Data Center Construction Market - By Data Center Type (Small, Medium, Large), By Infrastructure (Electrical, Mechanical, Networking), By End use (BFSI, Energy, Government, Healthcare, IT & Telecommunication, Manufacturing), Forecast 2024 - 2032
Market Report I 2024-04-25 I 275 Pages I Global Market Insights
Global Data Center Construction Market will exhibit over 6% CAGR between 2024 and 2032, bolstered by spurring data traffic. The exponential growth of internet traffic fueled by online activities, streaming services, and social media platforms is significantly expanding the demand for larger and more efficient data centers. As reported by ITU data, global internet traffic has surged, growing at an annual rate of 22%, soaring from 2401 Exabytes in 2019 to 5291 Exabytes in 2022.
As users consume more digital content and engage in real-time interactions, the strain on existing infrastructure necessitates robust data centers capable of handling massive data volumes swiftly and securely. This trend is prompting investments in scalable data center solutions to accommodate current demands and prepare for future growth, ensuring uninterrupted connectivity and reliable service delivery across global networks.
The overall data center construction industry is grouped based on data center type, infrastructure, end-use, and region.
By 2032, the small data center segment will acquire a prominent data center construction market share. The small data center segment is driven by the increasing adoption of digital technologies among small businesses and startups. As these enterprises expand their digital footprints, they require reliable and secure data storage solutions that can accommodate their growing volumes of data. Small data centers offer scalability and flexibility tailored to the specific needs of smaller organizations, providing essential infrastructure for cloud computing, data analytics, and online operations. This trend reflects a growing recognition of the importance of data management and IT infrastructure in driving business growth and competitiveness within the digital economy.
From 2024 to 2032, the mechanical infrastructure segment will record an impressive CAGR in the data center construction market. The mechanical infrastructure segment is rising due to advancements in technology and the need for energy-efficient and sustainable solutions. Modern data centers require sophisticated cooling systems, power distribution units, and backup generators to ensure optimal performance and reliability. Additionally, there is a growing emphasis on reducing environmental impact using innovative cooling technologies and renewable energy sources. This sectors growth is driven by the critical role of mechanical infrastructure in maintaining data center uptime, efficiency, and compliance with evolving regulatory standards.
Asia Pacific data center construction market size will infer a remarkable CAGR during 2024-2032. The data center construction demand in Asia Pacific is escalating due to rapid digital transformation and the surge in internet usage across emerging economies. Countries like India, China, and Southeast Asian nations are experiencing robust growth in cloud computing, e-commerce, and digital services, driving the need for scalable and reliable data infrastructure. Additionally, increasing investments from global tech giants and local enterprises are bolstering the construction of data centers to meet data sovereignty requirements and ensure low-latency connectivity for users. This growth reflects Asia Pacifics pivotal role in the global digital economy.
Report Content
Chapter 1 Methodology & Scope
1.1 Research design
1.1.1 Research approach
1.1.2 Data collection methods
1.2 Base estimates and calculations
1.2.1 Base year calculation
1.2.2 Key trends for market estimates
1.3 Forecast model
1.4 Primary research & validation
1.4.1 Primary sources
1.4.2 Data mining sources
1.5 Market definitions
Chapter 2 Executive Summary
2.1 Industry 360-degree synopsis, 2021 - 2032
Chapter 3 Industry Insights
3.1 Industry ecosystem analysis
3.2 Supplier landscape
3.2.1 Equipment suppliers
3.2.2 Data center developers
3.2.3 Construction contractors
3.2.4 End users
3.3 Profit margin analysis
3.4 Technology & innovation landscape
3.5 Patent analysis
3.6 Key news & initiatives
3.7 Regulatory landscape
3.8 Impact forces
3.8.1 Growth drivers
3.8.1.1 Rapid infrastructure development of various application segments in Europe
3.8.1.2 Increasing adoption of cloud computing and IoT in Asia Pacific
3.8.1.3 Technological advancement in cloud-based solutions
3.8.1.4 Increasing number of new data centers in South America
3.8.1.5 Rapid urbanization and proliferation of smart consumer electronics devices
3.8.2 Industry pitfalls & challenges
3.8.2.1 Fluctuations in the semiconductor industry
3.8.2.2 High investments and installation costs
3.9 Growth potential analysis
3.10 Porter's analysis
3.11 PESTEL analysis
Chapter 4 Competitive Landscape, 2023
4.1 Introduction
4.2 Company market share analysis
4.3 Competitive positioning matrix
4.4 Strategic outlook matrix
Chapter 5 Market Estimates & Forecast, By Data Center Type, 2021 - 2032 ($Bn)
5.1 Key trends
5.2 Small data center
5.3 Medium data center
5.4 Large data center
Chapter 6 Market Estimates & Forecast, By Infrastructure, 2021 - 2032 ($Bn)
6.1 Key trends
6.2 Electrical infrastructure
6.2.1 UPS
6.2.2 Power Distribution Units (PDUs)
6.2.3 Backup generators
6.2.4 Others
6.3 Mechanical infrastructure
6.3.1 Cooling Systems
6.3.2 HVAC
6.3.2.1 Computer room air conditioning (CRAC) units
6.3.2.1.1 Fan arrays
6.3.2.1.2 Air Flow measurement damper
6.3.2.1.3 DOAS
6.3.2.2 Precision Air Conditioning (PAC) units
6.3.2.2.1 Face mounted plenum fan with EC motor
6.3.2.2.2 MAU
6.3.2.2.3 ERV
6.3.2.3 Chilled water systems
6.3.2.3.1 Dampers
6.3.2.3.2 Condenser Fans
6.3.2.4 Ventilation systems
6.3.2.5 Direct expansion (DX) systems
6.3.2.6 Others
6.3.3 Racks
6.3.4 Ductwork
6.3.5 Raised Flooring
6.3.6 Others
6.4 Networking infrastructure
6.5 Others
Chapter 7 Market Estimates & Forecast, By End Use, 2021 - 2032 ($Bn)
7.1 Key trends
7.2 BFSI
7.3 Energy
7.4 Government
7.5 Healthcare
7.6 Manufacturing
7.7 IT & telecom
7.8 Others
Chapter 8 Market Estimates & Forecast, By Region, 2021 - 2032 ($Bn)
8.1 Key trends
8.2 North America
8.2.1 U.S.
8.2.2 Canada
8.2.3 Mexico
8.3 Europe
8.3.1 UK
8.3.2 Germany
8.3.3 France
8.3.4 Italy
8.3.5 Spain
8.3.6 Russia
8.3.7 Rest of Europe
8.4 Asia Pacific
8.4.1 China
8.4.2 India
8.4.3 Japan
8.4.4 Australia
8.4.5 South Korea
8.4.6 Southeast Asia
8.4.7 Rest of Asia Pacific
8.5 Latin America
8.5.1 Brazil
8.5.2 Argentina
8.5.3 Colombia
8.5.4 Chile
8.5.5 Rest of Latin America
8.6 MEA
8.6.1 UAE
8.6.2 Saudi Arabia
8.6.3 South Africa
8.6.4 Rest of MEA
Chapter 9 Company Profiles
9.1 AECOM Technology Corporation
9.2 AirTrunk Holding Limited
9.3 Alibaba Cloud
9.4 Amazon Web Services (AWS)
9.5 Apple iCloud
9.6 Aurecon Group Pty Ltd
9.7 Baidu Cloud
9.8 Chindata Group Holdings Limited
9.9 Digital Realty Trust, Inc.
9.10 DPR Construction, Inc.
9.11 Equinix, Inc.
9.12 Facebook (Meta)
9.13 GDS Holdings Limited
9.14 Global Switch Holdings Limited
9.15 Google Cloud Platform (GCP)
9.16 IBM Cloud
9.17 Microsoft Azure
9.18 NTT Global Data Centers Holding Corporation
9.19 Oracle Cloud Infrastructure (OCI)
9.20 Tencent Cloud
Content is provided by our partners and every effort is made to make Market Report details as clear as possible. If you are not sure the exact content you require is included in this study you can Contact us to double check. To do this you can:
Use the ‘? ASK A QUESTION’ below the license / prices and to the right of this box. This will come directly to our team who will work on dealing with your request as soon as possible.
Write to directly on support@scotts-international.com with details. Please include as much information as possible including the name of report or link so our staff will be able to work on you request.
Telephone us directly on 0048 603 394 346 and an experienced member of team will be on hand to answer.
With the vast majority of our partners we can obtain Sample Pages to support your decision. This is something we can arrange without revealing your personal details.
It is important to note that we will not be able to provide you the exact data or statistics such as Market Size and Forecasts. Sample pages usually confirm the layout or the Categories included in Charts and Graphs, excluding specific data.
To ask for Sample Pages by contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Whilst we try to make our online platform as easy to use as possible there is always the possibility that a better alternative has not been found in your search.
To avoid this possibility Contact us through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346 and a Senior Team Member can review your requirements and send a list of possibilities with opinions and recommendations.
All prices are set by our partners and should be exactly the same as those listed on their own websites. We work on a Revenue share basis ensuring that you never pay more than what is offered elsewhere.
Should you find the price cheaper on another platform we recommend you to Contact us as we should be able to match this price. You can Contact us though through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
As we work in close partnership with our Partners from time to time we can secure discounts and assist with negotiations, this is part of our personalised service to you.
Discounts can sometimes be arranged for speedily placed orders; multiple report purchases or Higher License purchases.
To check if a Discount is possible please Contact our experienced team through ‘? ASK A QUESTION’, support@scotts-international.com, or by telephoning 0048 603 394 346.
Most Market Reports on our platform are listed in USD or EURO based on the wishes of our Partners. To avoid currency fluctuations and potential price differentiations we do not offer the possibility to change the currency online.
Should you wish to pay in a different currency to that advertised online we do accept payments in USD, EURO, GBP and PLN. The price will be calculated based on the relevant exchange rate taken from our National Bank.
To pay in a different above currency to that advertised online please Contact our team and a quotation will be sent within a couple of hours with payment details.
License options vary from Partner to Partner as is usually based on the number of Users that will benefitting from the report. It is very important that License ordered is not breached as this could have potential negative consequences for you individually or your employer.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The Global Site License is the most comprehensive license available. By selecting this license, the Market Report can be shared with other ‘Allowed Users’ and any other member of staff from the same organisation regardless of geographic location.
It is important to note that this may exclude Parent Companies or Subsidiaries.
If you have questions or need confirmation about the specific license we recommend you to Contact us and a detailed explanation will be provided.
The most common format is PDF, however in certain circumstances data may be present in Excel format or Online, especially in the case of Database or Directories. In addition, for certain higher license options a CD may also be provided.
If you have questions or need clarification about the specific formats we recommend you to Contact us and a detailed explanation will be provided.
Delivery is fulfilled by our partners directly. Once an order has been placed we inform the partner by sharing the delivery email details given in the order process.
Delivery is usually made within 24 hours of an order being placed, however it may take longer should your order be placed prior to the weekend or if otherwise specified on the Market Report details page. Additionally, if details have been not fully completed in the Order process a delay in delivery is possible.
If a delay in delivery is expected you will be informed about it immediately.
As most Market Reports are delivered in PDF format we almost never have to add additional Shipping Charges. If, however you are ordering a Higher License service or a specific delivery format (e.g. CD version) charges may apply.
If you are concerned about additional Shipping Charges we recommend you to Contact us to double check.
We work in Partnership with PayU to ensure payments are made securely in a fast and effortless way. PayU is the e-payments division of Naspers.
Naspers operates in over 133 International Markets and ranks 3rd Globally in terms of the number of e-commerce customers served.
For more information on PayU please visit: https://www.payu.pl/en/about-us
If you require an invoice prior to payment, this is possible. To ensure a speedy delivery of the Market Report we require all relevant company details and you agree to maximum payment terms of 30 days from receipt of order.
With our regular clients deliver of the Market Report can be made prior to receiving payment, however in some circumstances we may ask for payment to be received before arranging for the Market Report to be delivered.
We have specifically partnered with leading International companies to protect your privacy by using different technologies and processes to ensure security.
Everything submitted to Scotts International is encrypted via SSL (Secure Socket Layer) and all personal information provided to Scotts International is stored on computer systems with limited access in controlled environments.
We partner with PayU (https://www.payu.pl/en/about-us) to ensure all credit card payments are made securely in a fast and effortless way.
PayU offers 250+ various payment channels and eWallet services across 4 continents allowing buyers to pay electronically, whether on a computer or a mobile device.