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
27.16 OTHER MIDDLE EASTERN COUNTRIES
27.16.1 MARKET SNAPSHOT & GROWTH ENGINE
27.16.2 MARKET OVERVIEW
27.16.3 INVESTMENT: MARKET SIZE & FORECAST
27.16.4 AREA: MARKET SIZE & FORECAST
27.16.5 POWER CAPACITY: MARKET SIZE & FORECAST
27.16.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

28 AFRICA
28.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
28.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
28.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
28.4 MARKET OVERVIEW
28.5 INVESTMENT: MARKET SIZE & FORECAST
28.6 AREA: MARKET SIZE & FORECAST
28.7 POWER CAPACITY: MARKET SIZE & FORECAST
28.8 SOUTH AFRICA
28.8.1 MARKET SNAPSHOT & GROWTH ENGINE
28.8.2 MARKET OVERVIEW
28.8.3 INVESTMENT: MARKET SIZE & FORECAST
28.8.4 AREA: MARKET SIZE & FORECAST
28.8.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.8.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28.9 KENYA
28.9.1 MARKET SNAPSHOT & GROWTH ENGINE
28.9.2 MARKET OVERVIEW
28.9.3 INVESTMENT: MARKET SIZE & FORECAST
28.9.4 AREA: MARKET SIZE & FORECAST
28.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28.10 NIGERIA
28.10.1 MARKET SNAPSHOT & GROWTH ENGINE
28.10.2 MARKET OVERVIEW
28.10.3 INVESTMENT: MARKET SIZE & FORECAST
28.10.4 AREA: MARKET SIZE & FORECAST
28.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28.11 EGYPT
28.11.1 MARKET SNAPSHOT & GROWTH ENGINE
28.11.2 MARKET OVERVIEW
28.11.3 INVESTMENT: MARKET SIZE & FORECAST
28.11.4 AREA: MARKET SIZE & FORECAST
28.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28.12 ETHIOPIA
28.12.1 MARKET SNAPSHOT & GROWTH ENGINE
28.12.2 MARKET OVERVIEW
28.12.3 INVESTMENT: MARKET SIZE & FORECAST
28.12.4 AREA: MARKET SIZE & FORECAST
28.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
28.13 OTHER AFRICAN COUNTRIES
28.13.1 MARKET SNAPSHOT & GROWTH ENGINE
28.13.2 MARKET OVERVIEW
28.13.3 INVESTMENT: MARKET SIZE & FORECAST
28.13.4 AREA: MARKET SIZE & FORECAST
28.13.5 POWER CAPACITY: MARKET SIZE & FORECAST
28.13.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

29 APAC
29.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
29.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
29.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
29.4 MARKET OVERVIEW
29.5 INVESTMENT: MARKET SIZE & FORECAST
29.6 AREA: MARKET SIZE & FORECAST
29.7 POWER CAPACITY: MARKET SIZE & FORECAST
29.8 CHINA
29.8.1 MARKET SNAPSHOT & GROWTH ENGINE
29.8.2 MARKET OVERVIEW
29.8.3 INVESTMENT: MARKET SIZE & FORECAST
29.8.4 AREA: MARKET SIZE & FORECAST
29.8.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.8.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.9 HONG KONG
29.9.1 MARKET SNAPSHOT & GROWTH ENGINE
29.9.2 MARKET OVERVIEW
29.9.3 INVESTMENT: MARKET SIZE & FORECAST
29.9.4 AREA: MARKET SIZE & FORECAST
29.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.10 AUSTRALIA
29.10.1 MARKET SNAPSHOT & GROWTH ENGINE
29.10.2 MARKET OVERVIEW
29.10.3 INVESTMENT: MARKET SIZE & FORECAST
29.10.4 AREA: MARKET SIZE & FORECAST
29.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.11 NEW ZEALAND
29.11.1 MARKET SNAPSHOT & GROWTH ENGINE
29.11.2 MARKET OVERVIEW
29.11.3 INVESTMENT: MARKET SIZE & FORECAST
29.11.4 AREA: MARKET SIZE & FORECAST
29.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.12 JAPAN
29.12.1 MARKET SNAPSHOT & GROWTH ENGINE
29.12.2 MARKET OVERVIEW
29.12.3 INVESTMENT: MARKET SIZE & FORECAST
29.12.4 AREA: MARKET SIZE & FORECAST
29.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.13 INDIA
29.13.1 MARKET SNAPSHOT & GROWTH ENGINE
29.13.2 MARKET OVERVIEW
29.13.3 INVESTMENT: MARKET SIZE & FORECAST
29.13.4 AREA: MARKET SIZE & FORECAST
29.13.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.13.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.14 SOUTH KOREA
29.14.1 MARKET SNAPSHOT & GROWTH ENGINE
29.14.2 MARKET OVERVIEW
29.14.3 INVESTMENT: MARKET SIZE & FORECAST
29.14.4 AREA: MARKET SIZE & FORECAST
29.14.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.14.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.15 TAIWAN
29.15.1 MARKET SNAPSHOT & GROWTH ENGINE
29.15.2 MARKET OVERVIEW
29.15.3 INVESTMENT: MARKET SIZE & FORECAST
29.15.4 AREA: MARKET SIZE & FORECAST
29.15.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.15.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
29.16 REST OF APAC
29.16.1 MARKET SNAPSHOT & GROWTH ENGINE
29.16.2 MARKET OVERVIEW
29.16.3 INVESTMENT: MARKET SIZE & FORECAST
29.16.4 AREA: MARKET SIZE & FORECAST
29.16.5 POWER CAPACITY: MARKET SIZE & FORECAST
29.16.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

30 SOUTHEAST ASIA
30.1 INVESTMENT: MARKET SNAPSHOT & GROWTH ENGINE
30.2 AREA: MARKET SNAPSHOT & GROWTH ENGINE
30.3 POWER CAPACITY: MARKET SNAPSHOT & GROWTH ENGINE
30.4 MARKET OVERVIEW
30.5 INVESTMENT: MARKET SIZE & FORECAST
30.6 AREA: MARKET SIZE & FORECAST
30.7 POWER CAPACITY: MARKET SIZE & FORECAST
30.8 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.9 SINGAPORE
30.9.1 MARKET SNAPSHOT & GROWTH ENGINE
30.9.2 MARKET OVERVIEW
30.9.3 INVESTMENT: MARKET SIZE & FORECAST
30.9.4 AREA: MARKET SIZE & FORECAST
30.9.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.9.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.10 INDONESIA
30.10.1 MARKET SNAPSHOT & GROWTH ENGINE
30.10.2 MARKET OVERVIEW
30.10.3 INVESTMENT: MARKET SIZE & FORECAST
30.10.4 AREA: MARKET SIZE & FORECAST
30.10.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.10.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.11 MALAYSIA
30.11.1 MARKET SNAPSHOT & GROWTH ENGINE
30.11.2 MARKET OVERVIEW
30.11.3 INVESTMENT: MARKET SIZE & FORECAST
30.11.4 AREA: MARKET SIZE & FORECAST
30.11.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.11.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.12 THAILAND
30.12.1 MARKET SNAPSHOT & GROWTH ENGINE
30.12.2 MARKET OVERVIEW
30.12.3 INVESTMENT: MARKET SIZE & FORECAST
30.12.4 AREA: MARKET SIZE & FORECAST
30.12.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.12.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.13 VIETNAM
30.13.1 MARKET SNAPSHOT & GROWTH ENGINE
30.13.2 MARKET OVERVIEW
30.13.3 INVESTMENT: MARKET SIZE & FORECAST
30.13.4 AREA: MARKET SIZE & FORECAST
30.13.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.13.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST
30.14 OTHER SOUTHEAST ASIAN COUNTRIES
30.14.1 MARKET SNAPSHOT & GROWTH ENGINE
30.14.2 MARKET OVERVIEW
30.14.3 INVESTMENT: MARKET SIZE & FORECAST
30.14.4 AREA: MARKET SIZE & FORECAST
30.14.5 POWER CAPACITY: MARKET SIZE & FORECAST
30.14.6 SUPPORT INFRASTRUCTURE: MARKET SIZE & FORECAST

31 COMPETITIVE LANDSCAPE
31.1 ELECTRICAL INFRASTRUCTURE
31.2 MECHANICAL INFRASTRUCTURE
31.3 GENERAL CONSTRUCTION
31.4 DATA CENTER INVESTORS

32 KEY DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
32.1 ABB
32.1.1 BUSINESS OVERVIEW
32.1.2 PRODUCT OFFERINGS
32.2 CATERPILLAR
32.2.1 BUSINESS OVERVIEW
32.2.2 PRODUCT OFFERINGS
32.3 CUMMINS
32.3.1 BUSINESS OVERVIEW
32.3.2 PRODUCT OFFERINGS
32.4 DELTA ELECTRONICS
32.4.1 BUSINESS OVERVIEW
32.4.2 PRODUCT OFFERINGS
32.5 EATON
32.5.1 BUSINESS OVERVIEW
32.5.2 PRODUCT OFFERINGS
32.6 LEGRAND
32.6.1 BUSINESS OVERVIEW
32.6.2 PRODUCT OFFERINGS
32.7 ROLLS-ROYCE
32.7.1 BUSINESS OVERVIEW
32.7.2 PRODUCT OFFERINGS
32.8 SCHNEIDER ELECTRIC
32.8.1 BUSINESS OVERVIEW
32.8.2 PRODUCT OFFERINGS
32.9 STULZ
32.9.1 BUSINESS OVERVIEW
32.9.2 PRODUCT OFFERINGS
32.10 VERTIV
32.10.1 BUSINESS OVERVIEW
32.10.2 PRODUCT OFFERINGS

33 OTHER DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
33.1 3M
33.1.1 BUSINESS OVERVIEW
33.1.2 PRODUCT OFFERINGS
33.2 AIREDALE
33.2.1 BUSINESS OVERVIEW
33.2.2 PRODUCT OFFERINGS
33.2.3 KEY NEWS
33.3 ALFA LAVAL
33.3.1 BUSINESS OVERVIEW
33.3.2 PRODUCT OFFERINGS
33.4 ASETEK
33.4.1 BUSINESS OVERVIEW
33.4.2 PRODUCT OFFERINGS
33.5 ASSA ABLOY
33.5.1 BUSINESS OVERVIEW
33.5.2 PRODUCT OFFERINGS
33.6 BLOOM ENERGY
33.6.1 BUSINESS OVERVIEW
33.6.2 PRODUCT OFFERINGS
33.7 CARRIER
33.7.1 BUSINESS OVERVIEW
33.7.2 PRODUCT OFFERINGS
33.8 CONDAIR
33.8.1 BUSINESS OVERVIEW
33.8.2 PRODUCT OFFERINGS
33.9 CORMANT
33.9.1 BUSINESS OVERVIEW
33.9.2 PRODUCT OFFERINGS
33.10 CYBER POWER SYSTEMS
33.10.1 BUSINESS OVERVIEW
33.10.2 PRODUCT OFFERINGS
33.11 DAIKIN APPLIED
33.11.1 BUSINESS OVERVIEW
33.11.2 PRODUCT OFFERINGS
33.12 DATA AIRE
33.12.1 BUSINESS OVERVIEW
33.12.2 PRODUCT OFFERINGS
33.13 ENLOGIC
33.13.1 BUSINESS OVERVIEW
33.13.2 PRODUCT OFFERINGS
33.14 FNT SOFTWARE
33.14.1 BUSINESS OVERVIEW
33.14.2 PRODUCT OFFERINGS
33.15 GENERAC POWER SYSTEMS
33.15.1 BUSINESS OVERVIEW
33.15.2 PRODUCT OFFERINGS
33.16 GREEN REVOLUTION COOLING (GRC)
33.16.1 BUSINESS OVERVIEW
33.16.2 PRODUCT OFFERINGS
33.17 HITEC POWER PROTECTION
33.17.1 BUSINESS OVERVIEW
33.17.2 PRODUCT OFFERINGS
33.18 HONEYWELL
33.18.1 BUSINESS OVERVIEW
33.18.2 PRODUCT OFFERINGS
33.19 JOHNSON CONTROLS
33.19.1 BUSINESS OVERVIEW
33.19.2 PRODUCT OFFERINGS
33.20 KOHLER
33.20.1 BUSINESS OVERVIEW
33.20.2 PRODUCT OFFERINGS
33.21 KYOTOCOOLING
33.21.1 BUSINESS OVERVIEW
33.21.2 PRODUCT OFFERINGS
33.22 MITSUBISHI ELECTRIC
33.22.1 BUSINESS OVERVIEW
33.22.2 PRODUCT OFFERINGS
33.23 MUNTERS
33.23.1 BUSINESS OVERVIEW
33.23.2 PRODUCT OFFERINGS
33.24 NATRON ENERGY
33.24.1 BUSINESS OVERVIEW
33.24.2 PRODUCT OFFERINGS
33.25 NETZOOM
33.25.1 BUSINESS OVERVIEW
33.25.2 PRODUCT OFFERINGS
33.26 NLYTE SOFTWARE
33.26.1 BUSINESS OVERVIEW
33.26.2 PRODUCT OFFERINGS
33.27 PANDUIT
33.27.1 BUSINESS OVERVIEW
33.27.2 PRODUCT OFFERINGS
33.28 PILLER POWER SYSTEMS
33.28.1 BUSINESS OVERVIEW
33.28.2 PRODUCT OFFERINGS
33.29 RITTAL
33.29.1 BUSINESS OVERVIEW
33.29.2 PRODUCT OFFERINGS
33.30 SIEMENS
33.30.1 BUSINESS OVERVIEW
33.30.2 PRODUCT OFFERINGS
33.31 TRANE (INGERSOLL RAND)
33.31.1 BUSINESS OVERVIEW
33.31.2 PRODUCT OFFERINGS
33.32 TRIPP LITE
33.32.1 BUSINESS OVERVIEW
33.32.2 PRODUCT OFFERINGS
33.33 YANMAR (HIMOINSA)
33.33.1 BUSINESS OVERVIEW
33.33.2 PRODUCT OFFERINGS
33.34 ZINCFIVE
33.34.1 BUSINESS OVERVIEW
33.34.2 PRODUCT OFFERINGS
33.34.3 KEY NEWS

34 KEY DATA CENTER CONTRACTORS
34.1 AECOM
34.1.1 BUSINESS OVERVIEW
34.1.2 SERVICE OFFERINGS
34.2 ARUP
34.2.1 BUSINESS OVERVIEW
34.2.2 SERVICE OFFERINGS
34.3 CORGAN
34.3.1 BUSINESS OVERVIEW
34.3.2 SERVICE OFFERINGS
34.4 DPR CONSTRUCTION
34.4.1 BUSINESS OVERVIEW
34.4.2 SERVICE OFFERINGS
34.5 FORTIS CONSTRUCTION
34.5.1 BUSINESS OVERVIEW
34.5.2 SERVICE OFFERINGS
34.6 HOLDER CONSTRUCTION
34.6.1 BUSINESS OVERVIEW
34.6.2 SERVICE OFFERINGS
34.7 JACOBS
34.7.1 BUSINESS OVERVIEW
34.7.2 SERVICE OFFERINGS
34.8 MERCURY
34.8.1 BUSINESS OVERVIEW
34.8.2 SERVICE OFFERINGS
34.9 RED ENGINEERING
34.9.1 BUSINESS OVERVIEW
34.9.2 SERVICE OFFERINGS
34.10 ROGERS-OBRIEN CONSTRUCTION
34.10.1 BUSINESS OVERVIEW
34.10.2 SERVICE OFFERINGS
34.11 SYSKA HENNESSY GROUP
34.11.1 BUSINESS OVERVIEW
34.11.2 SERVICE OFFERINGS
34.12 TURNER CONSTRUCTION
34.12.1 BUSINESS OVERVIEW
34.12.2 SERVICE OFFERINGS
34.13 TURNER & TOWNSEND
34.13.1 BUSINESS OVERVIEW
34.13.2 SERVICE OFFERINGS

35 OTHER DATA CENTER CONTRACTORS
35.1 ALFATECH
35.1.1 BUSINESS OVERVIEW
35.1.2 SERVICE OFFERINGS
35.2 ATKINS
35.2.1 BUSINESS OVERVIEW
35.2.2 SERVICE OFFERINGS
35.3 AURECON
35.3.1 BUSINESS OVERVIEW
35.3.2 SERVICE OFFERINGS
35.4 BASLER & HOFMANN
35.4.1 BUSINESS OVERVIEW
35.4.2 SERVICE OFFERINGS
35.5 BLUESCOPE CONSTRUCTION
35.5.1 BUSINESS OVERVIEW
35.5.2 SERVICE OFFERINGS
35.6 BRASFIELD & GORRIE
35.6.1 BUSINESS OVERVIEW
35.6.2 SERVICE OFFERINGS
35.7 CALLISONRTKL
35.7.1 BUSINESS OVERVIEW
35.7.2 SERVICE OFFERINGS
35.8 CAP INGELEC
35.8.1 BUSINESS OVERVIEW
35.8.2 SERVICE OFFERINGS
35.9 CLARK CONSTRUCTION GROUP
35.9.1 BUSINESS OVERVIEW
35.9.2 SERVICE OFFERINGS
35.10 CLIMATEC
35.10.1 BUSINESS OVERVIEW
35.10.2 SERVICE OFFERINGS
35.11 CLUNE CONSTRUCTION
35.11.1 BUSINESS OVERVIEW
35.11.2 SERVICE OFFERINGS
35.12 COWI
35.12.1 BUSINESS OVERVIEW
35.12.2 SERVICE OFFERINGS
35.13 DC PRO ENGINEERING
35.13.1 BUSINESS OVERVIEW
35.13.2 SERVICE OFFERINGS
35.14 DORNAN
35.14.1 BUSINESS OVERVIEW
35.14.2 SERVICE OFFERINGS
35.15 EDARAT GROUP
35.15.1 BUSINESS OVERVIEW
35.15.2 SERVICE OFFERINGS
35.16 EMCOR GROUP
35.16.1 BUSINESS OVERVIEW
35.16.2 SERVICE OFFERINGS
35.17 EYP MCF
35.17.1 BUSINESS OVERVIEW
35.17.2 SERVICE OFFERINGS
35.18 GENSLER
35.18.1 BUSINESS OVERVIEW
35.18.2 SERVICE OFFERINGS
35.19 FLUOR CORPORATION
35.19.1 BUSINESS OVERVIEW
35.19.2 SERVICE OFFERINGS
35.20 GILBANE BUILDING COMPANY
35.20.1 BUSINESS OVERVIEW
35.20.2 SERVICE OFFERINGS
35.21 HDR
35.21.1 BUSINESS OVERVIEW
35.21.2 SERVICE OFFERINGS
35.22 HITT CONTRACTING
35.22.1 BUSINESS OVERVIEW
35.22.2 SERVICE OFFERINGS
35.23 HOFFMAN CONSTRUCTION
35.23.1 BUSINESS OVERVIEW
35.23.2 SERVICE OFFERINGS
35.24 ISG
35.24.1 BUSINESS OVERVIEW
35.24.2 SERVICE OFFERINGS
35.25 JE DUNN CONSTRUCTION
35.25.1 BUSINESS OVERVIEW
35.25.2 SERVICE OFFERINGS
35.26 KIRBY GROUP ENGINEERING
35.26.1 BUSINESS OVERVIEW
35.26.2 SERVICE OFFERINGS
35.27 KW ENGINEERING
35.27.1 BUSINESS OVERVIEW
35.27.2 SERVICE OFFERINGS
35.28 KW MISSION CRITICAL ENGINEERING
35.28.1 BUSINESS OVERVIEW
35.28.2 SERVICE OFFERINGS
35.29 LAING OROURKE
35.29.1 BUSINESS OVERVIEW
35.29.2 SERVICE OFFERINGS
35.30 LINESIGHT
35.30.1 BUSINESS OVERVIEW
35.30.2 SERVICE OFFERINGS
35.31 M+W GROUP (EXYTE)
35.31.1 BUSINESS OVERVIEW
35.31.2 SERVICE OFFERINGS
35.32 MCLAREN CONSTRUCTION GROUP
35.32.1 BUSINESS OVERVIEW
35.32.2 SERVICE OFFERINGS
35.33 MORRISON HERSHFIELD
35.33.1 BUSINESS OVERVIEW
35.33.2 SERVICE OFFERINGS
35.34 MORTENSON
35.34.1 BUSINESS OVERVIEW
35.34.2 SERVICE OFFERINGS
35.35 PM GROUP
35.35.1 BUSINESS OVERVIEW
35.35.2 SERVICE OFFERINGS
35.36 QUARK
35.36.1 BUSINESS OVERVIEW
35.36.2 SERVICE OFFERINGS
35.37 ROSENDIN
35.37.1 BUSINESS OVERVIEW
35.37.2 SERVICE OFFERINGS
35.38 ROYAL HASKONINGDHV
35.38.1 BUSINESS OVERVIEW
35.38.2 SERVICE OFFERINGS
35.39 SALUTE MISSION CRITICAL
35.39.1 BUSINESS OVERVIEW
35.39.2 SERVICE OFFERINGS
35.40 SHEEHAN NAGLE HARTRAY ARCHITECTS
35.40.1 BUSINESS OVERVIEW
35.40.2 SERVICE OFFERINGS
35.41 SKANSKA
35.41.1 BUSINESS OVERVIEW
35.41.2 SERVICE OFFERINGS
35.42 SOUTHLAND INDUSTRIES
35.42.1 BUSINESS OVERVIEW
35.42.2 SERVICE OFFERINGS
35.43 STURGEON ELECTRIC COMPANY
35.43.1 BUSINESS OVERVIEW
35.43.2 SERVICE OFFERINGS
35.44 STRUCTURE TONE
35.44.1 BUSINESS OVERVIEW
35.44.2 SERVICE OFFERINGS
35.45 SWECO
35.45.1 BUSINESS OVERVIEW
35.45.2 SERVICE OFFERINGS
35.46 THE MULHERN GROUP
35.46.1 BUSINESS OVERVIEW
35.46.2 SERVICE OFFERINGS
35.47 THE WALSH GROUP
35.47.1 BUSINESS OVERVIEW
35.47.2 SERVICE OFFERINGS
35.48 THE WEITZ COMPANY
35.48.1 BUSINESS OVERVIEW
35.48.2 SERVICE OFFERINGS
35.49 TRINITY GROUP CONSTRUCTION
35.49.1 BUSINESS OVERVIEW
35.49.2 SERVICE OFFERINGS

36 KEY DATA CENTER OPERATORS
36.1 21 VIANET GROUP (VNET)
36.1.1 BUSINESS OVERVIEW
36.1.2 SERVICE OFFERINGS
36.2 AMAZON WEB SERVICES
36.2.1 BUSINESS OVERVIEW
36.2.2 SERVICE OFFERINGS
36.2.3 KEY NEWS
36.3 APPLE
36.3.1 BUSINESS OVERVIEW
36.3.2 SERVICE OFFERINGS
36.3.3 KEY NEWS
36.4 CHINA TELECOM
36.4.1 BUSINESS OVERVIEW
36.4.2 SERVICE OFFERINGS
36.5 COLT DATA CENTRE SERVICES (COLT DCS)
36.5.1 BUSINESS OVERVIEW
36.5.2 SERVICE OFFERINGS
36.5.3 KEY NEWS
36.6 COMPASS DATACENTERS
36.6.1 BUSINESS OVERVIEW
36.6.2 SERVICE OFFERINGS
36.6.3 KEY NEWS
36.7 CYRUSONE
36.7.1 BUSINESS OVERVIEW
36.7.2 SERVICE OFFERINGS
36.7.3 KEY NEWS
36.8 DIGITAL REALTY
36.8.1 BUSINESS OVERVIEW
36.8.2 SERVICE OFFERINGS
36.8.3 KEY NEWS
36.9 EDGECONNEX (EQT INFRASTRUCTURE)
36.9.1 BUSINESS OVERVIEW
36.9.2 SERVICE OFFERINGS
36.9.3 KEY NEWS
36.10 EQUINIX
36.10.1 BUSINESS OVERVIEW
36.10.2 SERVICE OFFERINGS
36.10.3 KEY NEWS
36.11 GDS SERVICES
36.11.1 BUSINESS OVERVIEW
36.11.2 SERVICE OFFERINGS
36.11.3 KEY NEWS
36.12 GLOBAL SWITCH
36.12.1 BUSINESS OVERVIEW
36.12.2 SERVICE OFFERINGS
36.13 GOOGLE
36.13.1 BUSINESS OVERVIEW
36.13.2 SERVICE OFFERINGS
36.13.3 KEY NEWS
36.14 IRON MOUNTAIN
36.14.1 BUSINESS OVERVIEW
36.14.2 SERVICE OFFERINGS
36.14.3 KEY NEWS
36.15 META (FACEBOOK)
36.15.1 BUSINESS OVERVIEW
36.15.2 SERVICE OFFERINGS
36.15.3 KEY NEWS
36.16 MICROSOFT
36.16.1 BUSINESS OVERVIEW
36.16.2 SERVICE OFFERINGS
36.16.3 KEY NEWS
36.17 NTT GLOBAL DATA CENTERS
36.17.1 BUSINESS OVERVIEW
36.17.2 SERVICE OFFERINGS
36.17.3 KEY NEWS
36.18 QTS REALTY TRUST
36.18.1 BUSINESS OVERVIEW
36.18.2 SERVICE OFFERINGS
36.18.3 KEY NEWS
36.19 STACK INFRASTRUCTURE
36.19.1 BUSINESS OVERVIEW
36.19.2 SERVICE OFFERINGS
36.19.3 KEY NEWS
36.20 ST TELEMEDIA GLOBAL DATA CENTRES
36.20.1 BUSINESS OVERVIEW
36.20.2 SERVICE OFFERINGS
36.20.3 KEY NEWS
36.21 VANTAGE DATA CENTERS
36.21.1 BUSINESS OVERVIEW
36.21.2 SERVICE OFFERINGS
36.21.3 KEY NEWS

37 OTHER DATA CENTER OPERATORS
37.1 3DATA
37.1.1 BUSINESS OVERVIEW
37.1.2 SERVICE OFFERINGS
37.1.3 KEY NEWS
37.2 AFRICA DATA CENTRES
37.2.1 BUSINESS OVERVIEW
37.2.2 SERVICE OFFERINGS
37.2.3 KEY NEWS
37.3 AIRTRUNK
37.3.1 BUSINESS OVERVIEW
37.3.2 SERVICE OFFERINGS
37.3.3 KEY NEWS
37.4 ALIGNED
37.4.1 BUSINESS OVERVIEW
37.4.2 SERVICE OFFERINGS
37.4.3 KEY NEWS
37.5 AMERICAN TOWER
37.5.1 BUSINESS OVERVIEW
37.5.2 SERVICE OFFERINGS
37.5.3 KEY NEWS
37.6 AQ COMPUTE
37.6.1 BUSINESS OVERVIEW
37.6.2 SERVICE OFFERINGS
37.6.3 KEY NEWS
37.7 ARUBA
37.7.1 BUSINESS OVERVIEW
37.7.2 SERVICE OFFERINGS
37.7.3 KEY NEWS
37.8 ATLASEDGE
37.8.1 BUSINESS OVERVIEW
37.8.2 SERVICE OFFERINGS
37.8.3 KEY NEWS
37.9 ATNORTH
37.9.1 BUSINESS OVERVIEW
37.9.2 SERVICE OFFERINGS
37.9.3 KEY NEWS
37.10 AT TOKYO
37.10.1 BUSINESS OVERVIEW
37.10.2 SERVICE OFFERINGS
37.10.3 KEY NEWS
37.11 BDX (BIG DATA EXCHANGE)
37.11.1 BUSINESS OVERVIEW
37.11.2 SERVICE OFFERINGS
37.11.3 KEY NEWS
37.12 BULK INFRASTRUCTURE
37.12.1 BUSINESS OVERVIEW
37.12.2 SERVICE OFFERINGS
37.12.3 KEY NEWS
37.13 BRIDGE DATA CENTRES
37.13.1 BUSINESS OVERVIEW
37.13.2 SERVICE OFFERINGS
37.13.3 KEY NEWS
37.14 CDC DATA CENTRES
37.14.1 BUSINESS OVERVIEW
37.14.2 SERVICE OFFERINGS
37.14.3 KEY NEWS
37.15 CHAYORA
37.15.1 BUSINESS OVERVIEW
37.15.2 SERVICE OFFERINGS
37.16 CHINA MOBILE
37.16.1 BUSINESS OVERVIEW
37.16.2 SERVICE OFFERINGS
37.17 CHINDATA
37.17.1 BUSINESS OVERVIEW
37.17.2 SERVICE OFFERINGS
37.18 CLOUDHQ
37.18.1 BUSINESS OVERVIEW
37.18.2 SERVICE OFFERINGS
37.18.3 KEY NEWS
37.19 COLOGIX
37.19.1 BUSINESS OVERVIEW
37.19.2 SERVICE OFFERINGS
37.19.3 KEY NEWS
37.20 COPT DATA CENTER SOLUTIONS
37.20.1 BUSINESS OVERVIEW
37.20.2 SERVICE OFFERINGS
37.20.3 KEY NEWS
37.21 CTRLS DATACENTERS
37.21.1 BUSINESS OVERVIEW
37.21.2 SERVICE OFFERINGS
37.21.3 KEY NEWS
37.22 CYXTERA TECHNOLOGIES
37.22.1 BUSINESS OVERVIEW
37.22.2 SERVICE OFFERINGS
37.22.3 KEY NEWS
37.23 DATA4
37.23.1 BUSINESS OVERVIEW
37.23.2 SERVICE OFFERINGS
37.23.3 KEY NEWS
37.24 DATABANK
37.24.1 BUSINESS OVERVIEW
37.24.2 SERVICE OFFERINGS
37.24.3 KEY NEWS
37.25 DC BLOX
37.25.1 BUSINESS OVERVIEW
37.25.2 SERVICE OFFERINGS
37.25.3 KEY NEWS
37.26 ELEMENT CRITICAL
37.26.1 BUSINESS OVERVIEW
37.26.2 SERVICE OFFERINGS
37.26.3 KEY NEWS
37.27 EPLDT
37.27.1 BUSINESS OVERVIEW
37.27.2 SERVICE OFFERINGS
37.27.3 KEY NEWS
37.28 ESTRUXTURE DATA CENTERS
37.28.1 BUSINESS OVERVIEW
37.28.2 SERVICE OFFERINGS
37.29 FIFTEENFORTYSEVEN CRITICAL SYSTEMS REALTY (1547)
37.29.1 BUSINESS OVERVIEW
37.29.2 SERVICE OFFERINGS
37.29.3 KEY NEWS
37.30 FLEXENTIAL
37.30.1 BUSINESS OVERVIEW
37.30.2 SERVICE OFFERINGS
37.30.3 KEY NEWS
37.31 GREEN MOUNTAIN
37.31.1 BUSINESS OVERVIEW
37.31.2 SERVICE OFFERINGS
37.31.3 KEY NEWS
37.32 H5 DATA CENTERS
37.32.1 BUSINESS OVERVIEW
37.32.2 SERVICE OFFERINGS
37.32.3 KEY NEWS
37.33 HOSTDIME
37.33.1 BUSINESS OVERVIEW
37.33.2 SERVICE OFFERINGS
37.33.3 KEY NEWS
37.34 KDDI (TELEHOUSE)
37.34.1 BUSINESS OVERVIEW
37.34.2 SERVICE OFFERINGS
37.34.3 KEY NEWS
37.35 KEPPEL DATA CENTRES
37.35.1 BUSINESS OVERVIEW
37.35.2 SERVICE OFFERINGS
37.35.3 KEY NEWS
37.36 LG UPLUS
37.36.1 BUSINESS OVERVIEW
37.36.2 SERVICE OFFERINGS
37.37 MAINCUBES ONE
37.37.1 BUSINESS OVERVIEW
37.37.2 SERVICE OFFERINGS
37.37.3 KEY NEWS
37.38 MAINONE (EQUINIX)
37.38.1 BUSINESS OVERVIEW
37.38.2 SERVICE OFFERINGS
37.38.3 KEY NEWS
37.39 MILLICOM (TIGO)
37.39.1 BUSINESS OVERVIEW
37.39.2 SERVICE OFFERINGS
37.40 NEXTDC
37.40.1 BUSINESS OVERVIEW
37.40.2 SERVICE OFFERINGS
37.40.3 KEY NEWS
37.41 ODATA
37.41.1 BUSINESS OVERVIEW
37.41.2 SERVICE OFFERINGS
37.41.3 KEY NEWS
37.42 ORANGE BUSINESS SERVICES
37.42.1 BUSINESS OVERVIEW
37.42.2 SERVICE OFFERINGS
37.42.3 KEY NEWS
37.43 PRIME DATA CENTERS
37.43.1 BUSINESS OVERVIEW
37.43.2 SERVICE OFFERINGS
37.43.3 KEY NEWS
37.44 PRINCETON DIGITAL GROUP (PDG)
37.44.1 BUSINESS OVERVIEW
37.44.2 SERVICE OFFERINGS
37.44.3 KEY NEWS
37.45 PROXIMITY DATA CENTRES
37.45.1 BUSINESS OVERVIEW
37.45.2 SERVICE OFFERINGS
37.45.3 KEY NEWS
37.46 RAXIO GROUP
37.46.1 BUSINESS OVERVIEW
37.46.2 SERVICE OFFERINGS
37.46.3 KEY NEWS
37.47 ROSTELECOM DATA CENTERS
37.47.1 BUSINESS OVERVIEW
37.47.2 SERVICE OFFERINGS
37.47.3 KEY NEWS
37.48 SABEY DATA CENTERS
37.48.1 BUSINESS OVERVIEW
37.48.2 SERVICE OFFERINGS
37.48.3 KEY NEWS
37.49 SCALA DATA CENTERS
37.49.1 BUSINESS OVERVIEW
37.49.2 SERVICE OFFERINGS
37.49.3 KEY NEWS
37.50 SIFY TECHNOLOGIES
37.50.1 BUSINESS OVERVIEW
37.50.2 SERVICE OFFERINGS
37.50.3 KEY NEWS
37.51 SKYBOX DATACENTERS
37.51.1 BUSINESS OVERVIEW
37.51.2 SERVICE OFFERINGS
37.51.3 KEY NEWS
37.52 STREAM DATA CENTERS
37.52.1 BUSINESS OVERVIEW
37.52.2 SERVICE OFFERINGS
37.52.3 KEY NEWS
37.53 SUNEVISION (IADVANTAGE)
37.53.1 BUSINESS OVERVIEW
37.53.2 SERVICE OFFERINGS
37.53.3 KEY NEWS
37.54 SWITCH
37.54.1 BUSINESS OVERVIEW
37.54.2 SERVICE OFFERINGS
37.55 T5 DATA CENTERS
37.55.1 BUSINESS OVERVIEW
37.55.2 SERVICE OFFERINGS
37.55.3 KEY NEWS
37.56 TENGLONG HOLDINGS GROUP
37.56.1 BUSINESS OVERVIEW
37.56.2 SERVICE OFFERINGS
37.57 TERACO (DIGITAL REALTY)
37.57.1 BUSINESS OVERVIEW
37.57.2 SERVICE OFFERINGS
37.58 TIERPOINT
37.58.1 BUSINESS OVERVIEW
37.58.2 SERVICE OFFERINGS
37.58.3 KEY NEWS
37.59 TURKCELL
37.59.1 BUSINESS OVERVIEW
37.59.2 SERVICE OFFERINGS
37.60 URBACON DATA CENTRE SOLUTIONS
37.60.1 BUSINESS OVERVIEW
37.60.2 SERVICE OFFERINGS
37.61 WINGU
37.61.1 BUSINESS OVERVIEW
37.61.2 SERVICE OFFERINGS
37.61.3 KEY NEWS
37.62 YONDR
37.62.1 BUSINESS OVERVIEW
37.62.2 SERVICE OFFERINGS
37.62.3 KEY NEWS
37.63 YOTTA INFRASTRUCTURE (HIRANANDANI GROUP)
37.63.1 BUSINESS OVERVIEW
37.63.2 SERVICE OFFERINGS
37.63.3 KEY NEWS
38 NEW ENTRANTS
38.1 ADANICONNEX
38.1.1 BUSINESS OVERVIEW
38.1.2 SERVICE OFFERINGS
38.2 AUBIX
38.2.1 BUSINESS OVERVIEW
38.2.2 SERVICE OFFERINGS
38.2.3 KEY NEWS
38.3 CLOUDOON
38.3.1 BUSINESS OVERVIEW
38.3.2 SERVICE OFFERINGS
38.4 CLUSTERPOWER
38.4.1 BUSINESS OVERVIEW
38.4.2 SERVICE OFFERINGS
38.4.3 KEY NEWS
38.5 CORSCALE DATA CENTERS
38.5.1 BUSINESS OVERVIEW
38.5.2 SERVICE OFFERINGS
38.6 DAMAC DATA CENTRES (EDGNEX)
38.6.1 BUSINESS OVERVIEW
38.6.2 SERVICE OFFERINGS
38.7 DATA CENTER FIRST
38.7.1 BUSINESS OVERVIEW
38.7.2 SERVICE OFFERINGS
38.7.3 KEY NEWS
38.8 DHAMERICAS
38.8.1 BUSINESS OVERVIEW
38.8.2 SERVICE OFFERINGS
38.9 EDGE CENTRES
38.9.1 BUSINESS OVERVIEW
38.9.2 SERVICE OFFERINGS
38.10 EVOLUTION DATA CENTRES
38.10.1 BUSINESS OVERVIEW
38.10.2 SERVICE OFFERINGS
38.11 GLOBAL TECHNICAL REALTY
38.11.1 BUSINESS OVERVIEW
38.11.2 SERVICE OFFERINGS
38.11.3 KEY NEWS
38.12 HICKORY
38.12.1 BUSINESS OVERVIEW
38.12.2 SERVICE OFFERINGS
38.13 IMCRITICAL
38.13.1 BUSINESS OVERVIEW
38.13.2 SERVICE OFFERINGS
38.13.3 KEY NEWS
38.14 INFINITY
38.14.1 BUSINESS OVERVIEW
38.14.2 SERVICE OFFERINGS
38.15 KASI CLOUD
38.15.1 BUSINESS OVERVIEW
38.15.2 SERVICE OFFERINGS
38.16 METTADC
38.16.1 BUSINESS OVERVIEW
38.16.2 SERVICE OFFERINGS
38.17 OPEN ACCESS DATA CENTRES
38.17.1 BUSINESS OVERVIEW
38.17.2 SERVICE OFFERINGS
38.17.3 KEY NEWS
38.18 POWERHOUSE DATA CENTERS
38.18.1 BUSINESS OVERVIEW
38.18.2 SERVICE OFFERINGS
38.19 PURE DATA CENTRES GROUP
38.19.1 BUSINESS OVERVIEW
38.19.2 SERVICE OFFERINGS
38.20 QUANTUM LOOPHOLE
38.20.1 BUSINESS OVERVIEW
38.20.2 SERVICE OFFERINGS
38.20.3 KEY NEWS
38.21 QUANTUM SWITCH TAMASUK (QST)
38.21.1 BUSINESS OVERVIEW
38.21.2 SERVICE OFFERINGS
38.22 STRATUS DC MANAGEMENT
38.22.1 BUSINESS OVERVIEW
38.22.2 SERVICE OFFERINGS
38.23 YCO CLOUD
38.23.1 BUSINESS OVERVIEW
38.23.2 SERVICE OFFERINGS
38.24 YTL DATA CENTER
38.24.1 BUSINESS OVERVIEW
38.24.2 SERVICE OFFERINGS
38.25 ZEROPOINT DC (NEOM)
38.25.1 BUSINESS OVERVIEW
38.25.2 SERVICE OFFERINGS

39 REPORT SUMMARY
39.1 KEY TAKEAWAYS

40 QUANTITATIVE SUMMARY
40.1 GLOBAL DATA CENTER CONSTRUCTION MARKET
40.1.1 GLOBAL DATA CENTER CONSTRUCTION MARKET
40.1.2 MARKET BY INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.3 MARKET BY ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.4 MARKET BY MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.5 MARKET BY COOLING SYSTEMS: MARKET SIZE & FORECAST
40.1.6 MARKET BY COOLING TECHNIQUES: MARKET SIZE & FORECAST
40.1.7 MARKET BY GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
40.1.8 MARKET BY TIER STANDARDS: MARKET SIZE & FORECAST
40.1.9 FACILITY TYPE: MARKET SIZE & FORECAST BY INVESTMENT
40.1.10 FACILITY TYPE: MARKET SIZE & FORECAST BY AREA
40.1.11 FACILITY TYPE: MARKET SIZE & FORECAST BY POWER CAPACITY
40.2 GEOGRAPHY
40.2.1 DATA CENTER INVESTMENT BY REGION
40.2.2 DATA CENTER AREA BY REGION
40.2.3 DATA CENTER POWER CAPACITY BY REGION
40.3 NORTH AMERICA
40.3.1 MARKET SIZE & FORECAST
40.3.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.4 US
40.4.1 MARKET SIZE & FORECAST
40.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.5 CANADA
40.5.1 MARKET SIZE & FORECAST
40.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.6 LATIN AMERICA
40.6.1 MARKET SIZE & FORECAST
40.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.7 BRAZIL
40.7.1 MARKET SIZE & FORECAST
40.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.8 MEXICO
40.8.1 MARKET SIZE & FORECAST
40.8.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.9 CHILE
40.9.1 MARKET SIZE & FORECAST
40.9.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.10 COLOMBIA
40.10.1 MARKET SIZE & FORECAST
40.10.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.11 OTHER LATIN AMERICAN COUNTRIES
40.11.1 MARKET SIZE & FORECAST
40.11.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.12 WESTERN EUROPE
40.12.1 MARKET SIZE & FORECAST
40.12.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.13 UK
40.13.1 MARKET SIZE & FORECAST
40.13.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.14 GERMANY
40.14.1 MARKET SIZE & FORECAST
40.14.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.15 FRANCE
40.15.1 MARKET SIZE & FORECAST
40.15.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.16 NETHERLANDS
40.16.1 MARKET SIZE & FORECAST
40.16.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.17 IRELAND
40.17.1 MARKET SIZE & FORECAST
40.17.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.18 SWITZERLAND
40.18.1 MARKET SIZE & FORECAST
40.18.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.19 ITALY
40.19.1 MARKET SIZE & FORECAST
40.19.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.20 SPAIN
40.20.1 MARKET SIZE & FORECAST
40.20.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.21 BELGIUM
40.21.1 MARKET SIZE & FORECAST
40.21.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.22 PORTUGAL
40.22.1 MARKET SIZE & FORECAST
40.22.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.23 OTHER WESTERN EUROPEAN COUNTRIES
40.23.1 MARKET SIZE & FORECAST
40.23.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.24 NORDICS
40.24.1 MARKET SIZE & FORECAST
40.24.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.25 SWEDEN
40.25.1 MARKET SIZE & FORECAST
40.25.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.26 DENMARK
40.26.1 MARKET SIZE & FORECAST
40.26.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.27 NORWAY
40.27.1 MARKET SIZE & FORECAST
40.27.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.28 FINLAND & ICELAND
40.28.1 MARKET SIZE & FORECAST
40.28.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.29 CENTRAL & EASTERN EUROPE
40.29.1 MARKET SIZE & FORECAST
40.29.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.30 RUSSIA
40.30.1 MARKET SIZE & FORECAST
40.30.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.31 POLAND
40.31.1 MARKET SIZE & FORECAST
40.31.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.32 AUSTRIA
40.32.1 MARKET SIZE & FORECAST
40.32.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.33 CZECH REPUBLIC
40.33.1 MARKET SIZE & FORECAST
40.33.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.34 OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
40.34.1 MARKET SIZE & FORECAST
40.34.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.35 MIDDLE EAST
40.35.1 MARKET SIZE & FORECAST
40.35.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.36 UAE
40.36.1 MARKET SIZE & FORECAST
40.36.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.37 SAUDI ARABIA
40.37.1 MARKET SIZE & FORECAST
40.37.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.38 ISRAEL
40.38.1 MARKET SIZE & FORECAST
40.38.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.39 OMAN
40.39.1 MARKET SIZE & FORECAST
40.39.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.40 QATAR
40.40.1 MARKET SIZE & FORECAST
40.40.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.41 KUWAIT
40.41.1 MARKET SIZE & FORECAST
40.41.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.42 JORDAN
40.42.1 MARKET SIZE & FORECAST
40.42.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.43 BAHRAIN
40.43.1 MARKET SIZE & FORECAST
40.43.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.44 OTHER MIDDLE EASTERN COUNTRIES
40.44.1 MARKET SIZE & FORECAST
40.44.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.45 AFRICA
40.45.1 MARKET SIZE & FORECAST
40.45.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.46 SOUTH AFRICA
40.46.1 MARKET SIZE & FORECAST
40.46.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.47 KENYA
40.47.1 MARKET SIZE & FORECAST
40.47.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.48 NIGERIA
40.48.1 MARKET SIZE & FORECAST
40.48.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.49 EGYPT
40.49.1 MARKET SIZE & FORECAST
40.49.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.50 ETHIOPIA
40.50.1 MARKET SIZE & FORECAST
40.50.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.51 OTHER AFRICAN COUNTRIES
40.51.1 MARKET SIZE & FORECAST
40.51.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.52 APAC
40.52.1 MARKET SIZE & FORECAST
40.52.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.53 CHINA
40.53.1 MARKET SIZE & FORECAST
40.53.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.54 HONG KONG
40.54.1 MARKET SIZE & FORECAST
40.54.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.55 AUSTRALIA
40.55.1 MARKET SIZE & FORECAST
40.55.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.56 NEW ZEALAND
40.56.1 MARKET SIZE & FORECAST
40.56.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.57 INDIA
40.57.1 MARKET SIZE & FORECAST
40.57.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.58 JAPAN
40.58.1 MARKET SIZE & FORECAST
40.58.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.59 TAIWAN
40.59.1 MARKET SIZE & FORECAST
40.59.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.60 SOUTH KOREA
40.60.1 MARKET SIZE & FORECAST
40.60.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.61 REST OF APAC
40.61.1 MARKET SIZE & FORECAST
40.61.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.62 SOUTHEAST ASIA
40.62.1 MARKET SIZE & FORECAST
40.62.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.63 SINGAPORE
40.63.1 MARKET SIZE & FORECAST
40.63.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.64 INDONESIA
40.64.1 MARKET SIZE & FORECAST
40.64.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.65 MALAYSIA
40.65.1 MARKET SIZE & FORECAST
40.65.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.66 THAILAND
40.66.1 MARKET SIZE & FORECAST
40.66.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.67 PHILIPPINES
40.67.1 MARKET SIZE & FORECAST
40.67.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.68 VIETNAM
40.68.1 MARKET SIZE & FORECAST
40.68.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.69 OTHER SOUTHEAST ASIAN COUNTRIES
40.69.1 MARKET SIZE & FORECAST
40.69.2 INFRASTRUCTURE: MARKET SIZE & FORECAST

41 APPENDIX
41.1 ABBREVIATIONS

36 KEY DATA CENTER OPERATORS
36.1 21 VIANET GROUP (VNET)
36.1.1 BUSINESS OVERVIEW
36.1.2 SERVICE OFFERINGS
36.2 AMAZON WEB SERVICES
36.2.1 BUSINESS OVERVIEW
36.2.2 SERVICE OFFERINGS
36.2.3 KEY NEWS
36.3 APPLE
36.3.1 BUSINESS OVERVIEW
36.3.2 SERVICE OFFERINGS
36.3.3 KEY NEWS
36.4 CHINA TELECOM
36.4.1 BUSINESS OVERVIEW
36.4.2 SERVICE OFFERINGS
36.5 COLT DATA CENTRE SERVICES (COLT DCS)
36.5.1 BUSINESS OVERVIEW
36.5.2 SERVICE OFFERINGS
36.5.3 KEY NEWS
36.6 COMPASS DATACENTERS
36.6.1 BUSINESS OVERVIEW
36.6.2 SERVICE OFFERINGS
36.6.3 KEY NEWS
36.7 CYRUSONE
36.7.1 BUSINESS OVERVIEW
36.7.2 SERVICE OFFERINGS
36.7.3 KEY NEWS
36.8 DIGITAL REALTY
36.8.1 BUSINESS OVERVIEW
36.8.2 SERVICE OFFERINGS
36.8.3 KEY NEWS
36.9 EDGECONNEX (EQT INFRASTRUCTURE)
36.9.1 BUSINESS OVERVIEW
36.9.2 SERVICE OFFERINGS
36.9.3 KEY NEWS
36.10 EQUINIX
36.10.1 BUSINESS OVERVIEW
36.10.2 SERVICE OFFERINGS
36.10.3 KEY NEWS
36.11 GDS SERVICES
36.11.1 BUSINESS OVERVIEW
36.11.2 SERVICE OFFERINGS
36.11.3 KEY NEWS
36.12 GLOBAL SWITCH
36.12.1 BUSINESS OVERVIEW
36.12.2 SERVICE OFFERINGS
36.13 GOOGLE
36.13.1 BUSINESS OVERVIEW
36.13.2 SERVICE OFFERINGS
36.13.3 KEY NEWS
36.14 IRON MOUNTAIN
36.14.1 BUSINESS OVERVIEW
36.14.2 SERVICE OFFERINGS
36.14.3 KEY NEWS
36.15 META (FACEBOOK)
36.15.1 BUSINESS OVERVIEW
36.15.2 SERVICE OFFERINGS
36.15.3 KEY NEWS
36.16 MICROSOFT
36.16.1 BUSINESS OVERVIEW
36.16.2 SERVICE OFFERINGS
36.16.3 KEY NEWS
36.17 NTT GLOBAL DATA CENTERS
36.17.1 BUSINESS OVERVIEW
36.17.2 SERVICE OFFERINGS
36.17.3 KEY NEWS
36.18 QTS REALTY TRUST
36.18.1 BUSINESS OVERVIEW
36.18.2 SERVICE OFFERINGS
36.18.3 KEY NEWS
36.19 STACK INFRASTRUCTURE
36.19.1 BUSINESS OVERVIEW
36.19.2 SERVICE OFFERINGS
36.19.3 KEY NEWS
36.20 ST TELEMEDIA GLOBAL DATA CENTRES
36.20.1 BUSINESS OVERVIEW
36.20.2 SERVICE OFFERINGS
36.20.3 KEY NEWS
36.21 VANTAGE DATA CENTERS
36.21.1 BUSINESS OVERVIEW
36.21.2 SERVICE OFFERINGS
36.21.3 KEY NEWS

37 OTHER DATA CENTER OPERATORS
37.1 3DATA
37.1.1 BUSINESS OVERVIEW
37.1.2 SERVICE OFFERINGS
37.1.3 KEY NEWS
37.2 AFRICA DATA CENTRES
37.2.1 BUSINESS OVERVIEW
37.2.2 SERVICE OFFERINGS
37.2.3 KEY NEWS
37.3 AIRTRUNK
37.3.1 BUSINESS OVERVIEW
37.3.2 SERVICE OFFERINGS
37.3.3 KEY NEWS
37.4 ALIGNED
37.4.1 BUSINESS OVERVIEW
37.4.2 SERVICE OFFERINGS
37.4.3 KEY NEWS
37.5 AMERICAN TOWER
37.5.1 BUSINESS OVERVIEW
37.5.2 SERVICE OFFERINGS
37.5.3 KEY NEWS
37.6 AQ COMPUTE
37.6.1 BUSINESS OVERVIEW
37.6.2 SERVICE OFFERINGS
37.6.3 KEY NEWS
37.7 ARUBA
37.7.1 BUSINESS OVERVIEW
37.7.2 SERVICE OFFERINGS
37.7.3 KEY NEWS
37.8 ATLASEDGE
37.8.1 BUSINESS OVERVIEW
37.8.2 SERVICE OFFERINGS
37.8.3 KEY NEWS
37.9 ATNORTH
37.9.1 BUSINESS OVERVIEW
37.9.2 SERVICE OFFERINGS
37.9.3 KEY NEWS
37.10 AT TOKYO
37.10.1 BUSINESS OVERVIEW
37.10.2 SERVICE OFFERINGS
37.10.3 KEY NEWS
37.11 BDX (BIG DATA EXCHANGE)
37.11.1 BUSINESS OVERVIEW
37.11.2 SERVICE OFFERINGS
37.11.3 KEY NEWS
37.12 BULK INFRASTRUCTURE
37.12.1 BUSINESS OVERVIEW
37.12.2 SERVICE OFFERINGS
37.12.3 KEY NEWS
37.13 BRIDGE DATA CENTRES
37.13.1 BUSINESS OVERVIEW
37.13.2 SERVICE OFFERINGS
37.13.3 KEY NEWS
37.14 CDC DATA CENTRES
37.14.1 BUSINESS OVERVIEW
37.14.2 SERVICE OFFERINGS
37.14.3 KEY NEWS
37.15 CHAYORA
37.15.1 BUSINESS OVERVIEW
37.15.2 SERVICE OFFERINGS
37.16 CHINA MOBILE
37.16.1 BUSINESS OVERVIEW
37.16.2 SERVICE OFFERINGS
37.17 CHINDATA
37.17.1 BUSINESS OVERVIEW
37.17.2 SERVICE OFFERINGS
37.18 CLOUDHQ
37.18.1 BUSINESS OVERVIEW
37.18.2 SERVICE OFFERINGS
37.18.3 KEY NEWS
37.19 COLOGIX
37.19.1 BUSINESS OVERVIEW
37.19.2 SERVICE OFFERINGS
37.19.3 KEY NEWS
37.20 COPT DATA CENTER SOLUTIONS
37.20.1 BUSINESS OVERVIEW
37.20.2 SERVICE OFFERINGS
37.20.3 KEY NEWS
37.21 CTRLS DATACENTERS
37.21.1 BUSINESS OVERVIEW
37.21.2 SERVICE OFFERINGS
37.21.3 KEY NEWS
37.22 CYXTERA TECHNOLOGIES
37.22.1 BUSINESS OVERVIEW
37.22.2 SERVICE OFFERINGS
37.22.3 KEY NEWS
37.23 DATA4
37.23.1 BUSINESS OVERVIEW
37.23.2 SERVICE OFFERINGS
37.23.3 KEY NEWS
37.24 DATABANK
37.24.1 BUSINESS OVERVIEW
37.24.2 SERVICE OFFERINGS
37.24.3 KEY NEWS
37.25 DC BLOX
37.25.1 BUSINESS OVERVIEW
37.25.2 SERVICE OFFERINGS
37.25.3 KEY NEWS
37.26 ELEMENT CRITICAL
37.26.1 BUSINESS OVERVIEW
37.26.2 SERVICE OFFERINGS
37.26.3 KEY NEWS
37.27 EPLDT
37.27.1 BUSINESS OVERVIEW
37.27.2 SERVICE OFFERINGS
37.27.3 KEY NEWS
37.28 ESTRUXTURE DATA CENTERS
37.28.1 BUSINESS OVERVIEW
37.28.2 SERVICE OFFERINGS
37.29 FIFTEENFORTYSEVEN CRITICAL SYSTEMS REALTY (1547)
37.29.1 BUSINESS OVERVIEW
37.29.2 SERVICE OFFERINGS
37.29.3 KEY NEWS
37.30 FLEXENTIAL
37.30.1 BUSINESS OVERVIEW
37.30.2 SERVICE OFFERINGS
37.30.3 KEY NEWS
37.31 GREEN MOUNTAIN
37.31.1 BUSINESS OVERVIEW
37.31.2 SERVICE OFFERINGS
37.31.3 KEY NEWS
37.32 H5 DATA CENTERS
37.32.1 BUSINESS OVERVIEW
37.32.2 SERVICE OFFERINGS
37.32.3 KEY NEWS
37.33 HOSTDIME
37.33.1 BUSINESS OVERVIEW
37.33.2 SERVICE OFFERINGS
37.33.3 KEY NEWS
37.34 KDDI (TELEHOUSE)
37.34.1 BUSINESS OVERVIEW
37.34.2 SERVICE OFFERINGS
37.34.3 KEY NEWS
37.35 KEPPEL DATA CENTRES
37.35.1 BUSINESS OVERVIEW
37.35.2 SERVICE OFFERINGS
37.35.3 KEY NEWS
37.36 LG UPLUS
37.36.1 BUSINESS OVERVIEW
37.36.2 SERVICE OFFERINGS
37.37 MAINCUBES ONE
37.37.1 BUSINESS OVERVIEW
37.37.2 SERVICE OFFERINGS
37.37.3 KEY NEWS
37.38 MAINONE (EQUINIX)
37.38.1 BUSINESS OVERVIEW
37.38.2 SERVICE OFFERINGS
37.38.3 KEY NEWS
37.39 MILLICOM (TIGO)
37.39.1 BUSINESS OVERVIEW
37.39.2 SERVICE OFFERINGS
37.40 NEXTDC
37.40.1 BUSINESS OVERVIEW
37.40.2 SERVICE OFFERINGS
37.40.3 KEY NEWS
37.41 ODATA
37.41.1 BUSINESS OVERVIEW
37.41.2 SERVICE OFFERINGS
37.41.3 KEY NEWS
37.42 ORANGE BUSINESS SERVICES
37.42.1 BUSINESS OVERVIEW
37.42.2 SERVICE OFFERINGS
37.42.3 KEY NEWS
37.43 PRIME DATA CENTERS
37.43.1 BUSINESS OVERVIEW
37.43.2 SERVICE OFFERINGS
37.43.3 KEY NEWS
37.44 PRINCETON DIGITAL GROUP (PDG)
37.44.1 BUSINESS OVERVIEW
37.44.2 SERVICE OFFERINGS
37.44.3 KEY NEWS
37.45 PROXIMITY DATA CENTRES
37.45.1 BUSINESS OVERVIEW
37.45.2 SERVICE OFFERINGS
37.45.3 KEY NEWS
37.46 RAXIO GROUP
37.46.1 BUSINESS OVERVIEW
37.46.2 SERVICE OFFERINGS
37.46.3 KEY NEWS
37.47 ROSTELECOM DATA CENTERS
37.47.1 BUSINESS OVERVIEW
37.47.2 SERVICE OFFERINGS
37.47.3 KEY NEWS
37.48 SABEY DATA CENTERS
37.48.1 BUSINESS OVERVIEW
37.48.2 SERVICE OFFERINGS
37.48.3 KEY NEWS
37.49 SCALA DATA CENTERS
37.49.1 BUSINESS OVERVIEW
37.49.2 SERVICE OFFERINGS
37.49.3 KEY NEWS
37.50 SIFY TECHNOLOGIES
37.50.1 BUSINESS OVERVIEW
37.50.2 SERVICE OFFERINGS
37.50.3 KEY NEWS
37.51 SKYBOX DATACENTERS
37.51.1 BUSINESS OVERVIEW
37.51.2 SERVICE OFFERINGS
37.51.3 KEY NEWS
37.52 STREAM DATA CENTERS
37.52.1 BUSINESS OVERVIEW
37.52.2 SERVICE OFFERINGS
37.52.3 KEY NEWS
37.53 SUNEVISION (IADVANTAGE)
37.53.1 BUSINESS OVERVIEW
37.53.2 SERVICE OFFERINGS
37.53.3 KEY NEWS
37.54 SWITCH
37.54.1 BUSINESS OVERVIEW
37.54.2 SERVICE OFFERINGS
37.55 T5 DATA CENTERS
37.55.1 BUSINESS OVERVIEW
37.55.2 SERVICE OFFERINGS
37.55.3 KEY NEWS
37.56 TENGLONG HOLDINGS GROUP
37.56.1 BUSINESS OVERVIEW
37.56.2 SERVICE OFFERINGS
37.57 TERACO (DIGITAL REALTY)
37.57.1 BUSINESS OVERVIEW
37.57.2 SERVICE OFFERINGS
37.58 TIERPOINT
37.58.1 BUSINESS OVERVIEW
37.58.2 SERVICE OFFERINGS
37.58.3 KEY NEWS
37.59 TURKCELL
37.59.1 BUSINESS OVERVIEW
37.59.2 SERVICE OFFERINGS
37.60 URBACON DATA CENTRE SOLUTIONS
37.60.1 BUSINESS OVERVIEW
37.60.2 SERVICE OFFERINGS
37.61 WINGU
37.61.1 BUSINESS OVERVIEW
37.61.2 SERVICE OFFERINGS
37.61.3 KEY NEWS
37.62 YONDR
37.62.1 BUSINESS OVERVIEW
37.62.2 SERVICE OFFERINGS
37.62.3 KEY NEWS
37.63 YOTTA INFRASTRUCTURE (HIRANANDANI GROUP)
37.63.1 BUSINESS OVERVIEW
37.63.2 SERVICE OFFERINGS
37.63.3 KEY NEWS
38 NEW ENTRANTS
38.1 ADANICONNEX
38.1.1 BUSINESS OVERVIEW
38.1.2 SERVICE OFFERINGS
38.2 AUBIX
38.2.1 BUSINESS OVERVIEW
38.2.2 SERVICE OFFERINGS
38.2.3 KEY NEWS
38.3 CLOUDOON
38.3.1 BUSINESS OVERVIEW
38.3.2 SERVICE OFFERINGS
38.4 CLUSTERPOWER
38.4.1 BUSINESS OVERVIEW
38.4.2 SERVICE OFFERINGS
38.4.3 KEY NEWS
38.5 CORSCALE DATA CENTERS
38.5.1 BUSINESS OVERVIEW
38.5.2 SERVICE OFFERINGS
38.6 DAMAC DATA CENTRES (EDGNEX)
38.6.1 BUSINESS OVERVIEW
38.6.2 SERVICE OFFERINGS
38.7 DATA CENTER FIRST
38.7.1 BUSINESS OVERVIEW
38.7.2 SERVICE OFFERINGS
38.7.3 KEY NEWS
38.8 DHAMERICAS
38.8.1 BUSINESS OVERVIEW
38.8.2 SERVICE OFFERINGS
38.9 EDGE CENTRES
38.9.1 BUSINESS OVERVIEW
38.9.2 SERVICE OFFERINGS
38.10 EVOLUTION DATA CENTRES
38.10.1 BUSINESS OVERVIEW
38.10.2 SERVICE OFFERINGS
38.11 GLOBAL TECHNICAL REALTY
38.11.1 BUSINESS OVERVIEW
38.11.2 SERVICE OFFERINGS
38.11.3 KEY NEWS
38.12 HICKORY
38.12.1 BUSINESS OVERVIEW
38.12.2 SERVICE OFFERINGS
38.13 IMCRITICAL
38.13.1 BUSINESS OVERVIEW
38.13.2 SERVICE OFFERINGS
38.13.3 KEY NEWS
38.14 INFINITY
38.14.1 BUSINESS OVERVIEW
38.14.2 SERVICE OFFERINGS
38.15 KASI CLOUD
38.15.1 BUSINESS OVERVIEW
38.15.2 SERVICE OFFERINGS
38.16 METTADC
38.16.1 BUSINESS OVERVIEW
38.16.2 SERVICE OFFERINGS
38.17 OPEN ACCESS DATA CENTRES
38.17.1 BUSINESS OVERVIEW
38.17.2 SERVICE OFFERINGS
38.17.3 KEY NEWS
38.18 POWERHOUSE DATA CENTERS
38.18.1 BUSINESS OVERVIEW
38.18.2 SERVICE OFFERINGS
38.19 PURE DATA CENTRES GROUP
38.19.1 BUSINESS OVERVIEW
38.19.2 SERVICE OFFERINGS
38.20 QUANTUM LOOPHOLE
38.20.1 BUSINESS OVERVIEW
38.20.2 SERVICE OFFERINGS
38.20.3 KEY NEWS
38.21 QUANTUM SWITCH TAMASUK (QST)
38.21.1 BUSINESS OVERVIEW
38.21.2 SERVICE OFFERINGS
38.22 STRATUS DC MANAGEMENT
38.22.1 BUSINESS OVERVIEW
38.22.2 SERVICE OFFERINGS
38.23 YCO CLOUD
38.23.1 BUSINESS OVERVIEW
38.23.2 SERVICE OFFERINGS
38.24 YTL DATA CENTER
38.24.1 BUSINESS OVERVIEW
38.24.2 SERVICE OFFERINGS
38.25 ZEROPOINT DC (NEOM)
38.25.1 BUSINESS OVERVIEW
38.25.2 SERVICE OFFERINGS

39 REPORT SUMMARY
39.1 KEY TAKEAWAYS

40 QUANTITATIVE SUMMARY
40.1 GLOBAL DATA CENTER CONSTRUCTION MARKET
40.1.1 GLOBAL DATA CENTER CONSTRUCTION MARKET
40.1.2 MARKET BY INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.3 MARKET BY ELECTRICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.4 MARKET BY MECHANICAL INFRASTRUCTURE: MARKET SIZE & FORECAST
40.1.5 MARKET BY COOLING SYSTEMS: MARKET SIZE & FORECAST
40.1.6 MARKET BY COOLING TECHNIQUES: MARKET SIZE & FORECAST
40.1.7 MARKET BY GENERAL CONSTRUCTION: MARKET SIZE & FORECAST
40.1.8 MARKET BY TIER STANDARDS: MARKET SIZE & FORECAST
40.1.9 FACILITY TYPE: MARKET SIZE & FORECAST BY INVESTMENT
40.1.10 FACILITY TYPE: MARKET SIZE & FORECAST BY AREA
40.1.11 FACILITY TYPE: MARKET SIZE & FORECAST BY POWER CAPACITY
40.2 GEOGRAPHY
40.2.1 DATA CENTER INVESTMENT BY REGION
40.2.2 DATA CENTER AREA BY REGION
40.2.3 DATA CENTER POWER CAPACITY BY REGION
40.3 NORTH AMERICA
40.3.1 MARKET SIZE & FORECAST
40.3.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.4 US
40.4.1 MARKET SIZE & FORECAST
40.4.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.5 CANADA
40.5.1 MARKET SIZE & FORECAST
40.5.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.6 LATIN AMERICA
40.6.1 MARKET SIZE & FORECAST
40.6.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.7 BRAZIL
40.7.1 MARKET SIZE & FORECAST
40.7.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.8 MEXICO
40.8.1 MARKET SIZE & FORECAST
40.8.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.9 CHILE
40.9.1 MARKET SIZE & FORECAST
40.9.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.10 COLOMBIA
40.10.1 MARKET SIZE & FORECAST
40.10.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.11 OTHER LATIN AMERICAN COUNTRIES
40.11.1 MARKET SIZE & FORECAST
40.11.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.12 WESTERN EUROPE
40.12.1 MARKET SIZE & FORECAST
40.12.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.13 UK
40.13.1 MARKET SIZE & FORECAST
40.13.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.14 GERMANY
40.14.1 MARKET SIZE & FORECAST
40.14.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.15 FRANCE
40.15.1 MARKET SIZE & FORECAST
40.15.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.16 NETHERLANDS
40.16.1 MARKET SIZE & FORECAST
40.16.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.17 IRELAND
40.17.1 MARKET SIZE & FORECAST
40.17.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.18 SWITZERLAND
40.18.1 MARKET SIZE & FORECAST
40.18.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.19 ITALY
40.19.1 MARKET SIZE & FORECAST
40.19.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.20 SPAIN
40.20.1 MARKET SIZE & FORECAST
40.20.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.21 BELGIUM
40.21.1 MARKET SIZE & FORECAST
40.21.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.22 PORTUGAL
40.22.1 MARKET SIZE & FORECAST
40.22.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.23 OTHER WESTERN EUROPEAN COUNTRIES
40.23.1 MARKET SIZE & FORECAST
40.23.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.24 NORDICS
40.24.1 MARKET SIZE & FORECAST
40.24.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.25 SWEDEN
40.25.1 MARKET SIZE & FORECAST
40.25.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.26 DENMARK
40.26.1 MARKET SIZE & FORECAST
40.26.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.27 NORWAY
40.27.1 MARKET SIZE & FORECAST
40.27.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.28 FINLAND & ICELAND
40.28.1 MARKET SIZE & FORECAST
40.28.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.29 CENTRAL & EASTERN EUROPE
40.29.1 MARKET SIZE & FORECAST
40.29.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.30 RUSSIA
40.30.1 MARKET SIZE & FORECAST
40.30.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.31 POLAND
40.31.1 MARKET SIZE & FORECAST
40.31.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.32 AUSTRIA
40.32.1 MARKET SIZE & FORECAST
40.32.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.33 CZECH REPUBLIC
40.33.1 MARKET SIZE & FORECAST
40.33.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.34 OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
40.34.1 MARKET SIZE & FORECAST
40.34.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.35 MIDDLE EAST
40.35.1 MARKET SIZE & FORECAST
40.35.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.36 UAE
40.36.1 MARKET SIZE & FORECAST
40.36.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.37 SAUDI ARABIA
40.37.1 MARKET SIZE & FORECAST
40.37.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.38 ISRAEL
40.38.1 MARKET SIZE & FORECAST
40.38.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.39 OMAN
40.39.1 MARKET SIZE & FORECAST
40.39.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.40 QATAR
40.40.1 MARKET SIZE & FORECAST
40.40.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.41 KUWAIT
40.41.1 MARKET SIZE & FORECAST
40.41.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.42 JORDAN
40.42.1 MARKET SIZE & FORECAST
40.42.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.43 BAHRAIN
40.43.1 MARKET SIZE & FORECAST
40.43.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.44 OTHER MIDDLE EASTERN COUNTRIES
40.44.1 MARKET SIZE & FORECAST
40.44.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.45 AFRICA
40.45.1 MARKET SIZE & FORECAST
40.45.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.46 SOUTH AFRICA
40.46.1 MARKET SIZE & FORECAST
40.46.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.47 KENYA
40.47.1 MARKET SIZE & FORECAST
40.47.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.48 NIGERIA
40.48.1 MARKET SIZE & FORECAST
40.48.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.49 EGYPT
40.49.1 MARKET SIZE & FORECAST
40.49.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.50 ETHIOPIA
40.50.1 MARKET SIZE & FORECAST
40.50.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.51 OTHER AFRICAN COUNTRIES
40.51.1 MARKET SIZE & FORECAST
40.51.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.52 APAC
40.52.1 MARKET SIZE & FORECAST
40.52.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.53 CHINA
40.53.1 MARKET SIZE & FORECAST
40.53.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.54 HONG KONG
40.54.1 MARKET SIZE & FORECAST
40.54.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.55 AUSTRALIA
40.55.1 MARKET SIZE & FORECAST
40.55.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.56 NEW ZEALAND
40.56.1 MARKET SIZE & FORECAST
40.56.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.57 INDIA
40.57.1 MARKET SIZE & FORECAST
40.57.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.58 JAPAN
40.58.1 MARKET SIZE & FORECAST
40.58.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.59 TAIWAN
40.59.1 MARKET SIZE & FORECAST
40.59.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.60 SOUTH KOREA
40.60.1 MARKET SIZE & FORECAST
40.60.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.61 REST OF APAC
40.61.1 MARKET SIZE & FORECAST
40.61.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.62 SOUTHEAST ASIA
40.62.1 MARKET SIZE & FORECAST
40.62.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.63 SINGAPORE
40.63.1 MARKET SIZE & FORECAST
40.63.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.64 INDONESIA
40.64.1 MARKET SIZE & FORECAST
40.64.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.65 MALAYSIA
40.65.1 MARKET SIZE & FORECAST
40.65.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.66 THAILAND
40.66.1 MARKET SIZE & FORECAST
40.66.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.67 PHILIPPINES
40.67.1 MARKET SIZE & FORECAST
40.67.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.68 VIETNAM
40.68.1 MARKET SIZE & FORECAST
40.68.2 INFRASTRUCTURE: MARKET SIZE & FORECAST
40.69 OTHER SOUTHEAST ASIAN COUNTRIES
40.69.1 MARKET SIZE & FORECAST
40.69.2 INFRASTRUCTURE: MARKET SIZE & FORECAST

41 APPENDIX
41.1 ABBREVIATIONS

  • Not Sure / Need Reassuring
    • Confirm Content
      • Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:

        Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.

        Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.

        Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.

    • Sample Pages
      • With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.

        It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.

        To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Check for Alternatives
      • Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.

        To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.

  • Prices / Formats / Delivery
    • Prices
      • All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.

        Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Discounts
      • As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.

        Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.

        To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.

    • Available Currencies
      • Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.

        Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.

        To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.

    • Licenses
      • License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Global Site License
      • The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.

        It is important to note that this may exclude Parent Companies or Subsidiaries.

        If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.

    • Formats
      • The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.

        If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.

    • Delivery
      • Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.

        Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.

        If a delay in delivery is expected you will be informed about it immediately.

    • Shipping Charges
      • As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.

        If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.

  • Ordering
    • By Credit Card
      • We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.

        Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.

        For more information on PayU please visit: https://www.payu.pl/en/about-us

    • By Money Transfer
      • If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.

        With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.

  • Security
    • Website security
      • We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.

        Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.

    • Credit Card Security
      • We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.

        PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.

PLEASE SELECT LICENSE